Title 10 · Armed ForcesThe military
Changes to 10 U.S.C. § 2911
H.R. 8800 · National Defense Authorization Act for Fiscal Year 2027 · Engrossed The official text as one chamber (House or Senate) passed it.
Passed the House · step 3 of 5
10 U.S.C. § 2911 Energy policy of the Department of Defense
7 changes the bill asks for here, 7 carried out
- Carried out:
in subsections (b) and (e), by inserting
or nuclear energy
afterrenewable energy sources
each place it appears; - Carried out:
in the heading, by inserting
and nuclear energy
afterrenewable energy
; - Carried out:
in paragraphs (1) and (2), by inserting
or nuclear energy
afterrenewable energy sources
each place it appears; and - Carried out:
in paragraph (2), by inserting
and nuclear energy
afterthe use of renewable energy
; and - Carried out:
in subparagraph (C), by inserting
or nuclear energy
afterrenewable energy source, other than solar energy,
; and - Carried out:
in subparagraph (D), by inserting
or nuclear energy
aftera renewable energy source
. - Carried out:
Section 2911 of title 10, United States Code, is amended by adding at the end the following new subsection:
(k) Sustainable aviation fuel procurement.— The Secretary of Defense may procure sustainable aviation fuel for operational or training purposes at a cost that exceeds the cost of conventional petroleum based aviation fuel..
§ 2911(b)–(c)
Start of § 2911 to (b)(3) unchanged
| Where | Mark | Text |
|---|---|---|
| (b)(4) | (4) | |
| authorize the use of energy security and energy resilience, including the benefits of on-site generation resources that reduce or avoid the cost of backup power, as factors in the cost-benefit analysis for procurement of energy; and | ||
| (b)(5) | (5) | |
| in selecting facility energy projects that will use renewable energy sources, pursue energy security and energy resilience by giving favorable consideration to projects that provide power directly to a military facility or into the installation electrical distribution network. | ||
| in selecting facility energy projects that will use renewable energy sources[inserted: or nuclear energy], pursue energy security and energy resilience by giving favorable consideration to projects that provide power directly to a military facility or into the installation electrical distribution network. | ||
| (c) | (c) Energy Performance Goals.— | |
| (c)(1) | (1) | |
| The Secretary of Defense shall submit to the congressional defense committees the energy performance goals for the Department of Defense regarding transportation systems, support systems, utilities, and infrastructure and facilities. |
§ 2911(e)Special Considerations.—(7)–(12)
(c)(2)–(e)(6) unchanged
| Where | Mark | Text |
|---|---|---|
| (7) | (7) | |
| The value of economies-of-scale associated with fewer energy types used. | ||
| (8) | (8) | |
| The value of the use of renewable energy sources. | ||
| The value of the use of renewable energy sources[inserted: or nuclear energy]. | ||
| (9) | (9) | |
| The potential for an action to serve as an incentive for members of the armed forces and civilian personnel to reduce energy consumption or adopt an improved energy performance measure. | ||
| (10) | (10) | |
| Opportunities for improving energy security for facility energy projects that will use renewable energy sources. | ||
| Opportunities for improving energy security for facility energy projects that will use renewable energy sources[inserted: or nuclear energy]. | ||
| (11) | (11) | |
| Opportunities to leverage financing provided by a non-Department entity to address installation energy needs. | ||
| (12) | (12) | |
| The reliability and security of energy resources in the event of a military conflict. |
§ 2911(f)–(g)
(e)(13)–(f)(2) unchanged
| Where | Mark | Text |
|---|---|---|
| (f)(3) | (3) | |
| are consistent with the energy performance goals and energy performance master plan for the Department; and | ||
| (f)(4) | (4) | |
| are supported by the special considerations specified in subsection (c). | ||
| (g) | (g) Goal Regarding Use of Renewable Energy To Meet Facility Energy Needs.— | |
| (g) Goal Regarding Use of Renewable Energy [inserted: and nuclear energy ]To Meet Facility Energy Needs.— | ||
| (g)(1) | (1) | |
| It shall be the goal of the Department of Defense— | ||
| (g)(1)(A) | (A) | |
| to produce or procure not less than 25 percent of the total quantity of facility energy it consumes within its facilities during fiscal year 2025 and each fiscal year thereafter from renewable energy sources; and | ||
| to produce or procure not less than 25 percent of the total quantity of facility energy it consumes within its facilities during fiscal year 2025 and each fiscal year thereafter from renewable energy sources[inserted: or nuclear energy]; and | ||
| (g)(1)(B) | (B) | |
| to produce or procure facility energy from renewable energy sources whenever the use of such renewable energy sources is consistent with the energy performance goals and energy performance master plan for the Department and supported by the special considerations specified in subsection (c). | ||
| to produce or procure facility energy from renewable energy sources [inserted: or nuclear energy ]whenever the use of such renewable energy sources [inserted: or nuclear energy ]is consistent with the energy performance goals and energy performance master plan for the Department and supported by the special considerations specified in subsection (c). | ||
| (g)(2) | (2) | |
| To help ensure that the goal specified in paragraph (1)(A) regarding the use of renewable energy by the Department of Defense is achieved, the Secretary of Defense shall establish an interim goal for fiscal year 2018 for the production or procurement of facility energy from renewable energy sources. | ||
| To help ensure that the goal specified in paragraph (1)(A) regarding the use of renewable energy [inserted: and nuclear energy ]by the Department of Defense is achieved, the Secretary of Defense shall establish an interim goal for fiscal year 2018 for the production or procurement of facility energy from renewable energy sources[inserted: or nuclear energy]. | ||
| (g)(3) | (3) | |
| (g)(3)(A) | (A) | |
| The Secretary of Defense shall establish a policy to maximize savings for the bulk purchase of replacement renewable energy certificates in connection with the development of facility energy projects using renewable energy sources. |
§ 2911(h)Promotion of On-Site Energy Security and Energy Resilience.—(2)–(3)
(g)(3)(B)–(h)(2)(A) unchanged
| Where | Mark | Text |
|---|---|---|
| (2)(B) | (B) | |
| At least one project shall be designed to develop technology that demonstrates the ability to connect an existing on-site energy generation facility that uses solar power with one or more installation facilities performing critical missions in a manner that allows the generation facility to continue to provide electrical power to these facilities even if the installation is disconnected from the commercial power supply. | ||
| (2)(C) | (C) | |
| At least one project shall be designed to develop technology that demonstrates that one or more installation facilities performing critical missions can be isolated, for purposes of electrical power supply, from the remainder of the installation and from the commercial power supply in a manner that allows an on-site energy generation facility that uses a renewable energy source, other than solar energy, to provide the necessary power exclusively to these facilities. | ||
| At least one project shall be designed to develop technology that demonstrates that one or more installation facilities performing critical missions can be isolated, for purposes of electrical power supply, from the remainder of the installation and from the commercial power supply in a manner that allows an on-site energy generation facility that uses a renewable energy source, other than solar energy, [inserted: or nuclear energy ]to provide the necessary power exclusively to these facilities. | ||
| (2)(D) | (D) | |
| At least two projects shall be designed to develop technology that demonstrates the ability to store sufficient electrical energy from an on-site energy generation facility that uses a renewable energy source to provide the electrical energy required to continue operation of installation facilities performing critical missions during nighttime operations. | ||
| At least two projects shall be designed to develop technology that demonstrates the ability to store sufficient electrical energy from an on-site energy generation facility that uses a renewable energy source [inserted: or nuclear energy ]to provide the electrical energy required to continue operation of installation facilities performing critical missions during nighttime operations. | ||
| (2)(E) | (E) | |
| The authority of the Secretary of Defense to commence a project under this paragraph expires on September 30, 2025. | ||
| (3) | (3) | |
| In this subsection, the term “microgrid” means an integrated energy system consisting of interconnected loads and energy resources that, if necessary, can be removed from the local utility grid and function as an integrated, stand-alone system. |
§ 2911(j)–(k)
(i)–(j) unchanged
| Where | Mark | Text |
|---|---|---|
| (j)(2)(A)(ii) | (ii) | |
| funds appropriated for the Facilities Sustainment, Restoration, and Modernization program of the Department; and | ||
| (j)(2)(B) | (B) | |
| funding available under performance contracts, such as energy savings performance contracts and utility energy service contracts. | ||
| (k) | (k) [inserted: Sustainable aviation fuel procurement.—] | |
| [inserted: The Secretary of Defense may procure sustainable aviation fuel for operational or training purposes at a cost that exceeds the cost of conventional petroleum based aviation fuel.] |