Skip to content
The People's CodeSearch
Menu

Title 23 · HighwaysTransportation

Changes to 23 U.S.C. § 503

H.R. 8870 · BUILD America 250 Act ·

Reported by committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

23 U.S.C. § 503 Research and technology development and deployment

+17 −19Shown
More for 23 U.S.C. § 503
Read § 503
16 changes the bill asks for here, 16 carried out
  1. Carried out:

    in paragraph (3)(D) by striking fiscal years 2022 through 2026 and inserting fiscal years 2027 through 2031;

  2. Carried out:

    in paragraph (3)(E) by striking 3 years and inserting 2 years;

  3. Carried out:

    in the heading by striking and innovative mobility;

  4. Carried out:

    in clause (iv) by striking protect the environment and;

  5. Carried out:

    by striking clause (xii);

  6. Carried out:

    in clause (x) by adding or at the end; and

  7. Carried out:

    in clause (xi) by striking ; or and inserting a period;

  8. Carried out:

    in clause (xv) by striking ; or and inserting a semicolon;

  9. Carried out:

    in clause (xvi) by striking the period and inserting ; or; and

  10. Carried out:

    by adding at the end the following:(xvii) cybersecurity protection measures and activities to protect against cybersecurity threats.;

  11. Carried out:

    in subparagraph (I)(i) by striking fiscal years 2022 through 2026 and inserting fiscal years 2027 through 2031; and

  12. Carried out:

    in subparagraph (K) by striking 20 percent and inserting 10 percent; and

  13. Carried out:

    in subparagraph (C) by striking fiscal years 2022 through 2026 and inserting fiscal years 2027 through 2031; and

  14. Carried out:

    in subclause (I) by striking and at the end;

  15. Carried out:

    in subclause (II) by striking the period and inserting ; and; and

  16. Carried out:

    by adding at the end the following:(III) any recommendations or best practices to encourage wider deployment and implementation of advanced digital management systems by States..

§ 503(c)(3)Accelerated implementation and deployment of pavement technologies.—(C)–(E)

Start of § 503 to (c)(3)(C)(iii)(III) unchanged ·

(IV) the American Association of State Highway and Transportation Officials.

(D) Funding.— The Secretary shall obligate for each of fiscal years [struck: 2022][inserted: 2027] through [struck: 2026][inserted: 2031] from funds made available to carry out this subsection $12,000,000 to accelerate the deployment and implementation of pavement technology.

(E) Publication.—

(i) In general.— Not less frequently than once every [struck: 3][inserted: 2] years, the Secretary shall issue and make available to the public on an Internet website a report on the cost and benefits from deployment of new technology and innovations that substantially and directly resulted from the program established under this paragraph.

(ii) Inclusions.— The report under clause (i) may include an analysis of—

(I) Federal, State, and local cost savings;

§ 503(c)Technology and Innovation Deployment Program.—(3)–(4)

(c)(3)(E)(ii)(II)–(VIII) unchanged ·

(IX) the energy efficiency of the production of paving materials and the ability of paving materials to enhance the environment and promote sustainability; and

(X) integration of renewable energy in pavement designs.

(4) Advanced transportation technologies [struck: and innovative mobility ]deployment.—

(A) In general.— The Secretary shall provide grants to eligible entities to deploy, install, and operate advanced transportation technologies to improve safety, mobility, efficiency, system performance, intermodal connectivity, and infrastructure return on investment.

(B) Criteria.— The Secretary shall develop criteria for selection of an eligible entity to receive a grant under this paragraph, including how the deployment of technology will—

§ 503(c)(4)(B)Criteria.—(iii)–(vi)

(c)(4)(B)(i)–(ii) unchanged ·

(iii) reduce costs and improve return on investments, including through optimization of existing transportation capacity;

(iv) [struck: protect the environment and ]deliver environmental benefits that alleviate congestion and streamline traffic flow;

(v) measure and improve the operational performance of the applicable transportation network;

(vi) reduce the number and severity of traffic crashes and increase driver, passenger, and pedestrian safety;

§ 503(c)(4)Advanced transportation technologies deployment.—(B)–(C)

(c)(4)(B)(vii)–(viii) unchanged ·

(ix) monitor transportation assets to improve infrastructure management, reduce maintenance costs, prioritize investment decisions, and ensure a state of good repair;

(x) deliver economic benefits by reducing delays, improving system performance, and providing for the efficient and reliable movement of goods and services;[inserted: or]

(xi) accelerate the deployment of vehicle-to-vehicle, vehicle-to-infrastructure, vehicle-to-pedestrian, autonomous vehicles, and other technologies[struck: ; or][inserted: .]

[struck: (xii)] [struck: incentivize travelers—]

[struck: (I)] [struck: to share trips during periods in which travel demand exceeds system capacity; or]

[struck: (II)] [struck: to shift trips to periods in which travel demand does not exceed system capacity.]

(C) Applications.—

(i) Request.— Each fiscal year for which funding is made available for activities under this paragraph, the Secretary shall request applications in accordance with clause (ii).

§ 503(c)(4)Advanced transportation technologies deployment.—(E)–(F)

(c)(4)(C)(ii)–(E)(xiii) unchanged ·

(xiv) advanced mobility, access, and on-demand transportation service technologies, such as dynamic ridesharing and other shared-use mobility applications and information systems to support human services for elderly and disabled individuals;

(xv) retrofitting dedicated short-range communications (DSRC) technology deployed as part of an existing pilot program to cellular vehicle-to-everything (C–V2X) technology, subject to the condition that the retrofitted technology operates only within the existing spectrum allocations for connected vehicle systems;[struck: or]

(xvi) advanced transportation technologies, in accordance with the research areas described in section 6503 of title 49[struck: .][inserted: ; or]

(xvii) [inserted: cybersecurity protection measures and activities to protect against cybersecurity threats.]

(F) Report to secretary.— For each eligible entity that receives a grant under this paragraph, not later than 1 year after the entity receives the grant, and each year thereafter, the entity shall submit a report to the Secretary that describes—

(i) deployment and operational costs of the project compared to the benefits and savings the project provides; and

§ 503(c)(4)Advanced transportation technologies deployment.—(H)–(M)

(c)(4)(F)(ii)–(H)(i) unchanged ·

(ii) the Secretary provides written notice 60 days prior to withholding funds to the Committees on Transportation and Infrastructure and Science, Space, and Technology of the House of Representatives and the Committees on Environment and Public Works and Commerce, Science, and Transportation of the Senate.

(I) Funding.—

(i) In general.— From funds made available to carry out subsection (b), this subsection, and sections 512 through 518, the Secretary shall set aside for grants awarded under subparagraph (D) $60,000,000 for each of fiscal years [struck: 2022][inserted: 2027] through [struck: 2026][inserted: 2031].

(ii) Expenses for the secretary.— Of the amounts set aside under clause (i), the Secretary may set aside $2,000,000 each fiscal year for program reporting, evaluation, and administrative costs related to this paragraph.

(J) Federal share.— The Federal share of the cost of a project for which a grant is awarded under this subsection shall not exceed 80 percent of the cost of the project.

(K) Grant limitation.— The Secretary may not award more than [struck: 20][inserted: 10] percent of the amount described under subparagraph (I) in a fiscal year to a single grant recipient.

(L) Expenses for grant recipients.— A grant recipient under this paragraph may use not more than 5 percent of the funds awarded each fiscal year to carry out planning and reporting requirements.

(M) Grant flexibility.—

§ 503(c)(5)Accelerated implementation and deployment of advanced digital construction management systems.—(B)–(D)

(c)(4)(M)(i)–(5)(B)(viii) unchanged ·

(ix) enhanced worker and pedestrian safety resulting from increased transparency.

(C) Funding.— For each of fiscal years [struck: 2022][inserted: 2027] through [struck: 2026][inserted: 2031], the Secretary shall obligate from funds made available to carry out this subsection $20,000,000 to accelerate the deployment and implementation of advanced digital construction management systems.

(D) Publication.—

(i) In general.— Not less frequently than annually, the Secretary shall issue and make available to the public on a website a report on—

(I) progress made in the implementation of advanced digital management systems by States;[struck: and]

(II) the costs and benefits of the deployment of new technology and innovations that substantially and directly resulted from the program established under this paragraph[struck: .][inserted: ; and]

(III) [inserted: any recommendations or best practices to encourage wider deployment and implementation of advanced digital management systems by States.]

(ii) Inclusions.— The report under clause (i) may include an analysis of—

(I) Federal, State, and local cost savings;

Rest of § 503 unchanged ·

Step through the changes