H.R. 9332 · Load Forecasting Enhancement Act ·

Passed the House · step 3 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

16 U.S.C. § 2621 Consideration and determination respecting certain ratemaking standards

+4 −0Shown
More for 16 U.S.C. § 2621
Read § 2621Only this section
2 changes the bill asks for here, 2 carried out
  1. Carried out:

    in subsection (d), by adding at the end the following:(22) Electric load forecasting.— The procedures used to forecast electric loads shall incorporate the recommendations published in the report of the Federal Energy Regulatory Commission pursuant to the Load Forecasting Enhancement Act.; and

  2. Carried out:

    by adding at the end the following:(e) Consideration and determination by nonregulated electric utilities.— The requirement for consideration and determination referred to in the first sentence of subsection (a) shall not apply to a nonregulated electric utility with respect to the standard established by paragraph (22) of subsection (d)..

§ 2621(d)–(e)

Start of § 2621 to (d)(21)(B) unchanged ·

(C) accelerate third-party investment in electric vehicle charging for light-, medium-, and heavy-duty vehicles; and

(D) appropriately recover the marginal costs of delivering electricity to electric vehicles and electric vehicle charging infrastructure.

(22) [inserted: Electric load forecasting.—] [inserted: The procedures used to forecast electric loads shall incorporate the recommendations published in the report of the Federal Energy Regulatory Commission pursuant to the Load Forecasting Enhancement Act.]

(e) [inserted: Consideration and determination by nonregulated electric utilities.—] [inserted: The requirement for consideration and determination referred to in the first sentence of subsection (a) shall not apply to a nonregulated electric utility with respect to the standard established by paragraph (22) of subsection (d).]

16 U.S.C. § 2622 Obligations to consider and determine

+14 −13 of 4 shown
More for 16 U.S.C. § 2622
Read § 2622Only this section
4 changes the bill asks for here, 3 carried out
  1. Carried out:

    in subsection (b), by adding at the end the following:(9) (A) Not later than 1 year after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) shall commence consideration under section 111, or set a hearing date for …

  2. Carried out:

    by striking subsection (b)(2) and inserting subsection (b); and

  3. Not carried out:

    by inserting In the case of the standard established by paragraph (22) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (22). after paragraph (21).; and

    “paragraph (21).” isn't in § 2622(c) in the Code as we have it. The law may have changed since the bill was drafted.

    Technical detail“paragraph (21).” not found in /us/usc/t16/s2622/c
  4. Carried out:

    by adding at the end the following:(i) Other prior State actions.— Subsections (b) and (c) shall not apply to the standard established by paragraph (22) of section 111(d) in the case of any electric utility in a State if, before the date of enactment of this subsection— (1) the State has implemented for the …

§ 2622(b)–(d)

Start of § 2622 to (b)(8) unchanged ·

(A) Not later than 1 year after November 15, 2021, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) and each nonregulated utility shall commence consideration under section 2621 of this title, or set a hearing date for consideration, with respect to the standard established by paragraph (21) of section 2621(d) of this title.

(B) Not later than 2 years after November 15, 2021, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority), and each nonregulated electric utility shall complete the consideration and make the determination under section 2621 of this title with respect to the standard established by paragraph (21) of section 2621(d) of this title.

(9)

(A) [inserted: Not later than 1 year after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) shall commence consideration under section 111, or set a hearing date for consideration, with respect to the standard established by paragraph (22) of section 111(d).]

(B) [inserted: Not later than 2 years after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) shall complete the consideration and make the determination under section 111 with respect to the standard established by paragraph (22) of section 111(d).]

(c) Failure to comply Each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall undertake the consideration, and make the determination, referred to in section 2621 of this title with respect to each standard established by section 2621(d) of this title in the first rate proceeding commenced after the date three years after November 9, 1978, respecting the rates of such utility if such State regulatory authority or nonregulated electric utility has not, before such date, complied with subsection (b)[struck: (2)] with respect to such standard. In the case of each standard established by paragraphs (11) through (13) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (14) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (15) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standards established by paragraphs (16) through (19) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to December 19, 2007. In the case of the standard established by paragraph (20) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to November 15, 2021. In the case of the standard established by paragraph (21) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to November 15, 2021.

(d) Prior State actions relating to standard under certain paragraphs of section 2621(d) Subsections (b) and (c) of this section shall not apply to the standards established by paragraphs (11) through (13) and paragraphs (16) through (19) of section 2621(d) of this title in the case of any electric utility in a State if, before August 8, 2005—

(1) the State has implemented for such utility the standard concerned (or a comparable standard);

§ 2622(h)–(i)

(d)(2)–(h)(1) unchanged ·

(2) the State regulatory authority for the State or the relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard (or a comparable standard) for the electric utility; or

(3) the State legislature has voted on the implementation of the standard (or a comparable standard) for the electric utility during the 3-year period ending on November 15, 2021.

(i) [inserted: Other prior State actions.—] [inserted: Subsections (b) and (c) shall not apply to the standard established by paragraph (22) of section 111(d) in the case of any electric utility in a State if, before the date of enactment of this subsection—]

(1) [inserted: the State has implemented for the electric utility the standard (or a comparable standard);]

(2) [inserted: the State regulatory authority for the State has conducted a proceeding to consider implementation of the standard (or a comparable standard) for the electric utility; or]

(3) [inserted: the State legislature has voted on the implementation of the standard (or a comparable standard) for the electric utility during the 3-year period ending on that date of enactment.]

42 U.S.C. § 6322 State energy conservation plans

+4 −2Shown
More for 42 U.S.C. § 6322
Read § 6322Only this section
3 changes the bill asks for here, 3 carried out
  1. Carried out:

    in paragraph (6), by striking and at the end;

  2. Carried out:

    in paragraph (7), by striking the period at the end and inserting ; and; and

  3. Carried out:

    by adding at the end the following:(8) procedures and programs to improve the accuracy, oversight, and transparency to stakeholders of the forecasting of electric loads by electric utilities (as such term is defined in section 3 of the Federal Power Act (16 U.S.C. 796))..

§ 6322(c)–(d)

Start of § 6322 to (c)(4) unchanged ·

(5) a traffic law or regulation which, to the maximum extent practicable consistent with safety, permits the operator of a motor vehicle to turn such vehicle right at a red stop light after stopping and to turn such vehicle left from a one-way street onto a one-way street at a red light after stopping;

(6) procedures for ensuring effective coordination among various local, State, and Federal energy conservation programs within the State, including any program administered within the Office of Technical and Financial Assistance of the Department of Energy and the Low Income Home Energy Assistance Program administered by the Department of Health and Human Services;[struck: and]

(7) the mandatory conduct of activities to support transmission and distribution planning, including—

(A) support for local governments and Indian Tribes;

(B) feasibility studies for transmission line routes and alternatives;

(C) preparation of necessary project design and permits; and

(D) outreach to affected stakeholders[struck: .][inserted: ; and]

(8) [inserted: procedures and programs to improve the accuracy, oversight, and transparency to stakeholders of the forecasting of electric loads by electric utilities (as such term is defined in section 3 of the Federal Power Act (16 U.S.C. 796)).]

(d) Optional features of plans Each proposed State energy conservation plan may include—

(1) restrictions governing the hours and conditions of operation of public buildings (except buildings owned or leased by the United States);

Rest of § 6322 unchanged ·

16 U.S.C. § 2634 Prior and pending proceedings

Couldn't place the change
More for 16 U.S.C. § 2634
Read § 2634Only this section

The bill's words for this section

  1. Not carried out:

    Section 124 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2634) is amended by inserting In the case of the standard established by paragraph (22) of section 111(d), the reference contained in this section to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of paragraph (22). after paragraph (21)..

    “paragraph (21).” isn't in § 2634 in the Code as we have it. The law may have changed since the bill was drafted.

    Technical detail“paragraph (21).” not found in /us/usc/t16/s2634

§ 2634

§ 2634. Prior and pending proceedings

For purposes of subchapters I and II, and this subchapter, proceedings commenced by State regulatory authorities (with respect to electric utilities for which it has ratemaking authority) and nonregulated electric utilities before November 9, 1978, and actions taken before such date in such proceedings shall be treated as complying with the requirements of subchapters I and II, and this subchapter if such proceedings and actions substantially conform to such requirements. For purposes of subchapters I and II, and this subchapter, any such proceeding or action commenced before November 9, 1978, but not completed before such date, shall comply with the requirements of subchapters I and II, and this subchapter, to the maximum extent practicable, with respect to so much of such proceeding or action as takes place after such date, except as otherwise provided in section 2631(c) of this title. In the case of each standard established by paragraphs (11) through (13) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (14) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of each standard established by paragraph (15) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (20) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to November 15, 2021. In the case of the standard established by paragraph (21) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to November 15, 2021.