Changes to the Code
H.R. 9023 · CLEAN UP Mines Act of 2026 · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
30 U.S.C. § 1258 Reclamation plan requirements
1 change the bill asks for here, 1 carried out
- Carried out:
Section 508(a)(7) of the Surface Mining Control and Reclamation Act of 1977 (30 U.S.C. 1258(a)(7)) is amended by inserting
, not to exceed the standards established in section 515(b)(3)
afterreclamation plan
.
§ 1258(a)Each reclamation plan submitted as part of a permit application pursuant to…(6)–(9)
Start of § 1258 to (a)(5) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (6) | (6) | (6) | ||
| the consideration which has been given to maximize the utilization and conservation of the solid fuel resource being recovered so that reaffecting the land in the future can be minimized; | the consideration which has been given to maximize the utilization and conservation of the solid fuel resource being recovered so that reaffecting the land in the future can be minimized; | |||
| (7) | (7) | (7) | ||
| a detailed estimated timetable for the accomplishment of each major step in the reclamation plan; | a detailed estimated timetable for the accomplishment of each major step in the reclamation plan[inserted: , not to exceed the standards established in section 515(b)(3)]; | |||
| (8) | (8) | (8) | ||
| the consideration which has been given to making the surface mining and reclamation operations consistent with surface owner plans, and applicable State and local land use plans and programs; | the consideration which has been given to making the surface mining and reclamation operations consistent with surface owner plans, and applicable State and local land use plans and programs; | |||
| (9) | (9) | (9) | ||
| the steps to be taken to comply with applicable air and water quality laws and regulations and any applicable health and safety standards; | the steps to be taken to comply with applicable air and water quality laws and regulations and any applicable health and safety standards; |
Rest of § 1258 unchanged
30 U.S.C. § 1261 Revision of permits
2 changes the bill asks for here, 2 carried out
- Carried out:
by redesignating paragraph (3) as paragraph (5); and
- Carried out:
by inserting after paragraph (2) the following:
(3) A request to temporarily cease or suspend mining operations is a significant permit revision for purposes of paragraph (2). (4) In each case where no active coal removal or reclamation has occurred at a permitted mine for more than 6 months during any 3-year period, the …
§ 1261(a)–(c)
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| § 1261. Revision of permits | § 1261. Revision of permits | |||
| (a) | (a) Application and revised reclamation plan; requirements; extensions to area covered | (a) Application and revised reclamation plan; requirements; extensions to area covered | ||
| (a)(1) | (1) | (1) | ||
| During the term of the permit the permittee may submit an application for a revision of the permit, together with a revised reclamation plan, to the regulatory authority. | During the term of the permit the permittee may submit an application for a revision of the permit, together with a revised reclamation plan, to the regulatory authority. | |||
| (a)(2) | (2) | (2) | ||
| An application for a revision of a permit shall not be approved unless the regulatory authority finds that reclamation as required by this chapter and the State or Federal program can be accomplished under the revised reclamation plan. The revision shall be approved or disapproved within a period of time established by the State or Federal program. The regulatory authority shall establish guidelines for a determination of the scale or extent of a revision request for which all permit application information requirements and procedures, including notice and hearings, shall apply: Provided, That any revisions which propose significant alterations in the reclamation plan shall, at a minimum, be subject to notice and hearing requirements. | An application for a revision of a permit shall not be approved unless the regulatory authority finds that reclamation as required by this chapter and the State or Federal program can be accomplished under the revised reclamation plan. The revision shall be approved or disapproved within a period of time established by the State or Federal program. The regulatory authority shall establish guidelines for a determination of the scale or extent of a revision request for which all permit application information requirements and procedures, including notice and hearings, shall apply: Provided, That any revisions which propose significant alterations in the reclamation plan shall, at a minimum, be subject to notice and hearing requirements. | |||
| (a)(3) | (3) [inserted: ] | |||
| [inserted: A request to temporarily cease or suspend mining operations is a significant permit revision for purposes of paragraph (2).] | ||||
| (a)(4) | (4) [inserted: ] | |||
| [inserted: In each case where no active coal removal or reclamation has occurred at a permitted mine for more than 6 months during any 3-year period, the applicable permit shall be considered out of compliance with the reclamation plan—] | ||||
| (a)(4)(A) | (A) [inserted: ] | |||
| [inserted: unless the permit is in compliance with the standards established in section 515(b)(3) and does not have any variances from such standards; and] | ||||
| (a)(4)(B) | (B) [inserted: ] | |||
| [inserted: until the date on which the regulatory authority approves—] | ||||
| (a)(4)(B)(i) | (i) [inserted: ] | |||
| [inserted: a reasonable plan submitted by the operator to return to production not later than 1 year after the date on which the operator is notified that the applicable permit is considered out of compliance under this paragraph; or] | ||||
| (a)(4)(B)(ii) | (ii) [inserted: ] | |||
| [inserted: an application for a revision of the permit submitted by the permittee under paragraph (1).] | ||||
| (a)(5) | [inserted: (5)] | |||
| Any extensions to the area covered by the permit except incidental boundary revisions must be made by application for another permit. | Any extensions to the area covered by the permit except incidental boundary revisions must be made by application for another permit. | |||
| (b) | (b) Transfer, assignment, or sale of rights under permit | (b) Transfer, assignment, or sale of rights under permit | ||
| No transfer, assignment, or sale of the rights granted under any permit issued pursuant to this chapter shall be made without the written approval of the regulatory authority. | No transfer, assignment, or sale of the rights granted under any permit issued pursuant to this chapter shall be made without the written approval of the regulatory authority. | |||
| (c) | (c) Review of outstanding permits | (c) Review of outstanding permits | ||
| The regulatory authority shall within a time limit prescribed in regulations promulgated by the regulatory authority, review outstanding permits and may require reasonable revision or modification of the permit provisions during the term of such permit: Provided, That such revision or modification shall be based upon a written finding and subject to notice and hearing requirements established by the State or Federal program. | The regulatory authority shall within a time limit prescribed in regulations promulgated by the regulatory authority, review outstanding permits and may require reasonable revision or modification of the permit provisions during the term of such permit: Provided, That such revision or modification shall be based upon a written finding and subject to notice and hearing requirements established by the State or Federal program. | |||
30 U.S.C. § 1265 Environmental protection performance standards
11 changes the bill asks for here, 9 carried out
- Carried out:
by inserting
and not later than 180 days after the date of the last coal production as reported pursuant to section 402(c)
afterexcept as provided in subsection (c)
; - Carried out:
by inserting
ensure proper drainage control,
afterwith respect to all surface coal mining operations
; and - Carried out:
by inserting
and complete all final backfilling and grading before the equipment necessary for backfilling and grading is removed from the site
afterto retain moisture to assist revegetation or as otherwise authorized pursuant to this Act)
; - Carried out:
in paragraph (16), by inserting
, with such specific requirements for maximum time periods allowable for contemporaneous reclamation set forth in paragraphs (3), (19), and (20) of this subsection, paragraph (7) of subsection (c), and section 519(c)
aftercontemporaneously as practicable with the surface coal mining operations
; - Carried out:
in paragraph (19), by inserting
not later than 36 months after the date of last coal production as reported pursuant to section 402(c)
beforeestablish on the regraded areas
; - Not carried out:
in subparagraph (B), by striking the period at the end and inserting
; and
; andThe bill strikes “.” at the end of § 1265(b)(20)(B), but the text there doesn't end with it. The law may have changed since the bill was drafted.
Technical detail
“.” is not at the end of /us/usc/t30/s1265/b/20/B - Carried out:
by adding at the end the following:
(C) in no instance shall the operator be allowed more than 1 year greater than the time periods set forth in this subsection to achieve successful revegetation;;
- Not carried out:
in paragraph (22)(I), by striking the period at the end and inserting a semicolon
;
The bill strikes “.” at the end of § 1265(b)(22)(I), but the text there doesn't end with it. The law may have changed since the bill was drafted.
Technical detail
“.” is not at the end of /us/usc/t30/s1265/b/22/I - Carried out:
in paragraph (23), by striking
and
at the end; and - Carried out:
in paragraph (24), by adding
and
at the end; and - Carried out:
in subsection (c), by adding at the end the following:
(7) All backfilling and regrading to ensure proper drainage control, prevent leaching of toxic materials, eliminate highwalls, spoil piles, and depressions (unless small depressions are needed in order to retain moisture to assist revegetation or as otherwise authorized pursuant …
§ 1265(b)General standards(2)–(5)
Start of § 1265 to (b)(1) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (2) | (2) | (2) | ||
| restore the land affected to a condition capable of supporting the uses which it was capable of supporting prior to any mining, or higher or better uses of which there is reasonable likelihood, so long as such use or uses do not present any actual or probable hazard to public health or safety or pose any actual or probable threat of water diminution or pollution, and the permit applicants’ declared proposed land use following reclamation is not deemed to be impractical or unreasonable, inconsistent with applicable land use policies and plans, involves unreasonable delay in implementation, or is violative of Federal, State, or local law; | restore the land affected to a condition capable of supporting the uses which it was capable of supporting prior to any mining, or higher or better uses of which there is reasonable likelihood, so long as such use or uses do not present any actual or probable hazard to public health or safety or pose any actual or probable threat of water diminution or pollution, and the permit applicants’ declared proposed land use following reclamation is not deemed to be impractical or unreasonable, inconsistent with applicable land use policies and plans, involves unreasonable delay in implementation, or is violative of Federal, State, or local law; | |||
| (3) | (3) | (3) | ||
| except as provided in subsection (c) with respect to all surface coal mining operations backfill, compact (where advisable to insure stability or to prevent leaching of toxic materials), and grade in order to restore the approximate original contour of the land with all highwalls, spoil piles, and depressions eliminated (unless small depressions are needed in order to retain moisture to assist revegetation or as otherwise authorized pursuant to this chapter): Provided, however, That in surface coal mining which is carried out at the same location over a substantial period of time where the operation transects the coal deposit, and the thickness of the coal deposits relative to the volume of the overburden is large and where the operator demonstrates that the overburden and other spoil and waste materials at a particular point in the permit area or otherwise available from the entire permit area is insufficient, giving due consideration to volumetric expansion, to restore the approximate original contour, the operator, at a minimum, shall backfill, grade, and compact (where advisable) using all available overburden and other spoil and waste materials to attain the lowest practicable grade but not more than the angle of repose, to provide adequate drainage and to cover all acid-forming and other toxic materials, in order to achieve an ecologically sound land use compatible with the surrounding region: And provided further, That in surface coal mining where the volume of overburden is large relative to the thickness of the coal deposit and where the operator demonstrates that due to volumetric expansion the amount of overburden and other spoil and waste materials removed in the course of the mining operation is more than sufficient to restore the approximate original contour, the operator shall after restoring the approximate contour, backfill, grade, and compact (where advisable) the excess overburden and other spoil and waste materials to attain the lowest grade but not more than the angle of repose, and to cover all acid-forming and other toxic materials, in order to achieve an ecologically sound land use compatible with the surrounding region and that such overburden or spoil shall be shaped and graded in such a way as to prevent slides, erosion, and water pollution and is revegetated in accordance with the requirements of this chapter; | except as provided in subsection (c) [inserted: and not later than 180 days after the date of the last coal production as reported pursuant to section 402(c) ]with respect to all surface coal mining operations [inserted: ensure proper drainage control, ]backfill, compact (where advisable to insure stability or to prevent leaching of toxic materials), and grade in order to restore the approximate original contour of the land with all highwalls, spoil piles, and depressions eliminated (unless small depressions are needed in order to retain moisture to assist revegetation or as otherwise authorized pursuant to this chapter)[inserted: and complete all final backfilling and grading before the equipment necessary for backfilling and grading is removed from the site]: Provided, however, That in surface coal mining which is carried out at the same location over a substantial period of time where the operation transects the coal deposit, and the thickness of the coal deposits relative to the volume of the overburden is large and where the operator demonstrates that the overburden and other spoil and waste materials at a particular point in the permit area or otherwise available from the entire permit area is insufficient, giving due consideration to volumetric expansion, to restore the approximate original contour, the operator, at a minimum, shall backfill, grade, and compact (where advisable) using all available overburden and other spoil and waste materials to attain the lowest practicable grade but not more than the angle of repose, to provide adequate drainage and to cover all acid-forming and other toxic materials, in order to achieve an ecologically sound land use compatible with the surrounding region: And provided further, That in surface coal mining where the volume of overburden is large relative to the thickness of the coal deposit and where the operator demonstrates that due to volumetric expansion the amount of overburden and other spoil and waste materials removed in the course of the mining operation is more than sufficient to restore the approximate original contour, the operator shall after restoring the approximate contour, backfill, grade, and compact (where advisable) the excess overburden and other spoil and waste materials to attain the lowest grade but not more than the angle of repose, and to cover all acid-forming and other toxic materials, in order to achieve an ecologically sound land use compatible with the surrounding region and that such overburden or spoil shall be shaped and graded in such a way as to prevent slides, erosion, and water pollution and is revegetated in accordance with the requirements of this chapter; | |||
| (4) | (4) | (4) | ||
| stabilize and protect all surface areas including spoil piles affected by the surface coal mining and reclamation operation to effectively control erosion and attendant air and water pollution; | stabilize and protect all surface areas including spoil piles affected by the surface coal mining and reclamation operation to effectively control erosion and attendant air and water pollution; | |||
| (5) | (5) | (5) | ||
| remove the topsoil from the land in a separate layer, replace it on the backfill area, or if not utilized immediately, segregate it in a separate pile from other spoil and when the topsoil is not replaced on a backfill area within a time short enough to avoid deterioration of the topsoil, maintain a successful cover by quick growing plant or other means thereafter so that the topsoil is preserved from wind and water erosion, remains free of any contamination by other acid or toxic material, and is in a usable condition for sustaining vegetation when restored during reclamation, except if topsoil is of insufficient quantity or of poor quality for sustaining vegetation, or if other strata can be shown to be more suitable for vegetation requirements, then the operator shall remove, segregate, and preserve in a like manner such other strata which is best able to support vegetation; | remove the topsoil from the land in a separate layer, replace it on the backfill area, or if not utilized immediately, segregate it in a separate pile from other spoil and when the topsoil is not replaced on a backfill area within a time short enough to avoid deterioration of the topsoil, maintain a successful cover by quick growing plant or other means thereafter so that the topsoil is preserved from wind and water erosion, remains free of any contamination by other acid or toxic material, and is in a usable condition for sustaining vegetation when restored during reclamation, except if topsoil is of insufficient quantity or of poor quality for sustaining vegetation, or if other strata can be shown to be more suitable for vegetation requirements, then the operator shall remove, segregate, and preserve in a like manner such other strata which is best able to support vegetation; |
§ 1265(b)General standards(15)–(16)
(b)(6)–(15) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (15)(E) | (E) | (E) | ||
| provide that upon the request of a resident or owner of a man-made dwelling or structure within one-half mile of any portion of the permitted area the applicant or permittee shall conduct a pre-blasting survey of such structures and submit the survey to the regulatory authority and a copy to the resident or owner making the request. The area of the survey shall be decided by the regulatory authority and shall include such provisions as the Secretary shall promulgate.4 | provide that upon the request of a resident or owner of a man-made dwelling or structure within one-half mile of any portion of the permitted area the applicant or permittee shall conduct a pre-blasting survey of such structures and submit the survey to the regulatory authority and a copy to the resident or owner making the request. The area of the survey shall be decided by the regulatory authority and shall include such provisions as the Secretary shall promulgate.4 | |||
| (16) | (16) | (16) | ||
| insure that all reclamation efforts proceed in an environmentally sound manner and as contemporaneously as practicable with the surface coal mining operations: Provided, however, That where the applicant proposes to combine surface mining operations with underground mining operations to assure maximum practical recovery of the mineral resources, the regulatory authority may grant a variance for specific areas within the reclamation plan from the requirement that reclamation efforts proceed as contemporaneously as practicable to permit underground mining operations prior to reclamation: | insure that all reclamation efforts proceed in an environmentally sound manner and as contemporaneously as practicable with the surface coal mining operations[inserted: , with such specific requirements for maximum time periods allowable for contemporaneous reclamation set forth in paragraphs (3), (19), and (20) of this subsection, paragraph (7) of subsection (c), and section 519(c)]: Provided, however, That where the applicant proposes to combine surface mining operations with underground mining operations to assure maximum practical recovery of the mineral resources, the regulatory authority may grant a variance for specific areas within the reclamation plan from the requirement that reclamation efforts proceed as contemporaneously as practicable to permit underground mining operations prior to reclamation: | |||
| (16)(A) | (A) | (A) | ||
| if the regulatory authority finds in writing that: | if the regulatory authority finds in writing that: | |||
| (16)(A)(i) | (i) | (i) | ||
| the applicant has presented, as part of the permit application, specific, feasible plans for the proposed underground mining operations; | the applicant has presented, as part of the permit application, specific, feasible plans for the proposed underground mining operations; |
§ 1265(b)General standards(18)–(22)
(b)(16)(A)(ii)–(17) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (18) | (18) | (18) | ||
| refrain from the construction of roads or other access ways up a stream bed or drainage channel or in such proximity to such channel so as to seriously alter the normal flow of water; | refrain from the construction of roads or other access ways up a stream bed or drainage channel or in such proximity to such channel so as to seriously alter the normal flow of water; | |||
| (19) | (19) | (19) | ||
| establish on the regraded areas, and all other lands affected, a diverse, effective, and permanent vegetative cover of the same seasonal variety native to the area of land to be affected and capable of self-regeneration and plant succession at least equal in extent of cover to the natural vegetation of the area; except, that introduced species may be used in the revegetation process where desirable and necessary to achieve the approved postmining land use plan; | [inserted: not later than 36 months after the date of last coal production as reported pursuant to section 402(c) ]establish on the regraded areas, and all other lands affected, a diverse, effective, and permanent vegetative cover of the same seasonal variety native to the area of land to be affected and capable of self-regeneration and plant succession at least equal in extent of cover to the natural vegetation of the area; except, that introduced species may be used in the revegetation process where desirable and necessary to achieve the approved postmining land use plan; | |||
| (20) | (20) | (20) | ||
| (20)(A) | (A) | (A) | ||
| assume the responsibility for successful revegetation, as required by paragraph (19) above, for a period of five full years after the last year of augmented seeding, fertilizing, irrigation, or other work in order to assure compliance with paragraph (19) above, except in those areas or regions of the country where the annual average precipitation is twenty-six inches or less, then the operator’s assumption of responsibility and liability will extend for a period of ten full years after the last year of augmented seeding, fertilizing, irrigation, or other work: Provided, That when the regulatory authority approves a long-term intensive agricultural postmining land use, the applicable five- or ten-year period of responsibility for revegetation shall commence at the date of initial planting for such long-term intensive agricultural postmining land use: Provided further, That when the regulatory authority issues a written finding approving a long-term, intensive, agricultural postmining land use as part of the mining and reclamation plan, the authority may grant exception to the provisions of paragraph (19) above; | assume the responsibility for successful revegetation, as required by paragraph (19) above, for a period of five full years after the last year of augmented seeding, fertilizing, irrigation, or other work in order to assure compliance with paragraph (19) above, except in those areas or regions of the country where the annual average precipitation is twenty-six inches or less, then the operator’s assumption of responsibility and liability will extend for a period of ten full years after the last year of augmented seeding, fertilizing, irrigation, or other work: Provided, That when the regulatory authority approves a long-term intensive agricultural postmining land use, the applicable five- or ten-year period of responsibility for revegetation shall commence at the date of initial planting for such long-term intensive agricultural postmining land use: Provided further, That when the regulatory authority issues a written finding approving a long-term, intensive, agricultural postmining land use as part of the mining and reclamation plan, the authority may grant exception to the provisions of paragraph (19) above; | |||
| (20)(B) | (B) | (B) | ||
| on lands eligible for remining assume the responsibility for successful revegetation for a period of two full years after the last year of augmented seeding, fertilizing, irrigation, or other work in order to assure compliance with the applicable standards, except in those areas or regions of the country where the annual average precipitation is twenty-six inches or less, then the operator’s assumption of responsibility and liability will be extended for a period of five full years after the last year of augmented seeding, fertilizing, irrigation, or other work in order to assure compliance with the applicable standards.4 | on lands eligible for remining assume the responsibility for successful revegetation for a period of two full years after the last year of augmented seeding, fertilizing, irrigation, or other work in order to assure compliance with the applicable standards, except in those areas or regions of the country where the annual average precipitation is twenty-six inches or less, then the operator’s assumption of responsibility and liability will be extended for a period of five full years after the last year of augmented seeding, fertilizing, irrigation, or other work in order to assure compliance with the applicable standards.4 | |||
| (20)(C) | (C) [inserted: ] | |||
| [inserted: in no instance shall the operator be allowed more than 1 year greater than the time periods set forth in this subsection to achieve successful revegetation;] | ||||
| (21) | (21) | (21) | ||
| protect offsite areas from slides or damage occurring during the surface coal mining and reclamation operations, and not deposit spoil material or locate any part of the operations or waste accumulations outside the permit area; | protect offsite areas from slides or damage occurring during the surface coal mining and reclamation operations, and not deposit spoil material or locate any part of the operations or waste accumulations outside the permit area; | |||
| (22) | (22) | (22) | ||
| place all excess spoil material resulting from coal surface mining and reclamation activities in such a manner that— | place all excess spoil material resulting from coal surface mining and reclamation activities in such a manner that— | |||
§ 1265(b)–(c)
(b)(22)(A)–(H) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (b)(22)(I) | (I) | (I) | ||
| all other provisions of this chapter are met.4 | all other provisions of this chapter are met.4 | |||
| (b)(23) | (23) | (23) | ||
| meet such other criteria as are necessary to achieve reclamation in accordance with the purposes of this chapter, taking into consideration the physical, climatological, and other characteristics of the site; | meet such other criteria as are necessary to achieve reclamation in accordance with the purposes of this chapter, taking into consideration the physical, climatological, and other characteristics of the site; | |||
| (b)(24) | (24) | (24) | ||
| to the extent possible using the best technology currently available, minimize disturbances and adverse impacts of the operation on fish, wildlife, and related environmental values, and achieve enhancement of such resources where practicable; | to the extent possible using the best technology currently available, minimize disturbances and adverse impacts of the operation on fish, wildlife, and related environmental values, and achieve enhancement of such resources where practicable;[inserted: and] | |||
| (b)(25) | (25) | (25) | ||
| provide for an undisturbed natural barrier beginning at the elevation of the lowest coal seam to be mined and extending from the outslope for such distance as the regulatory authority shall determine shall be retained in place as a barrier to slides and erosion. | provide for an undisturbed natural barrier beginning at the elevation of the lowest coal seam to be mined and extending from the outslope for such distance as the regulatory authority shall determine shall be retained in place as a barrier to slides and erosion. | |||
| (c) | (c) Procedures; exception to original contour restoration requirements | (c) Procedures; exception to original contour restoration requirements |
§ 1265(c)–(d)
(c)(1)–(4) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (c)(5) | (5) | (5) | ||
| The regulatory authority shall promulgate specific regulations to govern the granting of permits in accord with the provisions of this subsection, and may impose such additional requirements as he deems to be necessary. | The regulatory authority shall promulgate specific regulations to govern the granting of permits in accord with the provisions of this subsection, and may impose such additional requirements as he deems to be necessary. | |||
| (c)(6) | (6) | (6) | ||
| All permits granted under the provisions of this subsection shall be reviewed not more than three years from the date of issuance of the permit, unless the applicant affirmatively demonstrates that the proposed development is proceeding in accordance with the terms of the approved schedule and reclamation plan. | All permits granted under the provisions of this subsection shall be reviewed not more than three years from the date of issuance of the permit, unless the applicant affirmatively demonstrates that the proposed development is proceeding in accordance with the terms of the approved schedule and reclamation plan. | |||
| (c)(7) | (7) [inserted: ] | |||
| [inserted: All backfilling and regrading to ensure proper drainage control, prevent leaching of toxic materials, eliminate highwalls, spoil piles, and depressions (unless small depressions are needed in order to retain moisture to assist revegetation or as otherwise authorized pursuant to this Act), and ensure stability, shall be completed not later than 180 days after the date of coal production as reported pursuant to section 402(c).] | ||||
| (d) | (d) Steep-slope surface coal mining standards | (d) Steep-slope surface coal mining standards | ||
| The following performance standards shall be applicable to steep-slope surface coal mining and shall be in addition to those general performance standards required by this section: Provided, however, That the provisions of this subsection (d) shall not apply to those situations in which an operator is mining on flat or gently rolling terrain, on which an occasional steep slope is encountered through which the mining operation is to proceed, leaving a plain or predominantly flat area or where an operator is in compliance with provisions of subsection (c) hereof: | The following performance standards shall be applicable to steep-slope surface coal mining and shall be in addition to those general performance standards required by this section: Provided, however, That the provisions of this subsection (d) shall not apply to those situations in which an operator is mining on flat or gently rolling terrain, on which an occasional steep slope is encountered through which the mining operation is to proceed, leaving a plain or predominantly flat area or where an operator is in compliance with provisions of subsection (c) hereof: | |||
| (d)(1) | (1) | (1) | ||
| Insure that when performing surface coal mining on steep slopes, no debris, abandoned or disabled equipment, spoil material, or waste mineral matter be placed on the downslope below the bench or mining cut: Provided, That spoil material in excess of that required for the reconstruction of the approximate original contour under the provisions of subsection (b)(3) or (d)(2) shall be permanently stored pursuant to subsection (b)(22). | Insure that when performing surface coal mining on steep slopes, no debris, abandoned or disabled equipment, spoil material, or waste mineral matter be placed on the downslope below the bench or mining cut: Provided, That spoil material in excess of that required for the reconstruction of the approximate original contour under the provisions of subsection (b)(3) or (d)(2) shall be permanently stored pursuant to subsection (b)(22). | |||
Rest of § 1265 unchanged
30 U.S.C. § 1267 Inspections and monitoring
3 changes the bill asks for here, 2 carried out
- Not carried out:
in paragraph (2), to read as follows:
(2) the regulatory authority shall— (A) require quarterly monitoring of both surface water and ground water during mining and reclamation; (B) specify those— (i) monitoring sites to record the quantity and quality of surface drainage above and below the mine site as well as in …
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: to read as follows: QCONTENT; - Carried out:
by redesignating paragraph (3) as paragraph (5); and
- Carried out:
by inserting after paragraph (2) the following:
(3) the regulatory authority shall conduct an annual assessment of the biological condition of streams to demonstrate progress with respect to restoring of the pre-mining biological condition of the stream; (4) the regulatory authority shall conduct an inspection of surface …
§ 1267(b)–(d)
Start of § 1267 to (b)(2)(C) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (b)(2)(D) | (D) | (D) | ||
| monitoring sites to record precipitation. | monitoring sites to record precipitation. | |||
| (b)(2) | The monitoring data collection and analysis required by this section shall be conducted according to standards and procedures set forth by the regulatory authority in order to assure their reliability and validity; and | The monitoring data collection and analysis required by this section shall be conducted according to standards and procedures set forth by the regulatory authority in order to assure their reliability and validity; and | ||
| (b)(3) | (3) [inserted: ] | |||
| [inserted: the regulatory authority shall conduct an annual assessment of the biological condition of streams to demonstrate progress with respect to restoring of the pre-mining biological condition of the stream;] | ||||
| (b)(4) | (4) [inserted: ] | |||
| [inserted: the regulatory authority shall conduct an inspection of surface water runoff control structures after each precipitation event that is at least as intense as a 100-year, 6-hour precipitation event; and] | ||||
| (b)(5) | [inserted: (5)] | |||
| the authorized representatives of the regulatory authority, without advance notice and upon presentation of appropriate credentials (A) shall have the right of entry to, upon, or through any surface coal mining and reclamation operations or any premises in which any records required to be maintained under paragraph (1) of this subsection are located; and (B) may at reasonable times, and without delay, have access to and copy any records, inspect any monitoring equipment or method of operation required under this chapter. | the authorized representatives of the regulatory authority, without advance notice and upon presentation of appropriate credentials (A) shall have the right of entry to, upon, or through any surface coal mining and reclamation operations or any premises in which any records required to be maintained under paragraph (1) of this subsection are located; and (B) may at reasonable times, and without delay, have access to and copy any records, inspect any monitoring equipment or method of operation required under this chapter. | |||
| (c) | (c) Inspection intervals | (c) Inspection intervals | ||
| The inspections by the regulatory authority shall (1) occur on an irregular basis averaging not less than one partial inspection per month and one complete inspection per calendar quarter for the surface coal mining and reclamation operation covered by each permit; (2) occur without prior notice to the permittee or his agents or employees except for necessary onsite meetings with the permittee; and (3) include the filing of inspection reports adequate to enforce the requirements of and to carry out the terms and purposes of this chapter. | The inspections by the regulatory authority shall (1) occur on an irregular basis averaging not less than one partial inspection per month and one complete inspection per calendar quarter for the surface coal mining and reclamation operation covered by each permit; (2) occur without prior notice to the permittee or his agents or employees except for necessary onsite meetings with the permittee; and (3) include the filing of inspection reports adequate to enforce the requirements of and to carry out the terms and purposes of this chapter. | |||
| (d) | (d) Maintenance of sign | (d) Maintenance of sign | ||
| Each permittee shall conspicuously maintain at the entrances to the surface coal mining and reclamation operations a clearly visible sign which sets forth the name, business address, and phone number of the permittee and the permit number of the surface coal mining and reclamation operations. | Each permittee shall conspicuously maintain at the entrances to the surface coal mining and reclamation operations a clearly visible sign which sets forth the name, business address, and phone number of the permittee and the permit number of the surface coal mining and reclamation operations. | |||
Rest of § 1267 unchanged
30 U.S.C. § 1269 Release of performance bonds or deposits
4 changes the bill asks for here, 4 carried out
- Carried out:
by inserting
and section 515(b)(3), or section 515(c)(7), as applicable,
afterwith his approved reclamation plan
; and - Carried out:
by striking
60
and inserting40
; - Carried out:
in paragraph (2), by inserting
and section 515(b)(19)
afterin accordance with the approved reclamation plan
; and - Carried out:
in paragraph (3), by inserting
in accordance with the approved reclamation plan and section 515(b)(20),
afterWhen the operator has completed successfully all surface coal mining and reclamation activities
.
§ 1269(c)–(e)
Start of § 1269 to (b) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (c) | (c) Requirements for release | (c) Requirements for release | ||
| The regulatory authority may release in whole or in part said bond or deposit if the authority is satisfied the reclamation covered by the bond or deposit or portion thereof has been accomplished as required by this chapter according to the following schedule: | The regulatory authority may release in whole or in part said bond or deposit if the authority is satisfied the reclamation covered by the bond or deposit or portion thereof has been accomplished as required by this chapter according to the following schedule: | |||
| (c)(1) | (1) | (1) | ||
| When the operator completes the backfilling, regrading, and drainage control of a bonded area in accordance with his approved reclamation plan, the release of | When the operator completes the backfilling, regrading, and drainage control of a bonded area in accordance with his approved reclamation plan[inserted: and section 515(b)(3)], [inserted: or section 515(c)(7), as applicable,, ]the release of [inserted: 40] per centum of the bond or collateral for the applicable permit area. | |||
| (c)(2) | (2) | (2) | ||
| After revegetation has been established on the regraded mined lands in accordance with the approved reclamation plan. When determining the amount of bond to be released after successful revegetation has been established, the regulatory authority shall retain that amount of bond for the revegetated area which would be sufficient for a third party to cover the cost of reestablishing revegetation and for the period specified for operator responsibility in section 1265 of this title of reestablishing revegetation. No part of the bond or deposit shall be released under this paragraph so long as the lands to which the release would be applicable are contributing suspended solids to streamflow or runoff outside the permit area in excess of the requirements set by section 1265(b)(10) of this title or until soil productivity for prime farm lands has returned to equivalent levels of yield as nonmined land of the same soil type in the surrounding area under equivalent management practices as determined from the soil survey performed pursuant to section 1257(b)(16) of this title. Where a silt dam is to be retained as a permanent impoundment pursuant to section 1265(b)(8) of this title, the portion of bond may be released under this paragraph so long as provisions for sound future maintenance by the operator or the landowner have been made with the regulatory authority. | After revegetation has been established on the regraded mined lands in accordance with the approved reclamation plan[inserted: and section 515(b)(19)]. When determining the amount of bond to be released after successful revegetation has been established, the regulatory authority shall retain that amount of bond for the revegetated area which would be sufficient for a third party to cover the cost of reestablishing revegetation and for the period specified for operator responsibility in section 1265 of this title of reestablishing revegetation. No part of the bond or deposit shall be released under this paragraph so long as the lands to which the release would be applicable are contributing suspended solids to streamflow or runoff outside the permit area in excess of the requirements set by section 1265(b)(10) of this title or until soil productivity for prime farm lands has returned to equivalent levels of yield as nonmined land of the same soil type in the surrounding area under equivalent management practices as determined from the soil survey performed pursuant to section 1257(b)(16) of this title. Where a silt dam is to be retained as a permanent impoundment pursuant to section 1265(b)(8) of this title, the portion of bond may be released under this paragraph so long as provisions for sound future maintenance by the operator or the landowner have been made with the regulatory authority. | |||
| (c)(3) | (3) | (3) | ||
| When the operator has completed successfully all surface coal mining and reclamation activities, the release of the remaining portion of the bond, but not before the expiration of the period specified for operator responsibility in section 1265 of this title: Provided, however, That no bond shall be fully released until all reclamation requirements of this chapter are fully met. | When the operator has completed successfully all surface coal mining and reclamation activities[inserted: in accordance with the approved reclamation plan and section 515(b)(20)],[inserted: ,] the release of the remaining portion of the bond, but not before the expiration of the period specified for operator responsibility in section 1265 of this title: Provided, however, That no bond shall be fully released until all reclamation requirements of this chapter are fully met. | |||
| (d) | (d) Notice of disapproval | (d) Notice of disapproval | ||
| If the regulatory authority disapproves the application for release of the bond or portion thereof, the authority shall notify the permittee, in writing, stating the reasons for disapproval and recommending corrective actions necessary to secure said release and allowing opportunity for a public hearing. | If the regulatory authority disapproves the application for release of the bond or portion thereof, the authority shall notify the permittee, in writing, stating the reasons for disapproval and recommending corrective actions necessary to secure said release and allowing opportunity for a public hearing. | |||
| (e) | (e) Notice to municipality | (e) Notice to municipality | ||
| When any application for total or partial bond release is filed with the regulatory authority, the regulatory authority shall notify the municipality in which a surface coal mining operation is located by certified mail at least thirty days prior to the release of all or a portion of the bond. | When any application for total or partial bond release is filed with the regulatory authority, the regulatory authority shall notify the municipality in which a surface coal mining operation is located by certified mail at least thirty days prior to the release of all or a portion of the bond. |
Rest of § 1269 unchanged