Title 10 · Armed ForcesThe military
Changes to 10 U.S.C. § 492a
H.R. 8800 · National Defense Authorization Act for Fiscal Year 2027 · Engrossed The official text as one chamber (House or Senate) passed it.
Passed the House · step 3 of 5
10 U.S.C. § 492a Biennial report on the plan for the nuclear weapons stockpile, nuclear weapons complex, nuclear weapons delivery systems, and nuclear weapons command and control system
5 changes the bill asks for here, 5 carried out
- Carried out:
In the heading, by striking
Biennial
and insertingQuadrennial
. - Carried out:
in paragraph (1), by striking
2029
and inserting2027, and on a quadrennial basis thereafter,
; and - Carried out:
in subparagraph (A), by striking
enhance the safety, security, and reliability of
and insertingsustain and modernize
; and - Carried out:
by striking
10-year period following the date of the report
and insertingperiod covered by the future-years defense program submitted to Congress under section 221 of this title
; and - Carried out:
by striking
such 10-year period
and insertingsuch period
.
§ 492a(a)
§ 492a. [struck: Biennial][inserted: Quadrennial] report on the plan for the nuclear weapons stockpile, nuclear weapons complex, nuclear weapons delivery systems, and nuclear weapons command and control system
(a) Report Required.—
(1) In general.— Not later than 30 days after the submission to Congress of the budget of the President under section 1105(a) of title 31, United States Code, for each of the odd-numbered fiscal years 2013 through [struck: 2029][inserted: 2027], [inserted: and on a quadrennial basis thereafter,, ]the President, in consultation with the Secretary of Defense and the Secretary of Energy, shall transmit to the congressional defense committees, the Committee on Foreign Relations of the Senate, and the Committee on Foreign Affairs of the House of Representatives a detailed report on the plan for the nuclear weapons stockpile, nuclear weapons complex, nuclear weapons delivery systems, and nuclear weapons command and control system.
(2) Elements.— Each report required under paragraph (1) shall include the following:
(A) A detailed description of the plan to [struck: enhance][inserted: sustain] [struck: the safety, security, ]and [struck: reliability][inserted: modernize] [struck: of ]the nuclear weapons stockpile of the United States.
(B) A detailed description of the plan to sustain and modernize the nuclear weapons complex, including improving the safety of facilities, modernizing the infrastructure, and maintaining the key capabilities and competencies of the nuclear weapons workforce, including designers and technicians.
(C) A detailed description of the plan to maintain, modernize, and replace delivery systems for nuclear weapons.
(D) A detailed description of the plan to sustain and modernize the nuclear weapons command and control system.
(E) A detailed description of any plans to retire, dismantle, or eliminate any nuclear warheads or bombs, nuclear weapons delivery systems, or any platforms (including silos and submarines) which carry such nuclear warheads, bombs, or delivery systems.
(F) In accordance with paragraph (3), a detailed estimate of the budget requirements associated with sustaining and modernizing the nuclear deterrent of the United States and the nuclear weapons stockpile of the United States, including the costs associated with the plans outlined under subparagraphs (A) through (E), over the [struck: 10-year ]period [struck: following][inserted: covered] [inserted: by ]the [struck: date][inserted: future-years] [inserted: defense program submitted to Congress under section 221 ]of [struck: the][inserted: this] [struck: report][inserted: title], including the applicable and appropriate costs associated with the procurement, military construction, operation and maintenance, and research, development, test, and evaluation accounts of the Department of Defense. The Secretary may include information and data for a period beyond such [struck: 10-year ]period if the Secretary determines that such information and data is accurate and useful in understanding the long-term nuclear modernization plan.
(G) A detailed description of the steps taken to implement the plan submitted in the previous report, including difficulties encountered in implementing the plan in the previous report.
(3) Budget estimate contents and methodology.— Each budget estimate under paragraph (2)(F) shall include a detailed description of the costs included in such estimate and the methodology used to create such estimate.
Rest of § 492a unchanged ·