Skip to content
The People's CodeSearch
Menu

Title 49 · TransportationTransportation

Changes to 49 U.S.C. § 5309

H.R. 8870 · BUILD America 250 Act ·

Reported by committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

49 U.S.C. § 5309 Fixed guideway capital investment grants

+210 −8470 of 77 shown
More for 49 U.S.C. § 5309
Read § 5309
77 changes the bill asks for here, 70 carried out
  1. Carried out:

    in the matter preceding paragraph (1) by striking , the following definitions shall apply;

  2. Carried out:

    by striking paragraph (2) and inserting the following:(2) Core capacity improvement project.— The term “core capacity improvement project”— (A) (i) means a capital investment in an existing fixed guideway system that— (I) increases the capacity of a corridor by not less than 10 percent; or (II) substantially increases the capacity …

  3. Carried out:

    in paragraph (3) by striking small start and inserting streamlined start; and

  4. Carried out:

    in the paragraph heading by striking Small start and inserting Streamlined start;

  5. Carried out:

    in the matter preceding subparagraph (A) by striking small start and inserting streamlined start; and

  6. Carried out:

    by striking subparagraphs (A) and (B) and inserting the following:(A) the total estimated net capital cost is less than $1,000,000,000 (adjusted annually for inflation); and (B) Federal assistance provided or requested under this section is less than or equal to 50 percent of the dollar amount specified in subparagraph (A).;

  7. Carried out:

    in paragraph (1) by striking small start and inserting streamlined start; and

  8. Carried out:

    by striking paragraph (2) and inserting the following:(2) core capacity improvement projects, including— (A) acquisition of real property; (B) acquisition of rights-of-way; (C) double tracking; (D) signalization improvements; (E) electrification; (F) expanding system platforms; (G) acquisition of rolling stock associated with …

  9. Carried out:

    in the matter preceding subparagraph (A) by striking small start and inserting streamlined start; and

  10. Carried out:

    by striking the applicant and inserting if applicable, the applicant;

  11. Carried out:

    by striking the performance targets and inserting a performance target; and

  12. Carried out:

    by striking in section 5326(c)(2) and inserting described in section 5326(b)(2)(A); and

  13. Carried out:

    in paragraph (3) to read as follows:(3) Technical capacity.— The Secretary shall use an expedited technical capacity review process for a project if the applicant— (A) has— (i) during the 5-year period immediately preceding the date on which the applicant requests funds for the project— (I) successfully completed …

  14. Carried out:

    in clause (i)(II) by striking initiates and inserting has initiated; and

  15. Carried out:

    by redesignating subclauses (I) and (II) as subclauses (II) and (III), respectively; and

  16. Carried out:

    by inserting before subclause (II), as so redesignated, the following:(I) determines that the applicant has completed 30 percent of design and engineering for the project;;

  17. Carried out:

    in clause (i)(II) by striking initiates and inserting has initiated; and

  18. Carried out:

    by redesignating subclauses (I) and (II) as subclauses (II) and (III), respectively; and

  19. Carried out:

    by inserting before subclause (II), as so redesignated, the following:(I) determines that the applicant has completed 30 percent of design and engineering for the project;; and

  20. Carried out:

    by striking clause (iii);

  21. Carried out:

    by redesignating clauses (iv) and (v) as clauses (iii) and (iv), respectively; and

  22. Carried out:

    in clause (iii), as so redesignated, by striking needs of the corridor and all that follows through the semicolon and inserting needs of the system or corridor;;

  23. Carried out:

    in the matter preceding clause (i) by striking subparagraph (A)(iv) and inserting subparagraph (A)(iii); and

  24. Carried out:

    by striking clause (ii) and inserting the following:(ii) whether the project will increase capacity of a corridor by at least 10 percent or substantially increase capacity system-wide (in whole or in part), including in the manner described in subsection (a)(2)(A)(ii);;

  25. Carried out:

    in the matter preceding subparagraph (A) by striking or (e)(2)(A)(v) and inserting or (e)(2)(A)(iv); and

  26. Carried out:

    in subparagraph (C) by striking local resources and inserting the applicant demonstrate that local resources; and

  27. Carried out:

    in paragraph (2) by striking or (e)(2)(A)(v) and inserting or (e)(2)(A)(iv);

  28. Carried out:

    in subparagraph (A)(ii) by striking subsection (e)(2)(A)(iv) and inserting subsection (e)(2)(A)(iii);

  29. Carried out:

    in subparagraph (B) by striking or (e)(2)(A)(iv) each place it appears and inserting or (e)(2)(A)(iii) and

  30. Carried out:

    by adding at the end the following:(D) Eligibility for adjustment of certain criterion.— (i) In general.— In evaluating and rating the economic development criterion referenced in subsection (d)(2)(A)(iii) and (e)(2)(A)(iii), the Secretary may increase 1 point on the 5-point scale (high, medium-high, medium, …

  31. Carried out:

    by amending paragraph (5) to read as follows:(5) Policy guidance.— (A) In general.— The Secretary shall issue policy guidance regarding the review and evaluation process and criteria each time the Secretary makes significant changes to the process and criteria, but not less frequently than once every 2 years. (B) …

  32. Carried out:

    by striking Not later than 1 year and all that follows through shall issue and inserting The Secretary shall maintain; and

  33. Carried out:

    in subparagraph (B) by striking corridor and inserting corridor or system; and

  34. Carried out:

    in paragraph (8) by striking the date of enactment of the Federal Public Transportation Act of 2012 and inserting October 1, 2012;

  35. Carried out:

    in the subsection heading by striking Small start and inserting Streamlined start;

  36. Carried out:

    by striking small start in each place it occurs and inserting streamlined start;

  37. Not carried out:

    by striking small starts in each place it occurs and inserting streamlined start;

    “small starts” isn't in § 5309(h) in the Code as we have it. The law may have changed since the bill was drafted.

    Technical detail“small starts” not found in /us/usc/t49/s5309/h
  38. Carried out:

    in clause (i)(II) by striking initiates and inserting has initiated; and

  39. Carried out:

    by redesignating subclauses (I) and (II) as subclauses (II) and (III), respectively; and

  40. Carried out:

    by inserting before subclause (II), as so redesignated, the following:(I) determines that the applicant has completed 30 percent of design and engineering for the project;;

  41. Carried out:

    in paragraph (6) by adding at the end the following:(C) Eligibility for adjustment of certain criterion.— (i) In general.— In evaluating and rating the economic development criterion referenced in paragraph (4), the Secretary may increase 1 point on the 5-point scale (high, medium-high, medium, medium-low, or low) the rating for …

  42. Carried out:

    in paragraph (7)(C) by striking 10 days and inserting 3 business days;

  43. Carried out:

    in the subparagraph heading by striking Small start and inserting Streamlined start; and

  44. Carried out:

    by striking small start and inserting streamlined start; and

  45. Carried out:

    in subparagraph (C)(iii) by striking small start and inserting streamlined start;

  46. Carried out:

    in subsection (j) by striking the date of enactment of the Federal Public Transportation Act of 2012 and inserting October 1, 2012;

  47. Carried out:

    in subparagraph (E)(i) by striking Applicants and inserting Unless otherwise provided by subparagraph (G), applicants;

  48. Carried out:

    in subparagraph (F) by striking To be eligible and inserting Unless otherwise provided by subparagraph (G), to be eligible; and

  49. Carried out:

    by adding at the end the following new subparagraph:(G) Special rule.— An applicant seeking a full funding grant agreement under this paragraph for a project that has a local financial commitment of not less than 50 percent of the total net cost of the project may not be required by the Secretary to submit a plan described in …

  50. Carried out:

    in paragraph (5) by striking 15 days and inserting 3 business days;

  51. Carried out:

    in clause (iii) by striking in the corridor and inserting of the system or corridor; and

  52. Not carried out:

    in the clause heading by striking small start and streamlined start; and

    We can't read how this instruction is worded yet, so it isn't shown in the text.

    Technical detailno-pattern: striking QTEXT and QTEXT; and
  53. Carried out:

    by striking small start and inserting streamlined start; and

  54. Carried out:

    in paragraph (7) by striking the date of enactment of the Federal Public Transportation Act of 2012 and inserting October 1, 2012;

  55. Carried out:

    in subsection (m) by adding at the end the following new paragraph:(3) Pre-project development phase costs.— The Secretary shall pay the Government share of project costs incurred by a State or local governmental authority that carries out any part of a project described in this section without the aid of amounts of the Government and according …

  56. Carried out:

    by striking subparagraph (B);

  57. Carried out:

    by striking subparagraph (C) and inserting the following:(C) recommendations of such projects for funding— (i) based on the evaluations and ratings and on existing commitments and anticipated funding levels for the next 3 fiscal years based on information currently available to the Secretary; and (ii) prioritizing projects submitted under subsection (u); and;

  58. Not carried out:

    by redesignating subparagraph (C), as amended, as subparagraph (B); and

    We can't read how this instruction is worded yet, so it isn't shown in the text.

    Technical detailno-pattern: redesignating subparagraph (X), as amended, as subparagraph (X); and
  59. Carried out:

    by adding at the end the following new subparagraph:(C) a narrative summary for projects for which the Secretary adjusted the rating of the economic development criterion pursuant to subsection (g)(2)(D) or (h)(6)(C).;

    The section already has a provision under this letter or number, so it would have two.

  60. Carried out:

    in paragraph (2)(A)(i)(I) by striking and section 3005(b) of the Federal Public Transportation Act of 2015 (49 U.S.C. 5309 note; Public Law 114–94); and

  61. Carried out:

    by adding at the end the following new paragraph:(3) Evaluations and rating.— Concurrently with updates made pursuant to subsection (r)(2), the Secretary shall submit to Congress, and make available to the public, report evaluations and ratings, as required under subsections (d), (e), and (h), for each such project that— (A) …

  62. Carried out:

    in the subsection heading by striking rule and inserting rules regarding cost effectiveness;

  63. Carried out:

    by striking For the purposes and inserting (1) Treatment of certain capital costs.—For the purposes; and

  64. Carried out:

    by adding at the end the following new paragraph:(2) Alternative metric consideration.— In making a determination regarding the cost effectiveness of a project under subsection (d)(2)(A)(iii) or (e)(2)(A)(iii), the Secretary may consider, in addition to the measurement of cost per rider, upon request of the project sponsor, an …

  65. Carried out:

    by adding at the end the following:(s) Alternative project delivery.— (1) In general.— Notwithstanding contract requirements in section 5325, the Secretary may allow an applicant to enter into a covered project delivery contract with respect to a project for which the applicant requests funds under this section. …

  66. Carried out:

    in subparagraph (A) by striking 5303 and 5304 and inserting 5331 and 5332; and

  67. Carried out:

    in subparagraph (C) by striking 5326(b)(2)(A) and inserting 5354(b)(2)(A);

  68. Carried out:

    in subsection (d)(2)(A)(ii) by striking 5303 and inserting 5331;

  69. Carried out:

    in subsection (e)(2)(A)(ii) by striking 5303 and inserting 5331;

  70. Carried out:

    in subsection (g)(5)(C) by striking 5334(k) and inserting 5305(k);

  71. Carried out:

    in subsection (h)(3)(A) by striking 5303 and inserting 5331;

  72. Carried out:

    in subsection (i) by striking 5303(i) in each place it occurs and inserting 5331(i);

  73. Carried out:

    in subsection (s)(1) by striking 5325 and inserting 5306(z); and

  74. Not carried out:

    in clause (i) by striking 5303 and 5304 and inserting 5331 and 5332; and

    The bill points to subsection (u) of § 5309, which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.

    Technical detailtarget not found: no subsection (u) in /us/usc/t49/s5309
  75. Not carried out:

    in clause (iii) by striking 5306(a) and inserting 5306(y)(1); and

    The bill points to subsection (u) of § 5309, which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.

    Technical detailtarget not found: no subsection (u) in /us/usc/t49/s5309
  76. Not carried out:

    in subparagraph (B) by striking 5306(a) and inserting 5306(y)(1); and

    The bill points to subsection (u) of § 5309, which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.

    Technical detailtarget not found: no subsection (u) in /us/usc/t49/s5309
  77. Not carried out:

    in subparagraph (C) by striking 5303 and 5304 and inserting 5331 and 5332;

    The bill points to subsection (u) of § 5309, which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.

    Technical detailtarget not found: no subsection (u) in /us/usc/t49/s5309

This bill puts a provision under a letter or number this section already uses, so the section would have two. The law has probably changed since the bill was written.

§ 5309(a)

WhereMarkThe Code nowMarkAs the bill would leave it
§ 5309. Fixed guideway capital investment grants§ 5309. Fixed guideway capital investment grants
(a)(a) Definitions.—(a) Definitions.—
In this section[struck: , the following definitions shall apply]:In this section:
(a)(1)(1) Applicant.—(1) Applicant.—
The term “applicant” means a State or local governmental authority that applies for a grant under this section.The term “applicant” means a State or local governmental authority that applies for a grant under this section.
(a)(2)(2) Core capacity improvement project.—(2) Core capacity improvement project.—
[inserted: The term “core capacity improvement project”—]
(a)(2)(A)(A) [inserted: ]
(a)(2)(A)(i)(i) [inserted: ]
[inserted: means a capital investment in an existing fixed guideway system that—]
(a)(2)(A)(i)(I)(I) [inserted: ]
[inserted: increases the capacity of a corridor by not less than 10 percent; or]
(a)(2)(A)(i)(II)(II) [inserted: ]
[inserted: substantially increases the capacity of such system (in part or in whole); and]
(a)(2)(A)(ii)(ii) [inserted: ]
[inserted: includes a project that—]
(a)(2)(A)(ii)(I)(I) [inserted: ]
[inserted: is primarily intended to increase capacity by reducing passenger travel time in a corridor or in an existing fixed guideway system, including for passengers with disabilities and those who use wheelchairs; and]
(a)(2)(A)(ii)(II)(II) [inserted: ]
[inserted: otherwise meets the requirements of clause (i); and]
(a)(2)(B)(B) [inserted: ]
[inserted: does not include—]
(a)(2)(B)(i)(i) [inserted: ]
[inserted: elements designed to maintain a state of good repair of the existing fixed guideway system;]
(a)(2)(B)(ii)(ii) [inserted: ]
[inserted: elements to improve general station facilities (other than stairs, elevators, ramps, or escalators for passenger use) or parking; and]
(a)(2)(B)(iii)(iii) [inserted: ]
[inserted: acquisition of rolling stock alone.]
(a)(2)[struck: The term “core capacity improvement project” means a substantial corridor-based capital investment in an existing fixed guideway system that increases the capacity of a corridor by not less than 10 percent. The term does not include project elements designed to maintain a state of good repair of the existing fixed guideway system.]
(a)(3)(3) Corridor-based bus rapid transit project.—(3) Corridor-based bus rapid transit project.—
The term “corridor-based bus rapid transit project” means a [struck: small] start project utilizing buses in which the project represents a substantial investment in a defined corridor as demonstrated by features that emulate the services provided by rail fixed guideway public transportation systems, including defined stations; traffic signal priority for public transportation vehicles; short headway bidirectional services for a substantial part of weekdays; and any other features the Secretary may determine support a long-term corridor investment, but the majority of which does not operate in a separated right-of-way dedicated for public transportation use during peak periods.The term “corridor-based bus rapid transit project” means a [inserted: streamlined] start project utilizing buses in which the project represents a substantial investment in a defined corridor as demonstrated by features that emulate the services provided by rail fixed guideway public transportation systems, including defined stations; traffic signal priority for public transportation vehicles; short headway bidirectional services for a substantial part of weekdays; and any other features the Secretary may determine support a long-term corridor investment, but the majority of which does not operate in a separated right-of-way dedicated for public transportation use during peak periods.
(a)(4)(4) Fixed guideway bus rapid transit project.—(4) Fixed guideway bus rapid transit project.—
The term “fixed guideway bus rapid transit project” means a bus capital project—The term “fixed guideway bus rapid transit project” means a bus capital project—
(a)(4)(A)(A) (A)
in which the majority of the project operates in a separated right-of-way dedicated for public transportation use during peak periods;in which the majority of the project operates in a separated right-of-way dedicated for public transportation use during peak periods;

§ 5309(a)–(d)

(a)(4)(B)–(5) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(a)(5)(A)(A) (A)
a new fixed guideway project that is a minimum operable segment or extension to an existing fixed guideway system; ora new fixed guideway project that is a minimum operable segment or extension to an existing fixed guideway system; or
(a)(5)(B)(B) (B)
a fixed guideway bus rapid transit project that is a minimum operable segment or an extension to an existing bus rapid transit system.a fixed guideway bus rapid transit project that is a minimum operable segment or an extension to an existing bus rapid transit system.
(a)(6)(6) [struck: Small] start project.—(6) [inserted: Streamlined] start project.—
The term “[struck: small] start project” means a new fixed guideway capital project or corridor-based bus rapid transit project for which—The term “[inserted: streamlined] start project” means a new fixed guideway capital project or corridor-based bus rapid transit project for which—
(a)(6)(A)(A) (A)
the [struck: Federal] [struck: assistance] [struck: provided] [struck: or] [struck: to] [struck: be provided under this section ]is less than $[struck: 150],000,000; andthe [inserted: total] [inserted: estimated] [inserted: net] [inserted: capital] [inserted: cost] is less than $[inserted: 1],000,000[inserted: ,000 (adjusted annually for inflation)]; and
(a)(6)(B)(B) (B)
[struck: the] [struck: total] [struck: estimated] [struck: net] [struck: capital] [struck: cost] is less than [struck: $400,000,000].[inserted: Federal] [inserted: assistance] [inserted: provided] [inserted: or] [inserted: requested] [inserted: under] [inserted: this section ]is less than [inserted: or equal to 50 percent of the dollar amount specified in subparagraph (A)].
(b)(b) General Authority.—(b) General Authority.—
The Secretary may make grants under this section to State and local governmental authorities to assist in financing—The Secretary may make grants under this section to State and local governmental authorities to assist in financing—
(b)(1)(1) (1)
new fixed guideway capital projects or [struck: small] start projects, including the acquisition of real property, the initial acquisition of rolling stock for the system, the acquisition of rights-of-way, and relocation, for fixed guideway corridor development for projects in the advanced stages of project development or engineering; andnew fixed guideway capital projects or [inserted: streamlined] start projects, including the acquisition of real property, the initial acquisition of rolling stock for the system, the acquisition of rights-of-way, and relocation, for fixed guideway corridor development for projects in the advanced stages of project development or engineering; and
(b)(2)(2) (2)
[inserted: core capacity improvement projects, including—]
(b)(2)(A)(A) [inserted: ]
[inserted: acquisition of real property;]
(b)(2)(B)(B) [inserted: ]
[inserted: acquisition of rights-of-way;]
(b)(2)(C)(C) [inserted: ]
[inserted: double tracking;]
(b)(2)(D)(D) [inserted: ]
[inserted: signalization improvements;]
(b)(2)(E)(E) [inserted: ]
[inserted: electrification;]
(b)(2)(F)(F) [inserted: ]
[inserted: expanding system platforms;]
(b)(2)(G)(G) [inserted: ]
[inserted: acquisition of rolling stock associated with corridor or system-wide improvements increasing capacity;]
(b)(2)(H)(H) [inserted: ]
[inserted: construction of infill stations;]
(b)(2)(I)(I) [inserted: ]
[inserted: construction, renovation, and improvement of stairs, ramps, elevators, and escalators to improve accessibility of the system or corridor for individuals with disabilities, including individuals who use wheelchairs; and]
(b)(2)(J)(J) [inserted: ]
[inserted: other capacity improvements the Secretary determines are appropriate to increase the capacity of the system or corridor.]
(b)(2)[struck: core capacity improvement projects, including the acquisition of real property, the acquisition of rights-of-way, double tracking, signalization improvements, electrification, expanding system platforms, acquisition of rolling stock associated with corridor improvements increasing capacity, construction of infill stations, and such other capacity improvement projects as the Secretary determines are appropriate to increase the capacity of an existing fixed guideway system corridor by at least 10 percent. Core capacity improvement projects do not include elements to improve general station facilities or parking, or acquisition of rolling stock alone.]
(c)(c) Grant Requirements.—(c) Grant Requirements.—
(c)(1)(1) In general.—(1) In general.—
The Secretary may make a grant under this section for new fixed guideway capital projects, [struck: small] start projects, or core capacity improvement projects, if the Secretary determines that—The Secretary may make a grant under this section for new fixed guideway capital projects, [inserted: streamlined] start projects, or core capacity improvement projects, if the Secretary determines that—
(c)(1)(A)(A) (A)
the project is part of an approved transportation plan required under sections [struck: 5303] and [struck: 5304];the project is part of an approved transportation plan required under sections [inserted: 5331] and [inserted: 5332];
(c)(1)(B)(B) (B)
the applicant has, or will have—the applicant has, or will have—
(c)(1)(B)(i)(i) (i)
the legal, financial, and technical capacity to carry out the project, including the safety and security aspects of the project;the legal, financial, and technical capacity to carry out the project, including the safety and security aspects of the project;
(c)(1)(B)(ii)(ii) (ii)
satisfactory continuing control over the use of the equipment or facilities; andsatisfactory continuing control over the use of the equipment or facilities; and
(c)(1)(B)(iii)(iii) (iii)
the technical and financial capacity to maintain new and existing equipment and facilities; andthe technical and financial capacity to maintain new and existing equipment and facilities; and
(c)(1)(C)(C) (C)
the applicant has made progress toward meeting [struck: the] performance [struck: targets] in section [struck: 5326]([struck: c])(2).[inserted: if applicable, ]the applicant has made progress toward meeting [inserted: a] performance [inserted: target] [inserted: described ]in section [inserted: 5354]([inserted: b])(2)[inserted: (A)].
(c)(2)(2) Certification.—(2) Certification.—
An applicant that has submitted the certifications required under subparagraphs (A), (B), (C), and (H) of section 5307(c)(1) shall be deemed to have provided sufficient information upon which the Secretary may make the determinations required under this subsection.An applicant that has submitted the certifications required under subparagraphs (A), (B), (C), and (H) of section 5307(c)(1) shall be deemed to have provided sufficient information upon which the Secretary may make the determinations required under this subsection.
(c)(3)(3) Technical capacity.—(3) Technical capacity.—
The Secretary shall use an expedited technical capacity review process for [struck: applicants] [struck: that have recently and successfully completed at least 1 new fixed guideway capital ]project[struck: ,] [struck: or] [struck: core] [struck: capacity improvement project, if]—The Secretary shall use an expedited technical capacity review process for [inserted: a] project [inserted: if] [inserted: the] [inserted: applicant]—
(c)(3)(A)(A) (A)
[inserted: has—]
(c)(3)(A)(i)(i) [inserted: ]
[inserted: during the 5-year period immediately preceding the date on which the applicant requests funds for the project—]
(c)(3)(A)(i)(I)(I) [inserted: ]
[inserted: successfully completed at least 1 project pursuant to this section that is similar in complexity to the project for which the applicant is seeking an expedited review; and]
(c)(3)(A)(i)(II)(II) [inserted: ]
[inserted: demonstrates that the applicant continues to have the staff expertise and other resources necessary to implement a new project; or]
(c)(3)(A)(ii)(ii) [inserted: ]
[inserted: during the 3-year period immediately preceding the date on which the applicant requests funds for the project—]
(c)(3)(A)(ii)(I)(I) [inserted: ]
[inserted: successfully completed at least 1 project pursuant to this section; or]
(c)(3)(A)(ii)(II)(II) [inserted: ]
[inserted: fulfilled readiness requirements related to technical capacity for a comparable project sponsored by the applicant; and]
(c)(3)(A)[struck: the applicant achieved budget, cost, and ridership outcomes for the project that are consistent with or better than projections; and]
(c)(3)(B)(B) (B)
[struck: the] [struck: applicant] [struck: demonstrates] [struck: that] [struck: the] [struck: applicant] [struck: continues to have ]the [struck: staff] [struck: expertise] [struck: and] [struck: other] [struck: resources] [struck: necessary] to [struck: implement] [struck: a] [struck: new] [struck: project].[inserted: certifies,] [inserted: in] [inserted: a] [inserted: manner] [inserted: determined] [inserted: by] the [inserted: Secretary,] [inserted: that] [inserted: all] [inserted: project] [inserted: oversight] [inserted: requirements] [inserted: applicable ]to [inserted: the] [inserted: project] [inserted: will] [inserted: be fulfilled].
(c)(4)(4) Recipient requirements.—(4) Recipient requirements.—
A recipient of a grant awarded under this section shall be subject to all terms, conditions, requirements, and provisions that the Secretary determines to be necessary or appropriate for purposes of this section.A recipient of a grant awarded under this section shall be subject to all terms, conditions, requirements, and provisions that the Secretary determines to be necessary or appropriate for purposes of this section.
(d)(d) New Fixed Guideway Grants.—(d) New Fixed Guideway Grants.—

§ 5309(d)(1)Project development phase.—(A)–(C)

(d)(1) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(A)(i)(I)(I) (I)
submits a letter to the Secretary describing the project and requesting entry into the project development phase; andsubmits a letter to the Secretary describing the project and requesting entry into the project development phase; and
(A)(i)(II)(II) (II)
[struck: initiates] activities required to be carried out under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to the project; and[inserted: has] [inserted: initiated ]activities required to be carried out under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to the project; and
(A)(ii)(ii) (ii)
the Secretary—the Secretary—
(A)(ii)(I)(I) [inserted: ]
[inserted: determines that the applicant has completed 30 percent of design and engineering for the project;]
(A)(ii)(II)[struck: (I)] [inserted: (II)]
responds in writing to the applicant within 45 days whether the information provided is sufficient to enter into the project development phase, including, when necessary, a detailed description of any information deemed insufficient; andresponds in writing to the applicant within 45 days whether the information provided is sufficient to enter into the project development phase, including, when necessary, a detailed description of any information deemed insufficient; and
(A)(ii)(III)[struck: (II)] [inserted: (III)]
provides concurrent notice to the Committee on Banking, Housing, and Urban Affairs of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives of whether the new fixed guideway capital project is entering the project development phase.provides concurrent notice to the Committee on Banking, Housing, and Urban Affairs of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives of whether the new fixed guideway capital project is entering the project development phase.
(B)(B) Activities during project development phase.—(B) Activities during project development phase.—
Concurrent with the analysis required to be made under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), each applicant shall develop sufficient information to enable the Secretary to make findings of project justification and local financial commitment under this subsection.Concurrent with the analysis required to be made under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), each applicant shall develop sufficient information to enable the Secretary to make findings of project justification and local financial commitment under this subsection.
(C)(C) Completion of project development activities required.—(C) Completion of project development activities required.—

§ 5309(d)(2)(A)In general.—(i)–(iv)

(d)(1)(C)(i)–(2)(A) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(i)(i) (i)
is selected as the locally preferred alternative at the completion of the process required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);is selected as the locally preferred alternative at the completion of the process required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
(ii)(ii) (ii)
is adopted into the metropolitan transportation plan required under section [struck: 5303];is adopted into the metropolitan transportation plan required under section [inserted: 5331];
(iii)(iii) (iii)
is justified based on a comprehensive review of the project’s mobility improvements, the project’s environmental benefits, congestion relief associated with the project, economic development effects associated with the project, policies and land use patterns of the project that support public transportation, and the project’s cost-effectiveness as measured by cost per rider; andis justified based on a comprehensive review of the project’s mobility improvements, the project’s environmental benefits, congestion relief associated with the project, economic development effects associated with the project, policies and land use patterns of the project that support public transportation, and the project’s cost-effectiveness as measured by cost per rider; and
(iv)(iv) (iv)
is supported by an acceptable degree of local financial commitment (including evidence of stable and dependable financing sources), as required under subsection (f).is supported by an acceptable degree of local financial commitment (including evidence of stable and dependable financing sources), as required under subsection (f).

§ 5309(e)(1)Project development phase.—(A)–(C)

(d)(2)(B)–(e)(1)(A) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(A)(i)(I)(I) (I)
submits a letter to the Secretary describing the project and requesting entry into the project development phase; andsubmits a letter to the Secretary describing the project and requesting entry into the project development phase; and
(A)(i)(II)(II) (II)
[struck: initiates] activities required to be carried out under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to the project; and[inserted: has] [inserted: initiated ]activities required to be carried out under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to the project; and
(A)(ii)(ii) (ii)
the Secretary—the Secretary—
(A)(ii)(I)(I) [inserted: ]
[inserted: determines that the applicant has completed 30 percent of design and engineering for the project;]
(A)(ii)(II)[struck: (I)] [inserted: (II)]
responds in writing to the applicant within 45 days whether the information provided is sufficient to enter into the project development phase, including when necessary a detailed description of any information deemed insufficient; andresponds in writing to the applicant within 45 days whether the information provided is sufficient to enter into the project development phase, including when necessary a detailed description of any information deemed insufficient; and
(A)(ii)(III)[struck: (II)] [inserted: (III)]
provides concurrent notice to the Committee on Banking, Housing, and Urban Affairs of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives of whether the core capacity improvement project is entering the project development phase.provides concurrent notice to the Committee on Banking, Housing, and Urban Affairs of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives of whether the core capacity improvement project is entering the project development phase.
(B)(B) Activities during project development phase.—(B) Activities during project development phase.—
Concurrent with the analysis required to be made under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), each applicant shall develop sufficient information to enable the Secretary to make findings of project justification and local financial commitment under this subsection.Concurrent with the analysis required to be made under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), each applicant shall develop sufficient information to enable the Secretary to make findings of project justification and local financial commitment under this subsection.
(C)(C) Completion of project development activities required.—(C) Completion of project development activities required.—

§ 5309(e)–(f)

(e)(1)(C)(i)–(2)(A) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(e)(2)(A)(i)(i) (i)
is selected as the locally preferred alternative at the completion of the process required under the National Environmental Policy Act of 1969;is selected as the locally preferred alternative at the completion of the process required under the National Environmental Policy Act of 1969;
(e)(2)(A)(ii)(ii) (ii)
is adopted into the metropolitan transportation plan required under section [struck: 5303];is adopted into the metropolitan transportation plan required under section [inserted: 5331];
(e)(2)(A)(iii)(iii) [struck: ]
[struck: is in a corridor that is—]
(e)(2)(A)(iii)(I)(I) [struck: ]
[struck: at or over capacity; or]
(e)(2)(A)(iii)(II)(II) [struck: ]
[struck: projected to be at or over capacity within the next 10 years, without regard to any temporary measures employed by the applicant expected to increase short-term capacity within the next 10 years;]
(e)(2)(A)(iii)[struck: (iv)] [inserted: (iii)]
is justified based on a comprehensive review of the project’s mobility improvements, the project’s environmental benefits, congestion relief associated with the project, economic development effects associated with the project, the capacity needs of the [struck: corridor,] [struck: and] [struck: the project’s cost-effectiveness as measured by cost per rider]; andis justified based on a comprehensive review of the project’s mobility improvements, the project’s environmental benefits, congestion relief associated with the project, economic development effects associated with the project, the capacity needs of the [inserted: system] [inserted: or] [inserted: corridor]; and
(e)(2)(A)(iv)[struck: (v)] [inserted: (iv)]
is supported by an acceptable degree of local financial commitment (including evidence of stable and dependable financing sources), as required under subsection (f).is supported by an acceptable degree of local financial commitment (including evidence of stable and dependable financing sources), as required under subsection (f).
(e)(2)(B)(B) Determination that project is justified.—(B) Determination that project is justified.—
In making a determination under subparagraph (A)([struck: iv]), the Secretary shall evaluate, analyze, and consider—In making a determination under subparagraph (A)([inserted: iii]), the Secretary shall evaluate, analyze, and consider—
(e)(2)(B)(i)(i) (i)
the reliability of the forecasting methods used to estimate costs and utilization made by the recipient and the contractors to the recipient;the reliability of the forecasting methods used to estimate costs and utilization made by the recipient and the contractors to the recipient;
(e)(2)(B)(ii)(ii) (ii)
whether the project will increase capacity at least 10 percent in [struck: a] [struck: corridor];whether the project will increase capacity [inserted: of a corridor by ]at least 10 percent [inserted: or substantially increase capacity system-wide (]in [inserted: whole] [inserted: or in part), including in the manner described in subsection (a)(2)(A)(ii)];
(e)(2)(B)(iii)(iii) (iii)
whether the project will improve interconnectivity among existing systems; andwhether the project will improve interconnectivity among existing systems; and
(e)(2)(B)(iv)(iv) (iv)
whether the project will improve environmental outcomes.whether the project will improve environmental outcomes.
(f)(f) Financing Sources.—(f) Financing Sources.—
(f)(1)(1) Requirements.—(1) Requirements.—
In determining whether a project is supported by an acceptable degree of local financial commitment and shows evidence of stable and dependable financing sources for purposes of subsection (d)(2)(A)(v)[struck: ]or (e)(2)(A)([struck: v]), the Secretary shall require that—In determining whether a project is supported by an acceptable degree of local financial commitment and shows evidence of stable and dependable financing sources for purposes of subsection (d)(2)(A)(v)or (e)(2)(A)([inserted: iv]), the Secretary shall require that—
(f)(1)(A)(A) (A)
the proposed project plan provides for the availability of contingency amounts that the Secretary determines to be reasonable to cover unanticipated cost increases or funding shortfalls;the proposed project plan provides for the availability of contingency amounts that the Secretary determines to be reasonable to cover unanticipated cost increases or funding shortfalls;
(f)(1)(B)(B) (B)
each proposed local source of capital and operating financing is stable, reliable, and available within the proposed project timetable; andeach proposed local source of capital and operating financing is stable, reliable, and available within the proposed project timetable; and
(f)(1)(C)(C) (C)
local resources are available to recapitalize, maintain, and operate the overall existing and proposed public transportation system, including essential feeder bus and other services necessary to achieve the projected ridership levels without requiring a reduction in existing public transportation services or level of service to operate the project.[inserted: the applicant demonstrate that ]local resources are available to recapitalize, maintain, and operate the overall existing and proposed public transportation system, including essential feeder bus and other services necessary to achieve the projected ridership levels without requiring a reduction in existing public transportation services or level of service to operate the project.
(f)(2)(2) Considerations.—(2) Considerations.—
In assessing the stability, reliability, and availability of proposed sources of local financing for purposes of subsection (d)(2)(A)(v) or (e)(2)(A)([struck: v]), the Secretary shall consider—In assessing the stability, reliability, and availability of proposed sources of local financing for purposes of subsection (d)(2)(A)(v) or (e)(2)(A)([inserted: iv]), the Secretary shall consider—
(f)(2)(A)(A) (A)
the reliability of the forecasting methods used to estimate costs and revenues made by the recipient and the contractors to the recipient;the reliability of the forecasting methods used to estimate costs and revenues made by the recipient and the contractors to the recipient;
(f)(2)(B)(B) (B)
existing grant commitments;existing grant commitments;

§ 5309(g)Project Advancement and Ratings.—(2)–(3)

(f)(2)(C)–(g)(2)(A) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(2)(A)(i)(i) (i)
in the case of a new fixed guideway capital project, the project justification criteria under subsection (d)(2)(A)(iii), and the degree of local financial commitment; andin the case of a new fixed guideway capital project, the project justification criteria under subsection (d)(2)(A)(iii), and the degree of local financial commitment; and
(2)(A)(ii)(ii) (ii)
in the case of a core capacity improvement project, the capacity needs of the corridor, the project justification criteria under subsection (e)(2)(A)([struck: iv]), and the degree of local financial commitment.in the case of a core capacity improvement project, the capacity needs of the corridor, the project justification criteria under subsection (e)(2)(A)([inserted: iii]), and the degree of local financial commitment.
(2)(B)(B) Individual ratings for each criterion.—(B) Individual ratings for each criterion.—
In rating a project under this paragraph, the Secretary shall—In rating a project under this paragraph, the Secretary shall—
(2)(B)(i)(i) (i)
provide, in addition to the overall project rating under subparagraph (A), individual ratings for each of the criteria established under subsection (d)(2)(A)(iii) or (e)(2)(A)([struck: iv]), as applicable; andprovide, in addition to the overall project rating under subparagraph (A), individual ratings for each of the criteria established under subsection (d)(2)(A)(iii) or (e)(2)(A)([inserted: iii]), as applicable; and
(2)(B)(ii)(ii) (ii)
give comparable, but not necessarily equal, numerical weight to each of the criteria established under subsections (d)(2)(A)(iii) or (e)(2)(A)([struck: iv]), as applicable, in calculating the overall project rating under clause (i).give comparable, but not necessarily equal, numerical weight to each of the criteria established under subsections (d)(2)(A)(iii) or (e)(2)(A)([inserted: iii]), as applicable, in calculating the overall project rating under clause (i).
(2)(C)(C) Medium rating not required.—(C) Medium rating not required.—
The Secretary shall not require that any single project justification criterion meet or exceed a “medium” rating in order to advance the project from one phase to another.The Secretary shall not require that any single project justification criterion meet or exceed a “medium” rating in order to advance the project from one phase to another.
(2)(D)(D) [inserted: Eligibility for adjustment of certain criterion.—]
(2)(D)(i)(i) [inserted: In general.—]
[inserted: In evaluating and rating the economic development criterion referenced in subsection (d)(2)(A)(iii) and (e)(2)(A)(iii), the Secretary may increase 1 point on the 5-point scale (high, medium-high, medium, medium-low, or low) the rating for the economic development criterion if the applicant submits documented evidence that enacted local policies promote housing development for areas accessible to transit facilities along the project route.]
(2)(D)(ii)(ii) [inserted: Consideration; consultation.—]
[inserted: In carrying out clause (i), the Secretary shall—]
(2)(D)(ii)(I)(I) [inserted: ]
[inserted: consider whether the evidence submitted by the applicant will result in development appropriate to expected housing demand in the project area; and]
(2)(D)(ii)(II)(II) [inserted: ]
[inserted: consult with the Secretary of Housing and Urban Development.]
(3)(3) Warrants.—(3) Warrants.—
The Secretary shall, to the maximum extent practicable, develop and use special warrants for making a project justification determination under subsection (d)(2) or (e)(2), as applicable, for a project proposed to be funded using a grant under this section, if—The Secretary shall, to the maximum extent practicable, develop and use special warrants for making a project justification determination under subsection (d)(2) or (e)(2), as applicable, for a project proposed to be funded using a grant under this section, if—
(3)(A)(A) (A)
the share of the cost of the project to be provided under this section does not exceed 50 percent of the total cost of the project;the share of the cost of the project to be provided under this section does not exceed 50 percent of the total cost of the project;

§ 5309(g)–(i)

(g)(3)(B)–(D) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(g)(4)(4) Letters of intent and early systems work agreements.—(4) Letters of intent and early systems work agreements.—
In order to expedite a project under this subsection, the Secretary shall, to the maximum extent practicable, issue letters of intent and enter into early systems work agreements upon issuance of a record of decision for projects that receive an overall project rating of medium or better.In order to expedite a project under this subsection, the Secretary shall, to the maximum extent practicable, issue letters of intent and enter into early systems work agreements upon issuance of a record of decision for projects that receive an overall project rating of medium or better.
(g)(5)(5) Policy guidance.—(5) Policy guidance.—
[struck: The Secretary shall issue policy guidance regarding the review and evaluation process and criteria—]
(g)(5)(A)(A) (A) [inserted: In general.—]
[struck: not] [struck: later] [struck: than] [struck: 180] [struck: days] [struck: after] the [struck: date] [struck: of] [struck: enactment] [struck: of] the [struck: Federal] [struck: Public] [struck: Transportation] [struck: Act] [struck: of] [struck: 2012;] and[inserted: The] [inserted: Secretary] [inserted: shall] [inserted: issue] [inserted: policy] [inserted: guidance] [inserted: regarding ]the [inserted: review] [inserted: and] [inserted: evaluation] [inserted: process] [inserted: and criteria each time ]the [inserted: Secretary] [inserted: makes] [inserted: significant] [inserted: changes] [inserted: to] [inserted: the] [inserted: process ]and[inserted: criteria, but not less frequently than once every 2 years.]
(g)(5)(B)(B) (B) [inserted: Requirement.—]
[inserted: In carrying out subparagraph (A), the Secretary shall—]
(g)(5)(B)(i)(i) [inserted: ]
[inserted: ensure that the policy guidance for streamlined start projects is reflective of any differences in project scope, cost, risk, and source of local financial commitment compared to projects under subsections (d) and (e); and]
(g)(5)(B)(ii)(ii) [inserted: ]
[inserted: for core capacity improvement projects that propose to increase capacity in the manner described in subsection (a)(2)(A)(ii), issue specific policy guidance for evaluating how such projects may increase the capacity of the system or corridor.]
(g)(5)(C)(C) [inserted: Nonsubstantive policy updates.—]
[inserted: Notwithstanding the requirements of section 5305(k), the Secretary may issue or publish an update to the policy guidance described in subparagraph (A) provided that such update does not—]
(g)(5)(C)(i)(i) [inserted: ]
[inserted: impose a binding obligation on an applicant under this section; or]
(g)(5)(C)(ii)(ii) [inserted: ]
[inserted: significantly change the administration of the existing policy.]
(g)(5)(B)[struck: each time the Secretary makes significant changes to the process and criteria, but not less frequently than once every 2 years.]
(g)(6)(6) Rules.—(6) Rules.—
[struck: Not] [struck: later than 1 year after the date of enactment of the Federal Public Transportation Act of 2012, the ]Secretary shall [struck: issue] rules establishing an evaluation and rating process for—[inserted: The] Secretary shall [inserted: maintain] rules establishing an evaluation and rating process for—
(g)(6)(A)(A) (A)
new fixed guideway capital projects that is based on the results of project justification, policies and land use patterns that promote public transportation, and local financial commitment, as required under this subsection; andnew fixed guideway capital projects that is based on the results of project justification, policies and land use patterns that promote public transportation, and local financial commitment, as required under this subsection; and
(g)(6)(B)(B) (B)
core capacity improvement projects that is based on the results of the capacity needs of the corridor, project justification, and local financial commitment.core capacity improvement projects that is based on the results of the capacity needs of the corridor[inserted: or system], project justification, and local financial commitment.
(g)(7)(7) Project re-entry.—(7) Project re-entry.—
In carrying out ratings and evaluations under this subsection, the Secretary shall provide full and fair consideration to projects that seek an updated rating after a period of inactivity following an earlier rating and evaluation.In carrying out ratings and evaluations under this subsection, the Secretary shall provide full and fair consideration to projects that seek an updated rating after a period of inactivity following an earlier rating and evaluation.
(g)(8)(8) Applicability.—(8) Applicability.—
This subsection shall not apply to a project for which the Secretary issued a letter of intent, entered into a full funding grant agreement, or entered into a project construction agreement before [struck: the] [struck: date] [struck: of enactment of the Federal Public Transportation Act of ]2012.This subsection shall not apply to a project for which the Secretary issued a letter of intent, entered into a full funding grant agreement, or entered into a project construction agreement before [inserted: October] [inserted: 1,] 2012.
(h)(h) [struck: Small] [struck: Start] Projects.—(h) [inserted: Streamlined] [inserted: start] Projects.—
(h)(1)(1) In general.—(1) In general.—
A [struck: small] start project shall be subject to the requirements of this subsection.A [inserted: streamlined] start project shall be subject to the requirements of this subsection.
(h)(2)(2) Project development phase.—(2) Project development phase.—
(h)(2)(A)(A) Entrance into project development phase.—(A) Entrance into project development phase.—
A new [struck: small] starts project shall enter into the project development phase when—A new [inserted: streamlined] starts project shall enter into the project development phase when—
(h)(2)(A)(i)(i) (i)
the applicant—the applicant—
(h)(2)(A)(i)(I)(I) (I)
submits a letter to the Secretary describing the project and requesting entry into the project development phase; andsubmits a letter to the Secretary describing the project and requesting entry into the project development phase; and
(h)(2)(A)(i)(II)(II) (II)
[struck: initiates] activities required to be carried out under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to the project; and[inserted: has] [inserted: initiated ]activities required to be carried out under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to the project; and
(h)(2)(A)(ii)(ii) (ii)
the Secretary—the Secretary—
(h)(2)(A)(ii)(I)(I) [inserted: ]
[inserted: determines that the applicant has completed 30 percent of design and engineering for the project;]
(h)(2)(A)(ii)(II)[struck: (I)] [inserted: (II)]
responds in writing to the applicant within 45 days whether the information provided is sufficient to enter into the project development phase, including, when necessary, a detailed description of any information deemed insufficient; andresponds in writing to the applicant within 45 days whether the information provided is sufficient to enter into the project development phase, including, when necessary, a detailed description of any information deemed insufficient; and
(h)(2)(A)(ii)(III)[struck: (II)] [inserted: (III)]
provides concurrent notice to the Committee on Banking, Housing, and Urban Affairs of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives of whether the [struck: small] starts project is entering the project development phase.provides concurrent notice to the Committee on Banking, Housing, and Urban Affairs of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives of whether the [inserted: streamlined] starts project is entering the project development phase.
(h)(2)(B)(B) Activities during project development phase.—(B) Activities during project development phase.—
Concurrent with the analysis required to be made under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), each applicant shall develop sufficient information to enable the Secretary to make findings of project justification, policies and land use patterns that promote public transportation, and local financial commitment under this subsection.Concurrent with the analysis required to be made under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), each applicant shall develop sufficient information to enable the Secretary to make findings of project justification, policies and land use patterns that promote public transportation, and local financial commitment under this subsection.
(h)(3)(3) Selection criteria.—(3) Selection criteria.—
The Secretary may provide Federal assistance for a [struck: small] start project under this subsection only if the Secretary determines that the project—The Secretary may provide Federal assistance for a [inserted: streamlined] start project under this subsection only if the Secretary determines that the project—
(h)(3)(A)(A) (A)
has been adopted as the locally preferred alternative as part of the metropolitan transportation plan required under section [struck: 5303];has been adopted as the locally preferred alternative as part of the metropolitan transportation plan required under section [inserted: 5331];
(h)(3)(B)(B) (B)
is based on the results of an analysis of the benefits of the project as set forth in paragraph (4); andis based on the results of an analysis of the benefits of the project as set forth in paragraph (4); and
(h)(3)(C)(C) (C)
is supported by an acceptable degree of local financial commitment.is supported by an acceptable degree of local financial commitment.
(h)(4)(4) Evaluation of benefits and federal investment.—(4) Evaluation of benefits and federal investment.—
In making a determination for a [struck: small] start project under paragraph (3)(B), the Secretary shall analyze, evaluate, and consider the following evaluation criteria for the project (as compared to a no-action alternative): mobility improvements, environmental benefits, congestion relief, economic development effects associated with the project, policies and land use patterns that support public transportation and cost-effectiveness as measured by cost per rider.In making a determination for a [inserted: streamlined] start project under paragraph (3)(B), the Secretary shall analyze, evaluate, and consider the following evaluation criteria for the project (as compared to a no-action alternative): mobility improvements, environmental benefits, congestion relief, economic development effects associated with the project, policies and land use patterns that support public transportation and cost-effectiveness as measured by cost per rider.
(h)(5)(5) Evaluation of local financial commitment.—(5) Evaluation of local financial commitment.—
For purposes of paragraph (3)(C), the Secretary shall require that each proposed local source of capital and operating financing is stable, reliable, and available within the proposed project timetable.For purposes of paragraph (3)(C), the Secretary shall require that each proposed local source of capital and operating financing is stable, reliable, and available within the proposed project timetable.
(h)(6)(6) Ratings.—(6) Ratings.—
(h)(6)(A)(A) In general.—(A) In general.—
In carrying out paragraphs (4) and (5) for a [struck: small] start project, the Secretary shall evaluate and rate the project on a 5-point scale (high, medium-high, medium, medium-low, or low) based on an evaluation of the benefits of the project as compared to the Federal assistance to be provided and the degree of local financial commitment, as required under this subsection. In rating the projects, the Secretary shall provide, in addition to the overall project rating, individual ratings for each of the criteria established by this subsection and shall give comparable, but not necessarily equal, numerical weight to the benefits that the project will bring to the community in calculating the overall project rating.In carrying out paragraphs (4) and (5) for a [inserted: streamlined] start project, the Secretary shall evaluate and rate the project on a 5-point scale (high, medium-high, medium, medium-low, or low) based on an evaluation of the benefits of the project as compared to the Federal assistance to be provided and the degree of local financial commitment, as required under this subsection. In rating the projects, the Secretary shall provide, in addition to the overall project rating, individual ratings for each of the criteria established by this subsection and shall give comparable, but not necessarily equal, numerical weight to the benefits that the project will bring to the community in calculating the overall project rating.
(h)(6)(B)(B) Optional early rating.—(B) Optional early rating.—
At the request of the project sponsor, the Secretary shall evaluate and rate the project in accordance with paragraphs (4) and (5) and subparagraph (A) of this paragraph upon completion of the analysis required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).At the request of the project sponsor, the Secretary shall evaluate and rate the project in accordance with paragraphs (4) and (5) and subparagraph (A) of this paragraph upon completion of the analysis required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
(h)(6)(C)(C) [inserted: Eligibility for adjustment of certain criterion.—]
(h)(6)(C)(i)(i) [inserted: In general.—]
[inserted: In evaluating and rating the economic development criterion referenced in paragraph (4), the Secretary may increase 1 point on the 5-point scale (high, medium-high, medium, medium-low, or low) the rating for the economic development criterion if the applicant submits documented evidence that enacted local policies promote housing development for areas accessible to transit facilities along the project route.]
(h)(6)(C)(ii)(ii) [inserted: Consideration; consultation.—]
[inserted: In carrying out clause (i), the Secretary shall—]
(h)(6)(C)(ii)(I)(I) [inserted: ]
[inserted: consider whether the evidence submitted by the applicant will result in development appropriate to expected housing demand in the project area; and]
(h)(6)(C)(ii)(II)(II) [inserted: ]
[inserted: consult with the Secretary of Housing and Urban Development.]
(h)(7)(7) Grants and expedited grant agreements.—(7) Grants and expedited grant agreements.—
(h)(7)(A)(A) In general.—(A) In general.—
The Secretary, to the maximum extent practicable, shall provide Federal assistance under this subsection in a single grant. If the Secretary cannot provide such a single grant, the Secretary may execute an expedited grant agreement in order to include a commitment on the part of the Secretary to provide funding for the project in future fiscal years.The Secretary, to the maximum extent practicable, shall provide Federal assistance under this subsection in a single grant. If the Secretary cannot provide such a single grant, the Secretary may execute an expedited grant agreement in order to include a commitment on the part of the Secretary to provide funding for the project in future fiscal years.
(h)(7)(B)(B) Terms of expedited grant agreements.—(B) Terms of expedited grant agreements.—
In executing an expedited grant agreement under this subsection, the Secretary may include in the agreement terms similar to those established under subsection (k)(2).In executing an expedited grant agreement under this subsection, the Secretary may include in the agreement terms similar to those established under subsection (k)(2).
(h)(7)(C)(C) Notice of proposed grants and expedited grant agreements.—(C) Notice of proposed grants and expedited grant agreements.—
At least [struck: 10] days before making a grant award or entering into a grant agreement for a project under this subsection, the Secretary shall notify, in writing, the Committee on Transportation and Infrastructure and the Committee on Appropriations of the House of Representatives and the Committee on Banking, Housing, and Urban Affairs and the Committee on Appropriations of the Senate of the proposed grant or expedited grant agreement, as well as the evaluations and ratings for the project.At least [inserted: 3] [inserted: business ]days before making a grant award or entering into a grant agreement for a project under this subsection, the Secretary shall notify, in writing, the Committee on Transportation and Infrastructure and the Committee on Appropriations of the House of Representatives and the Committee on Banking, Housing, and Urban Affairs and the Committee on Appropriations of the Senate of the proposed grant or expedited grant agreement, as well as the evaluations and ratings for the project.
(i)(i) Programs of Interrelated Projects.—(i) Programs of Interrelated Projects.—
(i)(1)(1) Future bundling.—(1) Future bundling.—
(i)(1)(A)(A) Definition.—(A) Definition.—
In this paragraph, the term “future bundling request” means a letter described in subparagraph (B) that requests future funding for additional projects.In this paragraph, the term “future bundling request” means a letter described in subparagraph (B) that requests future funding for additional projects.
(i)(1)(B)(B) Request.—(B) Request.—
When an applicant submits a letter to the Secretary requesting entry of a project into the project development phase under subsection (d)(1)(A)(i)(I), (e)(1)(A)(i)(I), or (h)(2)(A)(i)(I), the applicant may include a description of other projects for consideration for future funding under this section. An applicant shall include in the request the amount of funding requested under this section for each additional project and the estimated capital cost of each project.When an applicant submits a letter to the Secretary requesting entry of a project into the project development phase under subsection (d)(1)(A)(i)(I), (e)(1)(A)(i)(I), or (h)(2)(A)(i)(I), the applicant may include a description of other projects for consideration for future funding under this section. An applicant shall include in the request the amount of funding requested under this section for each additional project and the estimated capital cost of each project.
(i)(1)(C)(C) Readiness.—(C) Readiness.—
Other projects included in the request shall be ready to enter the project development phase under subsection (d)(1)(A), (e)(1)(A), or (h)(2)(A), within 5 years of the initial project submitted as part of the request.Other projects included in the request shall be ready to enter the project development phase under subsection (d)(1)(A), (e)(1)(A), or (h)(2)(A), within 5 years of the initial project submitted as part of the request.
(i)(1)(D)(D) Planning.—(D) Planning.—
Projects in the future bundling request shall be included in the metropolitan transportation plan in accordance with section [struck: 5303](i).Projects in the future bundling request shall be included in the metropolitan transportation plan in accordance with section [inserted: 5331](i).
(i)(1)(E)(E) Project sponsor.—(E) Project sponsor.—
The applicant that submits a future bundling request shall be the project sponsor for each project included in the request.The applicant that submits a future bundling request shall be the project sponsor for each project included in the request.
(i)(1)(F)(F) Program and project share.—(F) Program and project share.—
A future bundling request submitted under this paragraph shall include a proposed share of each of the request’s projects that is consistent with the requirements of subsections (k)(2)(C)(ii) or (h)(7), as applicable.A future bundling request submitted under this paragraph shall include a proposed share of each of the request’s projects that is consistent with the requirements of subsections (k)(2)(C)(ii) or (h)(7), as applicable.

§ 5309(i)(2)Immediate bundling.—(C)–(F)

(i)(1)(G)–(2)(B) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(C)(C) Readiness.—(C) Readiness.—
Projects included in the request must be ready to enter the project development phase under subsection (d)(1)(A), (e)(1)(A), or (h)(2)(A) at the same time.Projects included in the request must be ready to enter the project development phase under subsection (d)(1)(A), (e)(1)(A), or (h)(2)(A) at the same time.
(D)(D) Planning.—(D) Planning.—
Projects in the bundle shall be included in the metropolitan transportation plan in accordance with section [struck: 5303](i).Projects in the bundle shall be included in the metropolitan transportation plan in accordance with section [inserted: 5331](i).
(E)(E) Project sponsor.—(E) Project sponsor.—
The applicant that submits an immediate bundling request shall be the project sponsor for each project included in the request.The applicant that submits an immediate bundling request shall be the project sponsor for each project included in the request.
(F)(F) Program and project share.—(F) Program and project share.—
An immediate bundling request submitted under this subsection shall include a proposed share of each of the request’s projects that is consistent with the requirements of subsections (k)(2)(C)(ii) or (h)(7), as applicable.An immediate bundling request submitted under this subsection shall include a proposed share of each of the request’s projects that is consistent with the requirements of subsections (k)(2)(C)(ii) or (h)(7), as applicable.

§ 5309(i)–(k)

(i)(2)(G)–(3) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(i)(4)(4) Grant agreements.—(4) Grant agreements.—
(i)(4)(A)(A) New start and core capacity improvement projects.—(A) New start and core capacity improvement projects.—
A new start project or core capacity improvement project in an immediate bundling request or future bundling request shall be carried out through a full funding grant agreement or expedited grant agreement pursuant to subsection (k)(2).A new start project or core capacity improvement project in an immediate bundling request or future bundling request shall be carried out through a full funding grant agreement or expedited grant agreement pursuant to subsection (k)(2).
(i)(4)(B)(B) [struck: Small] start.—(B) [inserted: Streamlined] start.—
A [struck: small] start project shall be carried out through a grant agreement pursuant to subsection (h)(7).A [inserted: streamlined] start project shall be carried out through a grant agreement pursuant to subsection (h)(7).
(i)(4)(C)(C) Requirement.—(C) Requirement.—
A combined grant agreement described in paragraph (2)(I)(i) shall—A combined grant agreement described in paragraph (2)(I)(i) shall—
(i)(4)(C)(i)(i) (i)
include only projects in an immediate future bundling request that are ready to receive a grant agreement under this section,include only projects in an immediate future bundling request that are ready to receive a grant agreement under this section,
(i)(4)(C)(ii)(ii) (ii)
be carried out through a full funding grant agreement or expedited grant agreement pursuant to subsection (k)(2) for the included projects, if a project seeking assistance under the combined grant agreement is a new start project or core capacity improvement project; andbe carried out through a full funding grant agreement or expedited grant agreement pursuant to subsection (k)(2) for the included projects, if a project seeking assistance under the combined grant agreement is a new start project or core capacity improvement project; and
(i)(4)(C)(iii)(iii) (iii)
be carried out through a grant agreement pursuant to subsection (h)(7) for the included projects, if the projects seeking assistance under the combined grant agreement consist entirely of [struck: small] start projects.be carried out through a grant agreement pursuant to subsection (h)(7) for the included projects, if the projects seeking assistance under the combined grant agreement consist entirely of [inserted: streamlined] start projects.
(i)(4)(D)(D) Savings provision.—(D) Savings provision.—
The use of a combined grant agreement shall not waive or amend applicable evaluation criteria under this section for projects included in the combined grant agreement.The use of a combined grant agreement shall not waive or amend applicable evaluation criteria under this section for projects included in the combined grant agreement.
(j)(j) Previously Issued Letter of Intent or Full Funding Grant Agreement.—(j) Previously Issued Letter of Intent or Full Funding Grant Agreement.—
Subsections (d) and (e) shall not apply to projects for which the Secretary has issued a letter of intent, approved entry into final design, entered into a full funding grant agreement, or entered into a project construction grant agreement before [struck: the] [struck: date] [struck: of enactment of the Federal Public Transportation Act of ]2012.Subsections (d) and (e) shall not apply to projects for which the Secretary has issued a letter of intent, approved entry into final design, entered into a full funding grant agreement, or entered into a project construction grant agreement before [inserted: October] [inserted: 1,] 2012.
(k)(k) Letters of Intent, Full Funding Grant Agreements, and Early Systems Work Agreements.—(k) Letters of Intent, Full Funding Grant Agreements, and Early Systems Work Agreements.—
(k)(1)(1) Letters of intent.—(1) Letters of intent.—
(k)(1)(A)(A) Amounts intended to be obligated.—(A) Amounts intended to be obligated.—
The Secretary may issue a letter of intent to an applicant announcing an intention to obligate, for a new fixed guideway capital project or core capacity improvement project, an amount from future available budget authority specified in law that is not more than the amount stipulated as the financial participation of the Secretary in the project. When a letter is issued for a capital project under this section, the amount shall be sufficient to complete at least an operable segment.The Secretary may issue a letter of intent to an applicant announcing an intention to obligate, for a new fixed guideway capital project or core capacity improvement project, an amount from future available budget authority specified in law that is not more than the amount stipulated as the financial participation of the Secretary in the project. When a letter is issued for a capital project under this section, the amount shall be sufficient to complete at least an operable segment.

§ 5309(k)(2)Full funding grant agreements.—(D)–(E)

(k)(1)(B)–(2)(D) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(D)(iv)(iv) Completion of operable segment.—(iv) Completion of operable segment.—
The amount stipulated in an agreement under this paragraph for a new fixed guideway capital project shall be sufficient to complete at least an operable segment.The amount stipulated in an agreement under this paragraph for a new fixed guideway capital project shall be sufficient to complete at least an operable segment.
(E)(E) Information collection and analysis plan.—(E) Information collection and analysis plan.—
(E)(i)(i) Submission of plan.—(i) Submission of plan.—
[struck: Applicants] seeking a full funding grant agreement under this paragraph shall submit a complete plan for the collection and analysis of information to identify the impacts of the new fixed guideway capital project or core capacity improvement project and the accuracy of the forecasts prepared during the development of the project. Preparation of this plan shall be included in the full funding grant agreement as an eligible activity.[inserted: Unless] [inserted: otherwise provided by subparagraph (G), applicants ]seeking a full funding grant agreement under this paragraph shall submit a complete plan for the collection and analysis of information to identify the impacts of the new fixed guideway capital project or core capacity improvement project and the accuracy of the forecasts prepared during the development of the project. Preparation of this plan shall be included in the full funding grant agreement as an eligible activity.
(E)(ii)(ii) Contents of plan.—(ii) Contents of plan.—
The plan submitted under clause (i) shall provide for—The plan submitted under clause (i) shall provide for—
(E)(ii)(I)(I) (I)
collection of data on the current public transportation system regarding public transportation service levels and ridership patterns, including origins and destinations, access modes, trip purposes, and rider characteristics;collection of data on the current public transportation system regarding public transportation service levels and ridership patterns, including origins and destinations, access modes, trip purposes, and rider characteristics;

§ 5309(k)Letters of Intent, Full Funding Grant Agreements, and Early Systems Work Agreements.—(2)–(3)

(k)(2)(E)(ii)(II)–(III) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(2)(E)(ii)(IV)(IV) (IV)
analysis of the consistency of predicted project characteristics with actual outcomes.analysis of the consistency of predicted project characteristics with actual outcomes.
(2)(F)(F) Collection of data on current system.—(F) Collection of data on current system.—
[struck: To] be eligible for a full funding grant agreement under this paragraph, recipients shall have collected data on the current system, according to the plan required under subparagraph (E)(ii), before the beginning of construction of the proposed new fixed guideway capital project or core capacity improvement project. Collection of this data shall be included in the full funding grant agreement as an eligible activity.[inserted: Unless] [inserted: otherwise provided by subparagraph (G), to ]be eligible for a full funding grant agreement under this paragraph, recipients shall have collected data on the current system, according to the plan required under subparagraph (E)(ii), before the beginning of construction of the proposed new fixed guideway capital project or core capacity improvement project. Collection of this data shall be included in the full funding grant agreement as an eligible activity.
(2)(G)(G) [inserted: Special rule.—]
[inserted: An applicant seeking a full funding grant agreement under this paragraph for a project that has a local financial commitment of not less than 50 percent of the total net cost of the project may not be required by the Secretary to submit a plan described in subparagraph (E) or to collect data on the current system described in subparagraph (F).]
(3)(3) Early systems work agreements.—(3) Early systems work agreements.—
(3)(A)(A) Conditions.—(A) Conditions.—
The Secretary may enter into an early systems work agreement with an applicant if a record of decision under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) has been issued on the project and the Secretary finds there is reason to believe—The Secretary may enter into an early systems work agreement with an applicant if a record of decision under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) has been issued on the project and the Secretary finds there is reason to believe—

§ 5309(k)–(l)

(k)(3)(A)(i)–(4)(A) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(k)(4)(B)(B) Appropriation required.—(B) Appropriation required.—
An obligation may be made under this subsection only when amounts are appropriated for the obligation.An obligation may be made under this subsection only when amounts are appropriated for the obligation.
(k)(5)(5) Notification to congress.—(5) Notification to congress.—
Not later than [struck: 15] days before issuing a letter of intent, entering into a full funding grant agreement, or entering into an early systems work agreement under this section, the Secretary shall notify, in writing, the Committee on Banking, Housing, and Urban Affairs and the Committee on Appropriations of the Senate and the Committee on Transportation and Infrastructure and the Committee on Appropriations of the House of Representatives of the proposed letter or agreement. The Secretary shall include with the notification a copy of the proposed letter or agreement as well as the evaluations and ratings for the project.Not later than [inserted: 3] [inserted: business ]days before issuing a letter of intent, entering into a full funding grant agreement, or entering into an early systems work agreement under this section, the Secretary shall notify, in writing, the Committee on Banking, Housing, and Urban Affairs and the Committee on Appropriations of the Senate and the Committee on Transportation and Infrastructure and the Committee on Appropriations of the House of Representatives of the proposed letter or agreement. The Secretary shall include with the notification a copy of the proposed letter or agreement as well as the evaluations and ratings for the project.
(l)(l) Government Share of Net Capital Project Cost.—(l) Government Share of Net Capital Project Cost.—
(l)(1)(1) In general.—(1) In general.—
(l)(1)(A)(A) Estimation of net capital project cost.—(A) Estimation of net capital project cost.—
Based on engineering studies, studies of economic feasibility, and information on the expected use of equipment or facilities, the Secretary shall estimate the net capital project cost.Based on engineering studies, studies of economic feasibility, and information on the expected use of equipment or facilities, the Secretary shall estimate the net capital project cost.
(l)(1)(B)(B) Grants.—(B) Grants.—
(l)(1)(B)(i)(i) Grant for new fixed guideway capital project.—(i) Grant for new fixed guideway capital project.—
A grant for a new fixed guideway capital project shall not exceed 80 percent of the net capital project cost.A grant for a new fixed guideway capital project shall not exceed 80 percent of the net capital project cost.
(l)(1)(B)(ii)(ii) Full funding grant agreement for new fixed guideway capital project.—(ii) Full funding grant agreement for new fixed guideway capital project.—
A full funding grant agreement for a new fixed guideway capital project shall not include a share of more than 60 percent from the funds made available under this section.A full funding grant agreement for a new fixed guideway capital project shall not include a share of more than 60 percent from the funds made available under this section.
(l)(1)(B)(iii)(iii) Grant for core capacity improvement project.—(iii) Grant for core capacity improvement project.—
A grant for a core capacity improvement project shall not exceed 80 percent of the net capital project cost of the incremental cost to increase the capacity [struck: in] the corridor.A grant for a core capacity improvement project shall not exceed 80 percent of the net capital project cost of the incremental cost to increase the capacity [inserted: of] the [inserted: system or ]corridor.
(l)(1)(B)(iv)(iv) Grant for small start project.—(iv) Grant for small start project.—
A grant for a [struck: small] start project shall not exceed 80 percent of the net capital project costs.A grant for a [inserted: streamlined] start project shall not exceed 80 percent of the net capital project costs.
(l)(2)(2) Adjustment for completion under budget.—(2) Adjustment for completion under budget.—
The Secretary may adjust the final net capital project cost of a new fixed guideway capital project or core capacity improvement project evaluated under subsection (d), (e), or (i) to include the cost of eligible activities not included in the originally defined project if the Secretary determines that the originally defined project has been completed at a cost that is significantly below the original estimate.The Secretary may adjust the final net capital project cost of a new fixed guideway capital project or core capacity improvement project evaluated under subsection (d), (e), or (i) to include the cost of eligible activities not included in the originally defined project if the Secretary determines that the originally defined project has been completed at a cost that is significantly below the original estimate.
(l)(3)(3) Maximum government share.—(3) Maximum government share.—
The Secretary may provide a higher grant percentage than requested by the grant recipient if—The Secretary may provide a higher grant percentage than requested by the grant recipient if—

§ 5309(l)Government Share of Net Capital Project Cost.—(6)–(8)

(l)(3)(A)–(5) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(6)(6) Special rule for rolling stock costs.—(6) Special rule for rolling stock costs.—
In addition to amounts allowed pursuant to paragraph (1), a planned extension to a fixed guideway system may include the cost of rolling stock previously purchased if the applicant satisfies the Secretary that only amounts other than amounts provided by the Government were used and that the purchase was made for use on the extension. A refund or reduction of the remainder may be made only if a refund of a proportional amount of the grant of the Government is made at the same time.In addition to amounts allowed pursuant to paragraph (1), a planned extension to a fixed guideway system may include the cost of rolling stock previously purchased if the applicant satisfies the Secretary that only amounts other than amounts provided by the Government were used and that the purchase was made for use on the extension. A refund or reduction of the remainder may be made only if a refund of a proportional amount of the grant of the Government is made at the same time.
(7)(7) Limitation on applicability.—(7) Limitation on applicability.—
This subsection shall not apply to projects for which the Secretary entered into a full funding grant agreement before [struck: the] [struck: date] [struck: of enactment of the Federal Public Transportation Act of ]2012.This subsection shall not apply to projects for which the Secretary entered into a full funding grant agreement before [inserted: October] [inserted: 1,] 2012.
(8)(8) Special rule for fixed guideway bus rapid transit projects.—(8) Special rule for fixed guideway bus rapid transit projects.—
For up to three fixed-guideway bus rapid transit projects each fiscal year the Secretary shall—For up to three fixed-guideway bus rapid transit projects each fiscal year the Secretary shall—
(8)(A)(A) (A)
establish a Government share of at least 80 percent; andestablish a Government share of at least 80 percent; and

§ 5309(m)–(o)

(l)(8)(B)–(m)(2)(A) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(m)(2)(B)(B) Limitation on amount of interest.—(B) Limitation on amount of interest.—
The amount of interest under this paragraph may not be more than the most favorable interest terms reasonably available for the project at the time of borrowing.The amount of interest under this paragraph may not be more than the most favorable interest terms reasonably available for the project at the time of borrowing.
(m)(2)(C)(C) Certification.—(C) Certification.—
The applicant shall certify, in a manner satisfactory to the Secretary, that the applicant has shown reasonable diligence in seeking the most favorable financing terms.The applicant shall certify, in a manner satisfactory to the Secretary, that the applicant has shown reasonable diligence in seeking the most favorable financing terms.
(m)(3)(3) [inserted: Pre-project development phase costs.—]
[inserted: The Secretary shall pay the Government share of project costs incurred by a State or local governmental authority that carries out any part of a project described in this section without the aid of amounts of the Government and according to all applicable procedures and requirements, if—]
(m)(3)(A)(A) [inserted: ]
[inserted: the project development costs of the project were incurred by the State or local governmental authority before the date on which the project entered into the project development phase;]
(m)(3)(B)(B) [inserted: ]
[inserted: the project—]
(m)(3)(B)(i)(i) [inserted: ]
[inserted: in the case of a project under subsections (d) or (e), advances to the engineering phase; or]
(m)(3)(B)(ii)(ii) [inserted: ]
[inserted: in the case of a project under subsection (h), advances to the construction phase; and]
(m)(3)(C)(C) [inserted: ]
[inserted: the State or local governmental authority applies for payment of such Government share.]
(n)(n) Availability of Amounts.—(n) Availability of Amounts.—
(n)(1)(1) In general.—(1) In general.—
An amount made available or appropriated for a new fixed guideway capital project or core capacity improvement project shall remain available to that project for 4 fiscal years, including the fiscal year in which the amount is made available or appropriated. Any amounts that are unobligated to the project at the end of the 4-fiscal-year period may be used by the Secretary for any purpose under this section.An amount made available or appropriated for a new fixed guideway capital project or core capacity improvement project shall remain available to that project for 4 fiscal years, including the fiscal year in which the amount is made available or appropriated. Any amounts that are unobligated to the project at the end of the 4-fiscal-year period may be used by the Secretary for any purpose under this section.
(n)(2)(2) Use of deobligated amounts.—(2) Use of deobligated amounts.—
An amount available under this section that is deobligated may be used for any purpose under this section.An amount available under this section that is deobligated may be used for any purpose under this section.
(o)(o) Reports on New Fixed Guideway and Core Capacity Improvement Projects.—(o) Reports on New Fixed Guideway and Core Capacity Improvement Projects.—
(o)(1)(1) Annual report on funding recommendations.—(1) Annual report on funding recommendations.—
Not later than the first Monday in February of each year, the Secretary shall submit to the Committee on Banking, Housing, and Urban Affairs and the Committee on Appropriations of the Senate and the Committee on Transportation and Infrastructure and the Committee on Appropriations of the House of Representatives a report that includes—Not later than the first Monday in February of each year, the Secretary shall submit to the Committee on Banking, Housing, and Urban Affairs and the Committee on Appropriations of the Senate and the Committee on Transportation and Infrastructure and the Committee on Appropriations of the House of Representatives a report that includes—
(o)(1)(A)(A) (A)
a proposal of allocations of amounts to be available to finance grants for projects under this section among applicants for these amounts;a proposal of allocations of amounts to be available to finance grants for projects under this section among applicants for these amounts;
(o)(1)(B)(B) [struck: ]
[struck: evaluations and ratings, as required under subsections (d), (e), and (i), for each such project that is in project development, engineering, or has received a full funding grant agreement; and]
(o)(1)(C)(C) (C)
[inserted: recommendations of such projects for funding—]
(o)(1)(C)(i)(i) [inserted: ]
[inserted: based on the evaluations and ratings and on existing commitments and anticipated funding levels for the next 3 fiscal years based on information currently available to the Secretary; and]
(o)(1)(C)(ii)(ii) [inserted: ]
[inserted: prioritizing projects submitted under subsection (u); and]
(o)(1)(C)(C) [inserted: ]
[inserted: a narrative summary for projects for which the Secretary adjusted the rating of the economic development criterion pursuant to subsection (g)(2)(D) or (h)(6)(C).]
(o)(1)(C)[struck: recommendations of such projects for funding based on the evaluations and ratings and on existing commitments and anticipated funding levels for the next 3 fiscal years based on information currently available to the Secretary.]
(o)(2)(2) Biennial gao review.—(2) Biennial gao review.—
The Comptroller General of the United States shall—The Comptroller General of the United States shall—
(o)(2)(A)(A) (A)
conduct a biennial review that—conduct a biennial review that—
(o)(2)(A)(i)(i) (i)
assesses—assesses—
(o)(2)(A)(i)(I)(I) (I)
the processes and procedures for evaluating, rating, and recommending all new fixed guideway capital projects and core capacity improvement projects for grant agreements under this section[struck: and section 3005(b) of the Federal Public Transportation Act of 2015 (49 U.S.C. 5309 note]; [struck: Public Law 114–94); ]andthe processes and procedures for evaluating, rating, and recommending all new fixed guideway capital projects and core capacity improvement projects for grant agreements under this section; and
(o)(2)(A)(i)(II)(II) (II)
the Secretary’s implementation of such processes and procedures;the Secretary’s implementation of such processes and procedures;
(o)(2)(A)(ii)(ii) (ii)
includes, with respect to projects that entered into revenue service since the previous biennial review—includes, with respect to projects that entered into revenue service since the previous biennial review—

§ 5309(o)–(q)

(o)(2)(A)(ii)(I)–(III) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(o)(2)(A)(iii)(iii) (iii)
in conducting the review under clause (ii), incorporates information from the plans submitted by applicants under subsection (k)(2)(E)(i); andin conducting the review under clause (ii), incorporates information from the plans submitted by applicants under subsection (k)(2)(E)(i); and
(o)(2)(B)(B) (B)
report to Congress on the results of such review by May 31 of the applicable year.report to Congress on the results of such review by May 31 of the applicable year.
(o)(3)(3) [inserted: Evaluations and rating.—]
[inserted: Concurrently with updates made pursuant to subsection (r)(2), the Secretary shall submit to Congress, and make available to the public, report evaluations and ratings, as required under subsections (d), (e), and (h), for each such project that—]
(o)(3)(A)(A) [inserted: ]
[inserted: is in the project development phase;]
(o)(3)(B)(B) [inserted: ]
[inserted: is in the engineering phase; or]
(o)(3)(C)(C) [inserted: ]
[inserted: has received a full funding grant agreement.]
(p)(p) Special [struck: Rule].—(p) Special [inserted: rules regarding cost effectiveness].—
(p)(1)(1) [inserted: Treatment of certain capital costs]
[inserted: For the purposes of calculating the cost effectiveness of a project described in subsection (d) or (e), the Secretary shall not reduce or eliminate the capital costs of art and non-functional landscaping elements from the annualized capital cost calculation.]
(p)(2)(2) [inserted: Alternative metric consideration.—]
[inserted: In making a determination regarding the cost effectiveness of a project under subsection (d)(2)(A)(iii) or (e)(2)(A)(iii), the Secretary may consider, in addition to the measurement of cost per rider, upon request of the project sponsor, an alternative metric for cost effectiveness determined appropriate by the Secretary.]
(p)[struck: For the purposes of calculating the cost effectiveness of a project described in subsection (d) or (e), the Secretary shall not reduce or eliminate the capital costs of art and non-functional landscaping elements from the annualized capital cost calculation.]
(q)(q) Joint Public Transportation and Intercity Passenger Rail Projects.—(q) Joint Public Transportation and Intercity Passenger Rail Projects.—
(q)(1)(1) In general.—(1) In general.—
The Secretary may make grants for new fixed guideway capital projects and core capacity improvement projects that provide both public transportation and intercity passenger rail service.The Secretary may make grants for new fixed guideway capital projects and core capacity improvement projects that provide both public transportation and intercity passenger rail service.

§ 5309(r)–(t)

(q)(2)–(r)(1) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(r)(2)(2) Updates.—(2) Updates.—
The Secretary shall update the information provided under paragraph (1) not less frequently than monthly.The Secretary shall update the information provided under paragraph (1) not less frequently than monthly.
(r)(3)(3) Project profiles.—(3) Project profiles.—
The Secretary shall continue to make profiles for projects that have applied for or are receiving assistance under this section publicly available in an easily identifiable location on the website of the Department of Transportation, in the same manner as the Secretary did as of the day before the date of enactment of this subsection.The Secretary shall continue to make profiles for projects that have applied for or are receiving assistance under this section publicly available in an easily identifiable location on the website of the Department of Transportation, in the same manner as the Secretary did as of the day before the date of enactment of this subsection.
(s)(s) [inserted: Alternative project delivery.—]
(s)(1)(1) [inserted: In general.—]
[inserted: Notwithstanding contract requirements in section 5306(z), the Secretary may allow an applicant to enter into a covered project delivery contract with respect to a project for which the applicant requests funds under this section.]
(s)(2)(2) [inserted: Covered project delivery contract defined.—]
[inserted: In this subsection, the term “covered project delivery contract” means—]
(s)(2)(A)(A) [inserted: ]
[inserted: an agreement that provides for both design and construction of a project by 1 or more contractors through alternative project delivery methods, including construction manager/general contractor, construction manager-at-risk, progressive design build, or any other alternative project delivery method; or]
(s)(2)(B)(B) [inserted: ]
[inserted: a single contract for the delivery of a whole project that—]
(s)(2)(B)(i)(i) [inserted: ]
[inserted: includes, at a minimum, the sponsor, builder, and designer as parties subject to the terms of the contract;]
(s)(2)(B)(ii)(ii) [inserted: ]
[inserted: aligns the interests of all parties to the contract with respect to the project costs and project outcomes; and]
(s)(2)(B)(iii)(iii) [inserted: ]
[inserted: includes processes to ensure transparency and collaboration among all parties to the contract with respect to the project costs and project outcomes.]
(t)(t) [inserted: Special rule for risk assessment and lock-in date.—]
[inserted: With respect to core capacity improvement projects and new fixed guideway capital projects, the Secretary may not determine a maximum Capital Investment Grant contribution or conduct a risk assessment until 120 days after the project enters into the engineering phase, except the Secretary may conduct a risk assessment earlier upon request from the project sponsor.]

Step through the changes