Title 10 · Armed ForcesThe military
Changes to 10 U.S.C. § 2864
H.R. 8870 · BUILD America 250 Act · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
Reported by committee · step 2 of 5
10 U.S.C. § 2864 Master plans for major military installations
1 change the bill asks for here, 1 carried out
- Carried out:
Section 2864(e)(2) of title 10, United States Code, is amended by striking
section 5303(b)
and insertingsection 5331(b)
.
§ 2864(e)Definitions.—(1)–(4)
Start of § 2864 to (e) unchanged ·
(1) The term “major military installation” has the meaning given to the term “large site” in the most recent version of the Department of Defense Base Structure Report issued before the time interval prescribed for development of installation master plans arises under subsection (a).
(2) The terms “metropolitan planning area” and “metropolitan planning organization” have the meanings given those terms in section 134(b) of title 23 and section [struck: 5303][inserted: 5331](b) of title 49.
(3) The term “energy and climate resiliency” means anticipation, preparation for, and adaptation to utility disruptions and changing environmental conditions and the ability to withstand, respond to, and recover rapidly from utility disruptions while ensuring the sustainment of mission-critical operations.
(4) The term “military installation resilience” has the meaning given that term in section 101(e)1 of this title.