Title 49 · TransportationTransportation
Changes to 49 U.S.C. § 6701
H.R. 8870 · BUILD America 250 Act · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
Reported by committee · step 2 of 5
49 U.S.C. § 6701 National infrastructure project assistance
12 changes the bill asks for here, 11 carried out
- Carried out:
in subsection (a)(2)(E) by inserting
, a lessee of a Federal surface transportation hub,
afterspecial purpose district
; - Not carried out:
by striking subparagraph (E) of subsection (d)(1) and inserting the following:
(E) a public transportation project— (i) that is— (I) eligible for assistance under chapter 53; and (II) part of a project described in any of subparagraphs (A) through (D); or (ii) that is— (I) eligible for assistance under section 5309; and (II) located in an urbanized area of 200,000 or more population; or;
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: striking subparagraph (X) of subsection (X) (X) and inserting the following: QCONTENT; - Carried out:
in subparagraph (B)(v) by striking
impacts,
and all that follows throughresilience;
and insertingimpacts;
; and - Carried out:
in subparagraph (E) by striking
, including with respect to short- and long-term job access, growth, or creation
; - Carried out:
in subparagraph (C) by striking
uses
and all that follows throughtechnologies
and insertinguses innovative construction materials or technologies
; - Carried out:
by redesignating subparagraphs (D) through (F) as subparagraphs (E) through (G), respectively;
- Carried out:
by inserting after subparagraph (C) the following:
(D) whether a project would address the impact of population growth on the movement of people and freight; and; and
- Carried out:
in subparagraph (F), as so redesignated, by striking
transportation, including
and all that follows throughrail; and
and insertingtransportation; and
; - Carried out:
in subsection (h)(1)(B) by striking
for the purpose of improving habitat for aquatic species
and insertingthat are eligible under section 176(d) of title 23
; - Carried out:
in subsection (k) by striking
30 days
and inserting3 days
; and - Carried out:
in paragraph (1) by striking
fiscal years 2022 through 2026
and insertingfiscal years 2027 through 2031
; and - Carried out:
in paragraph (2) by striking
50 percent
and inserting25 percent
.
§ 6701(a)(2)Eligible entity.—(D)–(G)
Start of § 6701 to (a)(2)(C) unchanged ·
(D) a political subdivision of a State;
(E) a special purpose district[inserted: ,] [inserted: a lessee of a Federal surface transportation hub, ]or public authority with a transportation function, including a port authority;
(F) a Tribal government or a consortium of Tribal governments;
(G) a partnership between Amtrak and 1 or more entities described in subparagraphs (A) through (F); and
§ 6701(f)Project Evaluation and Selection.—(2)–(4)
(a)(2)(H)–(f)(2)(B) unchanged ·
(iv) improved person or freight throughput, including improved mobility and reliability; and
(v) [inserted: environmental benefits and health impacts;]
[struck: environmental benefits and health impacts, such as—]
[struck: (I)] [struck: reductions in greenhouse gas emissions;]
[struck: (II)] [struck: air quality benefits;]
[struck: (III)] [struck: preventing stormwater runoff that would be a detriment to aquatic species; and]
[struck: (IV)] [struck: improved infrastructure resilience;]
(C) the benefits of the project, as compared to the costs of the project;
(D) the number of persons or volume of freight, as applicable, supported by the project; and
(E) national and regional economic benefits of the project[struck: , including with respect to short- and long-term job access, growth, or creation].
(3) Additional considerations.— In selecting projects to receive grants under the program, the Secretary shall take into consideration—
(A) contributions to geographical diversity among grant recipients, including a balance between the needs of rural and urban communities;
(B) whether multiple States would benefit from a project;
(C) [inserted: whether, and the degree to which, a project uses innovative construction materials or technologies that will allow for future connectivity and automation;]
(D) [inserted: whether a project would address the impact of population growth on the movement of people and freight; and]
[struck: whether, and the degree to which, a project uses—]
[struck: (i)] [struck: construction materials or approaches that have—]
[struck: (I)] [struck: demonstrated reductions in greenhouse gas emissions; or]
[struck: (II)] [struck: reduced the need for maintenance of other projects; or]
[struck: (ii)] [struck: technologies that will allow for future connectivity and automation;]
[struck: (D)] [inserted: (E)] whether a project would benefit—
(i) a historically disadvantaged community or population; or
(ii) an area of persistent poverty;
[struck: (E)] [inserted: (F)] [inserted: whether a project benefits users of multiple modes of transportation; and]
[struck: whether a project benefits users of multiple modes of transportation, including—]
[struck: (i)] [struck: pedestrians;]
[struck: (ii)] [struck: bicyclists; and]
[struck: (iii)] [struck: users of nonvehicular rail and public transportation, including intercity and commuter rail; and]
[struck: (F)] [inserted: (G)] whether a project improves connectivity between modes of transportation moving persons or goods nationally or regionally.
(4) Ratings.—
(A) In general.— In evaluating applications for a grant under the program, the Secretary shall assign the project proposed in the application a rating described in subparagraph (B), based on the information contained in the applicable notice published under paragraph (5).
§ 6701(h)–(i)
(f)(4)(B)–(h)(1) unchanged ·
(A) development-phase activities and costs, including planning, feasibility analysis, revenue forecasting, alternatives analysis, data collection and analysis, environmental review and activities to support environmental review, preliminary engineering and design work, and other preconstruction activities, including the preparation of a data collection and post-construction analysis plan under subsection (g); and
(B) construction, reconstruction, rehabilitation, acquisition of real property (including land relating to the project and improvements to that land), environmental mitigation (including projects to replace or rehabilitate culverts or reduce stormwater runoff [struck: for][inserted: that] [struck: the][inserted: are] [struck: purpose][inserted: eligible] [struck: of][inserted: under] [struck: improving][inserted: section] [struck: habitat][inserted: 176(d)] [struck: for][inserted: of] [struck: aquatic][inserted: title] [struck: species][inserted: 23]), construction contingencies, acquisition of equipment, protection, and operational improvements directly relating to the project.
(2) Interest and other financing costs.— The interest and other financing costs of carrying out any part of a project under a multiyear grant agreement within a reasonable period of time shall be considered to be an eligible project cost only if the applicable eligible entity certifies to the Secretary that the eligible entity has demonstrated reasonable diligence in seeking the most favorable financing terms.
(i) Cost Sharing.—
§ 6701(j)–(k)
(i)(1)–(j)(3) unchanged ·
(4) Single-year grants.— The Secretary may only provide to an eligible entity a full grant under the program in a single year if all reviews required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to the applicable project have been completed before the receipt of any program funds.
(k) Congressional Notification.—
(1) In general.— Not later than [struck: 30][inserted: 3] days before the date on which the Secretary publishes the selection of projects to receive grants under the program, the Secretary shall submit to the Committee on Commerce, Science, and Transportation of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a written notice that includes—
(A) a list of all project applications reviewed by the Secretary as part of the selection process;
(B) the rating assigned to each project under subsection (f)(4);
§ 6701(l)–(m)
(k)(1)(C)–(l)(2)(B) unchanged ·
(ii) the justification and criteria used for the selection of the projects.
(m) Authorization of Appropriations.—
(1) In general.— There is authorized to be appropriated to the Secretary to carry out the program $2,000,000,000 for each of fiscal years [struck: 2022][inserted: 2027] through [struck: 2026][inserted: 2031].
(2) Other projects.— Of the amounts made available under paragraph (1), [struck: 50][inserted: 25] percent shall be set aside for projects that have a project cost of—
(A) more than $100,000,000; but
(B) less than $500,000,000.
Rest of § 6701 unchanged ·