30 U.S.C. § 1269 Release of performance bonds or deposits

+3 −3Shown
More for 30 U.S.C. § 1269
Read § 1269
4 changes the bill asks for here, 4 carried out
  1. Carried out:

    by inserting and section 515(b)(3), or section 515(c)(7), as applicable, after with his approved reclamation plan; and

  2. Carried out:

    by striking 60 and inserting 40;

  3. Carried out:

    in paragraph (2), by inserting and section 515(b)(19) after in accordance with the approved reclamation plan; and

  4. Carried out:

    in paragraph (3), by inserting in accordance with the approved reclamation plan and section 515(b)(20), after When the operator has completed successfully all surface coal mining and reclamation activities.

§ 1269(c)–(e)

Start of § 1269 to (b) unchanged ·

(c) Requirements for release The regulatory authority may release in whole or in part said bond or deposit if the authority is satisfied the reclamation covered by the bond or deposit or portion thereof has been accomplished as required by this chapter according to the following schedule:

(1) When the operator completes the backfilling, regrading, and drainage control of a bonded area in accordance with his approved reclamation plan[inserted: and section 515(b)(3)], [inserted: or section 515(c)(7), as applicable,, ]the release of [struck: 60][inserted: 40] per centum of the bond or collateral for the applicable permit area.

(2) After revegetation has been established on the regraded mined lands in accordance with the approved reclamation plan[inserted: and section 515(b)(19)]. When determining the amount of bond to be released after successful revegetation has been established, the regulatory authority shall retain that amount of bond for the revegetated area which would be sufficient for a third party to cover the cost of reestablishing reveg­etation and for the period specified for operator responsibility in section 1265 of this title of reestablishing revegetation. No part of the bond or deposit shall be released under this paragraph so long as the lands to which the release would be applicable are contributing suspended solids to streamflow or runoff outside the permit area in excess of the requirements set by section 1265(b)(10) of this title or until soil productivity for prime farm lands has returned to equivalent levels of yield as nonmined land of the same soil type in the surrounding area under equivalent management practices as determined from the soil survey performed pursuant to section 1257(b)(16) of this title. Where a silt dam is to be retained as a permanent impoundment pursuant to section 1265(b)(8) of this title, the portion of bond may be released under this paragraph so long as provisions for sound future maintenance by the operator or the landowner have been made with the regulatory authority.

(3) When the operator has completed successfully all surface coal mining and reclamation activities[inserted: in accordance with the approved reclamation plan and section 515(b)(20)],[inserted: ,] the release of the remaining portion of the bond, but not before the expiration of the period specified for operator responsibility in section 1265 of this title: Provided, however, That no bond shall be fully released until all reclamation requirements of this chapter are fully met.

(d) Notice of disapproval If the regulatory authority disapproves the application for release of the bond or portion thereof, the authority shall notify the permittee, in writing, stating the reasons for disapproval and recommending corrective actions necessary to secure said release and allowing opportunity for a public hearing.

(e) Notice to municipality When any application for total or partial bond release is filed with the regulatory authority, the regulatory authority shall notify the municipality in which a surface coal mining operation is located by certified mail at least thirty days prior to the release of all or a portion of the bond.

Rest of § 1269 unchanged ·