Changes to 46 U.S.C. § 54301
H.R. 8800 · National Defense Authorization Act for Fiscal Year 2027 · Engrossed The official text as one chamber (House or Senate) passed it.
Passed the House · step 3 of 5
46 U.S.C. § 54301 Port infrastructure development program
3 changes the bill asks for here, 3 carried out
- Carried out:
by striking
including projects to improve port resilience;
and insertingincluding—
; and - Carried out:
by adding at the end the following:
(aa) projects to improve port resilience; and (bb) projects to upgrade port cranes or parts of port cranes (including hardware and software) that— (AA) were installed or provided by the People's Republic of China or any department, ministry, center, agency, or instrumentality of …
- Carried out:
by adding at the end the following new subsection:
(d) Eligibility of shore power projects.— (1) In general.— In making port infrastructure development grants under this section, the Secretary shall treat a project described in paragraph (2) as— (A) having met the requirements of paragraphs (1) and (6)(A)(i); and (B) being an …
§ 54301(a)(3)(A)(ii)will be used to improve the safety, efficiency, or reliability of—(II)–(IV)
Start of § 54301 to (a)(3)(A)(ii)(I) unchanged
| Where | Mark | Text |
|---|---|---|
| (II) | (II) | |
| the movement of goods into, out of, around, or within a port, such as for highway or rail infrastructure, intermodal facilities, freight intelligent transportation systems, and digital infrastructure systems; | ||
| (III) | (III) | |
| operational improvements, including | ||
| operational improvements, including[inserted: —] | ||
| (III)(aa) | (aa) [inserted: ] | |
| [inserted: projects to improve port resilience; and] | ||
| (III)(bb) | (bb) [inserted: ] | |
| [inserted: projects to upgrade port cranes or parts of port cranes (including hardware and software) that—] | ||
| (III)(bb)(AA) | (AA) [inserted: ] | |
| [inserted: were installed or provided by the People's Republic of China or any department, ministry, center, agency, or instrumentality of the Government of the People's Republic of China; or] | ||
| (III)(bb)(BB) | (BB) [inserted: ] | |
| [inserted: are maintained, controlled, or sponsored by the People's Republic of China or any department, ministry, center, agency, or instrumentality of the Government of the People's Republic of China;] | ||
| (IV) | (IV) | |
| environmental and emission mitigation measures; including projects for— | ||
| (IV)(aa) | (aa) | |
| port electrification or electrification master planning; |
§ 54301(c)–(d)
(a)(3)(A)(ii)(IV)(bb)–(c)(1) unchanged
| Where | Mark | Text |
|---|---|---|
| (c)(2) | (2) | |
| seek to coordinate all reviews or requirements with appropriate Federal, State, and local agencies; and | ||
| (c)(3) | (3) | |
| in addition to any financial assistance provided under subsection (a) or subsection (b), provide such technical assistance to any eligible applicants as described in subsection (a)(2). | ||
| (d) | (d) [inserted: Eligibility of shore power projects.—] | |
| (d)(1) | (1) [inserted: In general.—] | |
| [inserted: In making port infrastructure development grants under this section, the Secretary shall treat a project described in paragraph (2) as—] | ||
| (d)(1)(A) | (A) [inserted: ] | |
| [inserted: having met the requirements of paragraphs (1) and (6)(A)(i); and] | ||
| (d)(1)(B) | (B) [inserted: ] | |
| [inserted: being an eligible project under subsection (a)(3).] | ||
| (d)(2) | (2) [inserted: Project described.—] | |
| [inserted: A project described in this paragraph is a project to provide shore power at a port that services both of the following:] | ||
| (d)(2)(A) | (A) [inserted: ] | |
| [inserted: Passenger vessels described in section 3507(k).] | ||
| (d)(2)(B) | (B) [inserted: ] | |
| [inserted: Vessels that move goods or freight.] |