Title 49 · TransportationTransportation
Changes to 49 U.S.C. § 20157
H.R. 8870 · BUILD America 250 Act · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
Reported by committee · step 2 of 5
49 U.S.C. § 20157 Implementation of positive train control systems
2 changes the bill asks for here, 2 carried out
- Carried out:
in subsection (k) by striking
Act
and insertingsubsection
; and - Carried out:
in subsection (l) by striking
subject to (a)(1)
and insertingsubject to subsection (a)(1)
.
§ 20157(j)–(m)
Start of § 20157 to (j)(3) unchanged ·
(4) Notification.— During the period described in paragraph (1), if a positive train control system that has been certified and implemented fails to initialize, cuts out, or malfunctions, the affected railroad carrier or other entity shall submit a notification to the appropriate regional office of the Federal Railroad Administration within 7 days of the system failure, or under alternative location and deadline requirements set by the Secretary, and include in the notification a description of the safety measures the affected railroad carrier or other entity has in place.
(k) Small Railroads.— Not later than 120 days after the date of the enactment of this [struck: Act][inserted: subsection], the Secretary shall amend section 236.1006(b)(4)(iii)(B) of title 49, Code of Federal Regulations (relating to equipping locomotives for applicable Class II and Class III railroads operating in positive train control territory) to extend each deadline under such section by 3 years.
(l) Revenue Service Demonstration.— When a railroad carrier or other entity subject to [inserted: subsection ](a)(1) notifies the Secretary it is prepared to initiate revenue service demonstration, it shall also notify any applicable tenant railroad carrier or other entity subject to subsection (a)(1).
(m) Reports on Positive Train Control System Performance.—
(1) In general.— Each host railroad subject to this section or subpart I of part 236 of title 49, Code of Federal Regulations, shall electronically submit to the Secretary of Transportation a Report of PTC System Performance on Form FRA F 6180.152, which shall be submitted on or before the applicable due date set forth in paragraph (3) and contain the information described in paragraph (2), which shall be separated by the host railroad, each applicable tenant railroad, and each positive train control-governed track segment, consistent with the railroad’s positive train control Implementation Plan described in subsection (a)(1).
Rest of § 20157 unchanged ·