H.R. 8870 · BUILD America 250 Act · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
Reported by committee · step 2 of 5
Sections are cited like “7 U.S.C. § 2012”: Title One of the 54 subject areas the Code is divided into, such as Title 7 (Agriculture) or Title 26 (taxes). A title is split into chapters. 7 of the U.S.C. (United States Code) The United States Code: the federal laws in force, arranged by subject. "4 U.S.C. § 8" means title 4, section 8., Section (§) The basic unit of the Code, marked §. Each section has a number within its title and is cited like "7 U.S.C. § 2012". 2012.
Section 124 of title 23, United States Code, is amended to read as follows:124. Grants for rebuilding America’s vital engineering structures program (a) State apportionment mechanism.— (1) In general.— The Secretary shall establish a program to provide grants to each State in accordance with the apportionment formula described in paragraph (3) for the …
§ 124· (a)–(q)
Where
Mark
Text
−
§ 124.[struck: Bridge][struck: investment] program
[inserted: The Secretary shall establish a program to provide grants to each State in accordance with the apportionment formula described in paragraph (3) for the construction of new bridges and to improve the safety, efficiency, reliability, capacity, and utility of bridges and other structures in the United States.]
[struck: The term “eligible project” means a project to replace, rehabilitate, preserve, or protect 1 or more bridges on the National Bridge Inventory under section 144(b).]
[struck: a bundle of projects described in subparagraph (A), regardless of whether the bundle of projects meets the requirements of section 144(j)(5); and]
[struck: a project to replace or rehabilitate culverts for the purpose of improving flood control and improved habitat connectivity for aquatic species.]
[inserted: Funds apportioned to a State under this subsection may only be obligated for projects to construct, replace, rehabilitate, preserve, protect, expand, or improve—]
[inserted: development phase activities, including planning, feasibility analysis, revenue forecasting, environmental review, preliminary engineering and design work, and other preconstruction activities;]
[inserted: construction, reconstruction, rehabilitation, acquisition of real property (including land related to the project and improvements to the land), environmental mitigation, construction contingencies, acquisition of equipment, and operational improvements directly related to improving system performance; and]
[inserted: 25 percent by the proportion of the total bridge deck area classified as in poor condition in such State that bears to the sum of the total bridge deck area classified in poor condition in all States.]
[inserted: 25 percent by the proportion of the total bridge deck area of bridges on the National Highway System in such State that bears to the sum of the total National Highway System bridge deck area in all States.]
[inserted: 25 percent by the proportion of the total bridge deck area of bridges on the National Highway System that is classified as in poor condition in such State that bears to the sum of the total bridge deck area of bridges on the National Highway System that is classified as in poor condition in all States.]
[inserted: Notwithstanding subparagraph (A), the Secretary shall adjust the amounts apportioned to each State to ensure that each State receives an amount equal to at least the amount such State received in fiscal year 2026 under paragraph (1) under the heading “Highway Infrastructure Programs” in title VIII of division J of the Infrastructure Investment and Jobs Act (135 Stat. 1420), commonly referred to as the “Bridge Formula Program”.]
[inserted: Except as provided under clause (ii), of the amounts apportioned to a State under this paragraph for each fiscal year, the State shall ensure that not less than 20 percent of such amounts are used for purposes relating to off-system bridges (as defined in section 133(f)(1)).]
[inserted: The Secretary, in consultation with relevant State and local officials, may reduce the set aside requirement for a State under clause (i) if the Secretary determines that the State has an insufficient number of projects relating to off-system bridges.]
[inserted: In determining the off-system bridges for which amounts shall be set aside under this subparagraph shall be used, each State shall consult with, as applicable, relevant metropolitan planning organizations, regional transportation planning organizations, and other non-State owners of off-system bridges.]
(iv)[inserted: Inclusion of locally-owned bridges.—]
[inserted: Amounts set aside under subparagraph (D) that are used for purposes relating to locally-owned bridges that are off-system bridges shall count towards the amount required to be used for off-system bridges by a State under clause (i).]
[inserted: Except as provided under clause (ii), of the amounts apportioned to a State under this paragraph for each fiscal year, the State shall set aside not less than 25 percent to fund a competitive process for locally-owned bridges as described in clause (iv) of this subparagraph.]
[inserted: The Secretary, in consultation with relevant State and local officials, may reduce the set aside requirement for a State under clause (i) only if the Secretary determines that the State has an insufficient number of projects relating to locally-owned bridges.]
[inserted: A State required to obligate funds in accordance with this subparagraph shall conduct a competitive process to select projects for funding.]
[inserted: In this subsection, the term “locally-owned bridge” means a bridge owned by a county, town, township, city, municipality, or other local entity.]
[inserted: Except as provided in clause (ii), of the amounts apportioned to a State under this paragraph for each fiscal year, the State may use not more than 5 percent of such amounts for projects that consist solely of culvert replacement or rehabilitation.]
[inserted: The limitation under clause (i) shall not apply if a State is required by an injunction issued by a Federal court to modify or replace culverts.]
[inserted: For purposes of determining the amount apportioned to each State pursuant to subparagraph (A), the Secretary shall calculate such formula using the most recently available data from the national bridge inventory established under section 144(b).]
[inserted: The Federal share of the cost of a project carried out under this subsection shall be determined in accordance with section 120, except that, in the case of such a project for an off-system bridge that is a locally-owned bridge or is owned by a federally-recognized Tribe, the Federal share shall be 95 percent.]
[inserted: A State may only transfer amounts apportioned under this subsection if the Secretary determines that the State has an insufficient number of eligible projects for which such amounts may be used.]
[inserted: Notwithstanding any other provision of law, a project carried out with amounts apportioned under this subsection shall be treated as a project on a Federal-aid highway under this chapter.]
[inserted: Of amounts made available to carry out this subsection, $200,000,000 for each fiscal year through fiscal year 2031 shall be available to the Secretary, through the Administrator of the Federal Highway Administration, to make competitive grants under section 6703 of title 49.]
[inserted: The Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate, and make publicly available, an annual report describing—]
[inserted: national trends regarding the condition of bridges, including the effectiveness of such projects in reducing the number of bridges in poor condition and that require posted weight restrictions; and]
[inserted: The][inserted: Secretary][inserted: shall][inserted: establish ]a [inserted: program][inserted: for][inserted: the][inserted: purpose][inserted: of][inserted: awarding][inserted: grants,][inserted: on][inserted: a competitive basis, to ]eligible [inserted: entities][inserted: to][inserted: improve][inserted: the safety, efficiency, reliability, capacity, and utility of bridges in the United States].
[inserted: A grant provided under this subsection may only be used for projects ]to [inserted: construct,][inserted: replace,][inserted: rehabilitate], [inserted: preserve], [inserted: protect,][inserted: expand,][inserted: or][inserted: improve][inserted: a][inserted: bridge][inserted: on][inserted: the][inserted: National][inserted: Highway][inserted: System.]
[inserted: a bundle of projects described in subparagraph (A), regardless of whether the bundle of projects meets the requirements of section 144(j)(5); and]
[inserted: development phase activities, including planning, feasibility analysis, revenue forecasting, environmental review, preliminary engineering and design work, and other preconstruction activities;]
[inserted: construction, reconstruction, rehabilitation, acquisition of real property (including land related to the project and improvements to the land), environmental mitigation, construction contingencies, acquisition of equipment, and operational improvements directly related to improving system performance; and]
[inserted: in an amount that is sufficient (in combination with other financial resources identified in the application for such grant) to fully fund the project for which the grant is awarded; and]
[inserted: The amount of assistance provided by the Secretary under this subsection for a project shall not exceed 50 percent of the total cost of the project.]
[inserted: Federal assistance other than a grant provided under this subsection may be used to satisfy the non-Federal share of the cost of a project for which a grant is provided under this subsection, except that the total Federal assistance provided for such a project may not exceed the applicable Federal share for the project under section 120.]
(C)[inserted: Federal land management agencies and Tribal governments.—]
[inserted: Notwithstanding any other provision of law, Federal assistance other than a grant provided under this subsection may be used to pay the remaining share of the cost of a project carried out with a grant provided under this subsection by a Federal land management agency or a Tribal government or consortium of Tribal governments.]
[inserted: To be eligible for a grant under this subsection, an eligible entity shall submit to the Secretary an application at such time, in such manner, and containing such information as the Secretary may require, including all necessary information required for the Secretary to—]
[inserted: In the case of a project proposed to be carried out by a Federal land management agency, the extent to which the grant would reduce a Federal liability or Federal infrastructure maintenance backlog.]
[inserted: The extent to which the project is for a bridge that does not meet the most up-to-date geometric design standards based on the type and use of the bridge.]
[inserted: The extent to which the project is for a bridge that does not meet the most up-to-date seismic design standards or incorporate adequate impact protection measures.]
[inserted: On the request of an eligible entity carrying out a project with a grant provided under this subsection, the Secretary may use amounts awarded to the entity to pay subsidy and administrative costs necessary to provide to the entity Federal credit assistance under chapter 6 with respect to the project for which the grant was awarded.]
[inserted: A project carried out with a grant provided under this subsection may be carried out through a multiyear grant agreement in accordance with this paragraph.]
[inserted: establish a payout schedule for the project that provides for disbursement of the full grant amount by not later than 4 fiscal years after the fiscal year in which the initial amount is provided;]
[inserted: may include a commitment, contingent on an amount to be specified in law in advance for commitments under this paragraph, to obligate an additional amount from future available budget authority specified in law.]
[inserted: Interest and other financing costs of carrying out a part of the project within a reasonable time shall be considered a cost of carrying out the project under a multiyear grant agreement, except that the eligible costs may not be more than the cost of the most favorable financing terms reasonably available for the project at the time of borrowing.]
[inserted: The applicant shall certify to the Secretary that the applicant has shown reasonable diligence in seeking the most favorable financing terms.]
[inserted: may use funds made available to the entity under this title for eligible project costs of the project until the amount specified in the multiyear grant agreement for the project for that fiscal year becomes available for obligation; and]
[inserted: if the eligible entity uses funds described in subclause (I), the funds used shall be reimbursed from the amount made available under the multiyear grant agreement for the project.]
[inserted: The Secretary may pay to an eligible entity all eligible project costs described in paragraph (2)(B), including costs for an activity for a project incurred prior to the date on which the project receives funding under this subsection if—]
[inserted: before the eligible entity carries out the activity, the Secretary approves through a letter to the applicant the activity in the same manner as the Secretary approves other activities as eligible under this subsection;]
[inserted: a record of decision, a finding of no significant impact, or a categorical exclusion under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) has been issued for the project; and]
[inserted: For the purposes of subparagraph (A), the cost of carrying out an activity for a project under this subsection includes the amount of interest and other financing costs, including any interest earned and payable on bonds, to the extent the interest and other financing costs are expended in carrying out the activity for the project, except that interest and other financing costs may not be more than the cost of the most favorable financing terms reasonably available for the project at the time of borrowing.]
[inserted: The applicant shall certify to the Secretary that the applicant has shown reasonable diligence in seeking the most favorable financing terms under clause (i).]
(9)[inserted: Divestiture consideration for federally-owned bridges.—]
[inserted: In the case of a bridge owned by a Federal land management agency for which the agency applies for a grant under this subsection, the agency—]
[inserted: Notwithstanding any other provision of law, a project assisted under this subsection shall be treated as a project on a Federal-aid highway under this chapter.]
[inserted: Not later than 3 days before providing a grant for a project under this subsection, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a written notification of such grant.]
[struck: to provide financial assistance that leverages and encourages non-Federal contributions from sponsors and stakeholders involved in the planning, design, and construction of eligible projects.]
[struck: Except as otherwise provided, for an eligible project receiving assistance under the program, the amount of assistance provided by the Secretary under this section, as a share of eligible project costs, shall be—]
[struck: Federal assistance other than a grant under the program may be used to satisfy the non-Federal share of the cost of a project for which a grant is made, except that the total Federal assistance provided for a project receiving a grant under the program may not exceed the Federal share for the project under section 120.]
[struck: notwithstanding subparagraph (A), the total Federal assistance provided for the project shall not exceed 90 percent of the total eligible project costs.]
(C)[struck: Federal land management agencies and tribal governments.—]
[struck: Notwithstanding any other provision of law, Federal funds other than Federal funds made available under this section may be used to pay the remaining share of the cost of a project under the program by a Federal land management agency or a Tribal government or consortium of Tribal governments.]
[struck: in the case of an eligible project of a Federal land management agency, the extent to which the grant would reduce a Federal liability or Federal infrastructure maintenance backlog;]
[struck: 2 or more applications for eligible projects within the State were submitted for the current fiscal year and an average of 2 or more applications for eligible projects within the State were submitted in prior fiscal years of the program; and]
[struck: 2 eligible projects that are not large projects that the Secretary determines are justified under the evaluation under subsection (f)(3); and]
[struck: not be required to award a grant for an eligible project that the Secretary does not determine is justified under an evaluation under subsection (f)(3) or (g)(4).]
[struck: Not more than 5 percent of the amounts made available for each fiscal year for grants under the program may be used for eligible projects that consist solely of culvert replacement or rehabilitation.]
[struck: A metropolitan planning organization that serves an urbanized area (as designated by the Bureau of the Census) with a population of over 200,000.]
[struck: in the case of a large project, the Secretary recommends for funding in the annual report on funding recommendations under subsection (g)(6), except as provided in subsection (g)(1)(B);]
[struck: for the first fiscal year for which funds are made available for obligation under the program, not later than 60 days after the date on which the template under subparagraph (B)(i) is developed, and in subsequent fiscal years, not later than 60 days after the date on which amounts are made available for obligation under the program, solicit grant applications for eligible projects other than large projects; and]
[struck: enable applicants to use data from the National Bridge Inventory under section 144(b) to populate templates described in clause (i), as applicable.]
[struck: An eligible entity shall submit to the Secretary an application at such time, in such manner, and containing such information as the Secretary may require.]
[struck: consider information on project benefits submitted by the applicant using the template developed under paragraph (1)(B)(i), including whether the project will generate, as determined by the Secretary—]
[struck: consider whether and the extent to which the benefits, including the benefits described in clause (i), are more likely than not to outweigh the total project costs.]
[struck: The Secretary shall establish an annual date by which an eligible entity submitting an application for a large project shall submit to the Secretary such information as the Secretary may require, including information described in paragraph (2), in order for a large project to be considered for a recommendation by the Secretary for funding in the next annual report under paragraph (6).]
[struck: Notwithstanding subparagraph (A), for the first fiscal year for which funds are made available for obligation for grants under the program, the Secretary may establish a date by which an eligible entity submitting an application for a large project shall submit to the Secretary such information as the Secretary may require, including information described in paragraph (2), in order for a large project to be considered for immediate execution of a grant agreement.]
[struck: On making a determination that information submitted to the Secretary under paragraph (1) is sufficient, the Secretary shall provide a written notice of that determination to—]
[struck: The Secretary may recommend a large project for funding in the annual report under paragraph (6), or, in the case of the first fiscal year for which funds are made available for obligation for grants under the program, immediately execute a grant agreement for a large project, only if the Secretary evaluates the proposed project and determines that the project is justified because the project—]
[struck: addresses a need to improve the condition of the bridge, as determined by the Secretary, consistent with the goals of the program under subsection (b)(2);]
[struck: is cost effective based on an analysis of whether the benefits and avoided costs described in subparagraph (B) are expected to outweigh the project costs;]
[struck: is consistent with the objectives of an applicable asset management plan of the project sponsor, including a State asset management plan under section 119(e) in the case of a project on the National Highway System that is sponsored by a State.]
[struck: The Secretary shall develop a methodology to evaluate and rate a large project on a 5-point scale (the points of which include “high”, “medium-high”, “medium”, “medium-low”, and “low”) for each of—]
[struck: To be considered justified and receive a recommendation for funding in the annual report under paragraph (6), a project shall receive a rating of not less than “medium” for each rating required under subparagraph (A).]
[struck: In the first fiscal year for which funds are made available for obligation for grants under the program, the Secretary may establish an interim methodology to evaluate and rate a large project for each of—]
[struck: Not later than the first Monday in February of each year, the Secretary shall submit to the Committees on Transportation and Infrastructure and Appropriations of the House of Representatives and the Committees on Environment and Public Works and Appropriations of the Senate a report that includes—]
[struck: a list of large projects that have requested a recommendation for funding under a new grant agreement from funds anticipated to be available to carry out this subsection in the next fiscal year;]
[struck: a description of how amounts anticipated to be available for the program from the Highway Trust Fund for that fiscal year will be distributed; and]
[struck: for each project for which the Secretary recommends a new multiyear grant agreement under subsection (j), the proposed payout schedule for the project.]
[struck: The Secretary shall not recommend in an annual report under this paragraph a new multiyear grant agreement provided from funds from the Highway Trust Fund unless the Secretary determines that the project can be completed using funds that are anticipated to be available from the Highway Trust Fund in future fiscal years.]
[struck: the Secretary determines that the project can be completed using funds other than from the Highway Trust Fund that are anticipated to be available in future fiscal years.]
[struck: In selecting projects to recommend for funding in the annual report under this paragraph, or, in the case of the first fiscal year for which funds are made available for obligation for grants under the program, projects for immediate execution of a grant agreement, the Secretary shall—]
[struck: assume the availability of funds in future fiscal years for multiyear grant agreements that extend beyond the period of authorization based on the amount made available for large projects under the program in the last fiscal year of the period of authorization.]
[struck: In selecting projects to recommend for funding in the annual report under this paragraph, the Secretary shall ensure diversity among projects recommended based on—]
[struck: development phase activities, including planning, feasibility analysis, revenue forecasting, environmental review, preliminary engineering and design work, and other preconstruction activities;]
[struck: construction, reconstruction, rehabilitation, acquisition of real property (including land related to the project and improvements to the land), environmental mitigation, construction contingencies, acquisition of equipment, and operational improvements directly related to improving system performance; and]
[struck: On the request of an eligible entity carrying out an eligible project, the Secretary may use amounts awarded to the entity to pay subsidy and administrative costs necessary to provide to the entity Federal credit assistance under chapter 6 with respect to the eligible project for which the grant was awarded.]
[struck: A large project that receives a grant under the program in an amount of not less than $100,000,000 may be carried out through a multiyear grant agreement in accordance with this subsection.]
[struck: establish a payout schedule for the project that provides for disbursement of the full grant amount by not later than 4 fiscal years after the fiscal year in which the initial amount is provided;]
[struck: may include a commitment, contingent on amounts to be specified in law in advance for commitments under this paragraph, to obligate an additional amount from future available budget authority specified in law.]
[struck: Interest and other financing costs of carrying out a part of the project within a reasonable time shall be considered a cost of carrying out the project under a multiyear grant agreement, except that eligible costs may not be more than the cost of the most favorable financing terms reasonably available for the project at the time of borrowing.]
[struck: The applicant shall certify to the Secretary that the applicant has shown reasonable diligence in seeking the most favorable financing terms.]
[struck: may use funds made available to the eligible entity under this title for eligible project costs of the large project until the amount specified in the multiyear grant agreement for the project for that fiscal year becomes available for obligation; and]
[struck: if the eligible entity uses funds as described in subparagraph (A), the funds used shall be reimbursed from the amount made available under the multiyear grant agreement for the project.]
[struck: The Secretary may pay to an applicant all eligible project costs under the program, including costs for an activity for an eligible project incurred prior to the date on which the project receives funding under the program if—]
[struck: before the applicant carries out the activity, the Secretary approves through a letter to the applicant the activity in the same manner as the Secretary approves other activities as eligible under the program;]
[struck: a record of decision, a finding of no significant impact, or a categorical exclusion under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) has been issued for the eligible project; and]
[struck: For purposes of paragraph (1), the cost of carrying out an activity for an eligible project includes the amount of interest and other financing costs, including any interest earned and payable on bonds, to the extent interest and other financing costs are expended in carrying out the activity for the eligible project, except that interest and other financing costs may not be more than the cost of the most favorable financing terms reasonably available for the eligible project at the time of borrowing.]
[struck: The applicant shall certify to the Secretary that the applicant has shown reasonable diligence in seeking the most favorable financing terms under subparagraph (A).]
[struck: alter or influence any evaluation under subsection (f)(3)(A)(i) or (g)(4) or any recommendation by the Secretary for funding under the program.]
[struck: Notwithstanding any other provision of law, section 129 shall apply to a bridge that was previously owned by a Federal land management agency and has been transferred to a non-Federal entity under paragraph (1) in the same manner as if the bridge was never federally owned.]
[struck: Notwithstanding any other provision of law, a project assisted under this section shall be treated as a project on a Federal-aid highway under this chapter.]
[struck: Not later than 30 days before making a grant for an eligible project under the program, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a written notification of the proposed grant that includes—]
[struck: Not later than August 1 of each fiscal year, the Secretary shall make available on the website of the Department of Transportation an annual report that lists each eligible project for which a grant has been provided under the program during the fiscal year.]
[struck: Not later than 3 years after the date of enactment of the Surface Transportation Reauthorization Act of 2021, the Comptroller General of the United States shall—]
[struck: conduct an assessment of the administrative establishment, solicitation, selection, and justification process with respect to the funding of grants under the program; and]
[struck: submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report that describes—]
[struck: Of the amounts made available out of the Highway Trust Fund (other than the Mass Transit Account) to carry out this section for each of fiscal years 2022 through 2026, not less than 50 percent, in aggregate, shall be used for large projects.]
[struck: If, in fiscal year 2026, the Secretary determines that grants under the program will not allow for the requirement under paragraph (1) to be met, the Secretary shall use the unutilized amounts to make other grants under the program during that fiscal year.]
[struck: Of the amounts made available from the Highway Trust Fund (other than the Mass Transit Account) for a fiscal year to carry out this section, the Secretary shall use, to carry out section 202(d)—]
[struck: For purposes of section 201, funds made available for section 202(d) under paragraph (1) shall be considered to be part of the tribal transportation program.]