Title 49 · TransportationTransportation
Changes to 49 U.S.C. § 26106
H.R. 9036 · American High-Speed Rail Act · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
49 U.S.C. § 26106 High-speed rail corridor development
21 changes the bill asks for here, 21 carried out
- Carried out:
in subsection (a), by adding at the end the following:
In carrying out the program, the Secretary may designate high-speed rail corridors.
; - Carried out:
in paragraph (1), by striking
or Amtrak
and insertingAmtrak, or a consortium of a private entity and one or more of any of the entities listed in this paragraph
; - Carried out:
in paragraph (2), by striking the period at the end and inserting before the date of the enactment of MAP–21 (Public Law 112–141) or a corridor designated by the Secretary under subsection (a)
.
; - Carried out:
by striking paragraph (4); and
- Carried out:
by redesignating paragraphs (5) and (6) as paragraphs (4) and (5), respectively;
- Carried out:
in subclause (I), by adding
and
at the end; and - Carried out:
in subclause (II), by striking
and
at the end; - Carried out:
in subparagraph (B)(ii)(IV), by inserting
and
at the end; and - Carried out:
in subclause (II) by inserting
, including where a grant will support the plans of an Interstate Passenger Rail Commission or other entity with the goal of developing a regional passenger rail system involving 2 or more States
before the semicolon;
- Carried out:
in subclause (IV), by inserting
electrification or
afterinvolve
; - Carried out:
in subclause (V), by striking the semicolon and inserting , including as a result of transit-oriented development, connectivity between areas of high-economic development and areas with a low cost of living, or the agglomeration of effects along a passenger rail corridor
;
; - Carried out:
in subclause (VI) by striking
and
at the end; - Carried out:
by redesignating subclause (VII) as subclause (IX); and
- Carried out:
by inserting after subclause (VI) the following:
(VII) impacts associated with equity, resilience, sustainability, economic development and climate; (VIII) ability to serve an eligible place, as such term is defined in section 41731; and; and
- Carried out:
by striking
The Secretary
and inserting(A) The Secretary
; and - Carried out:
by adding at the end the following:
(B) The Secretary shall not establish mandatory spending timelines for costs and activities associated with the project.;
- Carried out:
in the heading of subsection (f), by striking
Federal share
and insertingFunding
; - Carried out:
by striking
The Federal share
and all that follows and inserting the following:(1) Federal share.— With respect to the net capital cost of a project financed under this section, the Federal share of such cost may be up to 100 percent.; and - Carried out:
by adding at the end the following new paragraph:
(2) Non-Federal share.— (A) The Secretary shall prioritize financing capital projects in high-speed rail corridors with respect to which at least 20 percent of the project net capital cost is funded through specified financial sources. (B) In this section, the term “specified …
- Carried out:
by striking subsection (g) and inserting the following:
(g) Presidential border permits.— With respect to any project that requires construction, connection, operation, or maintenance, at the international boundaries of the United States, the Secretary of State shall provide the applicant of such project with the necessary …
- Carried out:
by striking subsection (h) and inserting the following:
(h) Projects or activities for higher-Speed rail.— (1) In general.— With respect to grants awarded under this section, the Secretary may award not more than 20 percent of grants under this section for projects or activities for higher-speed rail. (2) Relevant requirements.— With …
§ 26106(a)–(d)
§ 26106. High-speed rail corridor development
(a) In General.— The Secretary of Transportation shall establish and implement a high-speed rail corridor development program.[inserted: In carrying out the program, the Secretary may designate high-speed rail corridors.]
(b) Definitions.— In this section, the following definitions apply:
(1) Applicant.— The term “applicant” means a State, a group of States, an Interstate Compact, a public agency established by one or more States and having responsibility for providing high-speed rail service, [inserted: Amtrak, ]or [struck: Amtrak][inserted: a consortium of a private entity and one or more of any of the entities listed in this paragraph].
(2) Corridor.— The term “corridor” means a corridor designated by the Secretary pursuant to section 104(d)(2) of title 23[inserted: before the date of the enactment of MAP–21 (Public Law 112–141) or a corridor designated by the Secretary under subsection (a)].
(3) Capital project.— The term “capital project” means a project or program in a State rail plan developed under chapter 227 of this title for acquiring, constructing, improving, or inspecting equipment, track, and track structures, or a facility of use in or for the primary benefit of high-speed rail service, expenses incidental to the acquisition or construction (including designing, engineering, location surveying, mapping, environmental studies, and acquiring rights-of-way), payments for the capital portions of rail trackage rights agreements, highway-rail grade crossing improvements related to high-speed rail service, mitigating environmental impacts, communication and signalization improvements, relocation assistance, acquiring replacement housing sites, and acquiring, constructing, relocating, and rehabilitating replacement housing.
[struck: (4)] [struck: High-speed rail.—] [struck: The term “high-speed rail” means intercity passenger rail service that is reasonably expected to reach speeds of at least 110 miles per hour.]
[struck: (5)] [inserted: (4)] Intercity passenger rail service.— The term “intercity passenger rail service” has the meaning given the term “intercity rail passenger transportation” in section 24102 of this title.
[struck: (6)] [inserted: (5)] State.— The term “State” means any of the 50 States or the District of Columbia.
(c) General Authority.— The Secretary may make grants under this section to an applicant to finance capital projects in high-speed rail corridors.
(d) Applications.— Each applicant seeking to receive a grant under this section to develop a high-speed rail corridor shall submit to the Secretary an application in such form and in accordance with such requirements as the Secretary shall establish.
§ 26106(e)–(h)
(e) unchanged ·
(i) that are anticipated to result in significant improvements to intercity rail passenger service, including, but not limited to, consideration of the project’s—
(I) levels of estimated ridership, increased on-time performance, reduced trip time, additional service frequency to meet anticipated or existing demand, or other significant service enhancements as measured against minimum standards developed under section 207 of the Passenger Rail Investment and Improvement Act of 2008;[inserted: and]
(II) anticipated favorable impact on air or highway traffic congestion, capacity, or safety;[struck: and]
(ii) for which there is a high degree of confidence that the proposed project is feasible and will result in the anticipated benefits, as indicated by—
(I) the project’s precommencement compliance with environmental protection requirements;
(II) the readiness of the project to be commenced;
(III) the commitment of any affected host rail carrier to ensure the realization of the anticipated benefits; and
(IV) other relevant factors as determined by the Secretary;[inserted: and]
(iii) for which the level of the anticipated benefits compares favorably to the amount of Federal funding requested under this section; and
(C) give greater consideration to projects—
(i) that are anticipated to result in benefits to other modes of transportation and to the public at large, including, but not limited to, consideration of the project’s—
(I) encouragement of intermodal connectivity through provision of direct connections between train stations, airports, bus terminals, subway stations, ferry ports, and other modes of transportation;
(II) anticipated improvement of conventional intercity passenger, freight, or commuter rail operations[inserted: , including where a grant will support the plans of an Interstate Passenger Rail Commission or other entity with the goal of developing a regional passenger rail system involving 2 or more States];
(III) use of positive train control technologies;
(IV) environmental benefits, including projects that involve [inserted: electrification or ]the purchase of environmentally sensitive, fuel-efficient, and cost-effective passenger rail equipment;
(V) anticipated positive economic and employment impacts[inserted: , including as a result of transit-oriented development, connectivity between areas of high-economic development and areas with a low cost of living, or the agglomeration of effects along a passenger rail corridor];
(VI) encouragement of State and private contributions toward station development, energy and environmental efficiency, and economic benefits;[struck: and]
(VII) [inserted: impacts associated with equity, resilience, sustainability, economic development and climate;]
(VIII) [inserted: ability to serve an eligible place, as such term is defined in section 41731; and]
[struck: (VII)] [inserted: (IX)] falling under the description in section 5302(a)(1)(G) 1 of this title as defined to support intercity passenger rail service; and
(ii) that incorporate equitable financial participation in the project’s financing, including, but not limited to, consideration of—
(I) donated property interests or services;
(II) financial contributions by intercity passenger, freight, and commuter rail carriers commensurate with the benefit expected to their operations; and
(III) financial commitments from host railroads, non-Federal governmental entities, non-governmental entities, and others.
(3) Grant conditions.—
(A) [inserted: The Secretary shall require each recipient of a grant under this chapter to comply with the grant requirements of section 22905.]
(B) [inserted: The Secretary shall not establish mandatory spending timelines for costs and activities associated with the project.]
[struck: The Secretary shall require each recipient of a grant under this chapter to comply with the grant requirements of section 22905.]
(4) State rail plans.— State rail plans completed before the date of enactment of the Passenger Rail Investment and Improvement Act of 2008 that substantially meet the requirements of chapter 227 of this title, as determined by the Secretary pursuant to section 22506 1 of this title, shall be deemed by the Secretary to have met the requirements of paragraph (2)(A)(i) of this subsection.
(f) [struck: Federal Share][inserted: Funding].— [inserted: ]
(1) [inserted: Federal share.—] [inserted: With respect to the net capital cost of a project financed under this section, the Federal share of such cost may be up to 100 percent.]
(2) [inserted: Non-Federal share.—]
(A) [inserted: The Secretary shall prioritize financing capital projects in high-speed rail corridors with respect to which at least 20 percent of the project net capital cost is funded through specified financial sources.]
(B) [inserted: In this section, the term “specified financial source” means—]
(i) [inserted: the Railroad Rehabilitation and Improvement Finance program under chapter V of the Railroad Revitalization and Regulatory Reform Act of 1976 (45 U.S.C. 821 et seq.);]
(ii) [inserted: the transportation infrastructure finance and innovation program in chapter 6 of title 23;]
(iii) [inserted: funding provided by the government of a country that is adjacent to the international border of the United States through which the proposed corridor will cross;]
(iv) [inserted: a State, local, or private source; or]
(v) [inserted: any combination of the sources described in clauses (i) through (v).]
(C) [inserted: For any funds derived from the programs described in clauses (i) or (ii) of subparagraph (B) that are used to finance costs associated with capital projects in high-speed rail corridors, such funds shall be repaid from State, local, or private sources.]
[struck: The Federal share of the cost of a project financed under this section shall not exceed 80 percent of the project net capital cost.]
(g) [struck: Issuance][inserted: Presidential] [struck: of][inserted: border] [struck: Regulations][inserted: permits].— [struck: Within][inserted: With] [struck: 1][inserted: respect] [struck: year][inserted: to] [struck: after][inserted: any] [inserted: project that requires construction, connection, operation, or maintenance, at ]the [struck: date][inserted: international] [inserted: boundaries ]of [struck: enactment][inserted: the] [inserted: United States, the Secretary ]of [struck: this][inserted: State] [struck: section][inserted: shall provide the applicant of such project with the necessary Presidential permits required for such project], [inserted: unless ]the Secretary [struck: shall][inserted: of] [struck: issue][inserted: State] [struck: regulations][inserted: determines] [struck: to][inserted: that] [struck: carry][inserted: the] [struck: out][inserted: provision] [struck: this][inserted: of] [struck: section][inserted: such permit would not be in the interest of national security].
(h) [struck: Authorization][inserted: Projects] [struck: of][inserted: or] [struck: Appropriations][inserted: activities for higher-Speed rail].— [struck: There are authorized to be appropriated to the Secretary to carry out this section—]
(1) [inserted: In general.—] [struck: $150][inserted: With respect to grants awarded under this section],[struck: 000,000] [inserted: the Secretary may award not more than 20 percent of grants under this section ]for [struck: fiscal][inserted: projects] [struck: year][inserted: or] [struck: 2009;][inserted: activities for higher-speed rail.]
(2) [inserted: Relevant requirements.—] [struck: $300][inserted: With respect to grants under paragraph (1)],[struck: 000,000] [inserted: the Secretary may apply requirements ]for [struck: fiscal][inserted: high-speed] [struck: year][inserted: rail] [struck: 2010;][inserted: to projects or activities for higher-speed rail, where applicable.]
[struck: (3)] [struck: $350,000,000 for fiscal year 2011;]
[struck: (4)] [struck: $350,000,000 for fiscal year 2012; and]
[struck: (5)] [struck: $350,000,000 for fiscal year 2013.]