Title 33 · Navigation and Navigable Waters
Changes to 33 U.S.C. § 2282g
H.R. 9497 · Water Resources Development Act of 2026 · Engrossed The official text as one chamber (House or Senate) passed it.
Passed the House · step 3 of 5
33 U.S.C. § 2282g Scope of feasibility studies
5 changes the bill asks for here, 4 carried out
- Carried out:
in the matter preceding paragraph (1), by striking
shall formulate
and insertingshall include in the study any effects within the geographic scope of the study of, and formulate
; - Carried out:
in paragraph (4), by striking
frequency
and insertingfrequency, including flooding associated with stormwater that flows at a rate of less than 800 cubic feet per second for the 10-percent flood
; - Carried out:
by redesignating paragraphs (1) through (10) as clauses (A) through (J), respectively, and adjusting the margins accordingly;
- Not carried out:
in the matter preceding subparagraph (A), as so redesignated, by striking In carrying out and inserting the following: (1) In general.— In carrying out; and
§ 2282g(a) already has provisions of its own, so its opening words can't simply become the first of them.
Technical detail
/us/usc/t33/s2282g/a has provisions already, so its words can't become the first - Carried out:
by adding at the end the following:
(2) Recommendation of comprehensive flood risk reduction alternative.— If the Secretary determines that a project alternative identified by the non-Federal interest pursuant to paragraph (1) is feasible, the Secretary shall incorporate such alternative in the recommended plan …
§ 2282g(a)–(b)
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| § 2282g. Scope of feasibility studies | § 2282g. Scope of feasibility studies | |||
| (a) | (a) Flood risk management or hurricane and storm damage risk reduction | (a) Flood risk management or hurricane and storm damage risk reduction | ||
| In carrying out a feasibility study for a project for flood risk management or hurricane and storm damage risk reduction, the Secretary, at the request of the non-Federal interest for the study, shall formulate alternatives to maximize the net benefits from the reduction of the comprehensive flood risk within the geographic scope of the study from the isolated and compound effects of— | In carrying out a feasibility study for a project for flood risk management or hurricane and storm damage risk reduction, the Secretary, at the request of the non-Federal interest for the study, shall [inserted: include in the study any effects within the geographic scope of the study of, and ]formulate alternatives to maximize the net benefits from the reduction of the comprehensive flood risk within the geographic scope of the study from the isolated and compound effects of— | |||
| (a)(A) | [inserted: (A)] | |||
| a riverine discharge of any magnitude or frequency; | a riverine discharge of any magnitude or frequency; | |||
| (a)(B) | [inserted: (B)] | |||
| inundation, wave attack, and erosion coinciding with a hurricane or coastal storm; | inundation, wave attack, and erosion coinciding with a hurricane or coastal storm; | |||
| (a)(C) | [inserted: (C)] | |||
| flooding associated with tidally influenced portions of rivers, bays, and estuaries that are hydrologically connected to the coastal water body; | flooding associated with tidally influenced portions of rivers, bays, and estuaries that are hydrologically connected to the coastal water body; | |||
| (a)(D) | [inserted: (D)] | |||
| a rainfall event of any magnitude or frequency; | a rainfall event of any magnitude or frequency[inserted: , including flooding associated with stormwater that flows at a rate of less than 800 cubic feet per second for the 10-percent flood]; | |||
| (a)(E) | [inserted: (E)] | |||
| a tide of any magnitude or frequency; | a tide of any magnitude or frequency; | |||
| (a)(F) | [inserted: (F)] | |||
| seasonal variation in water levels; | seasonal variation in water levels; | |||
| (a)(G) | [inserted: (G)] | |||
| groundwater emergence; | groundwater emergence; | |||
| (a)(H) | [inserted: (H)] | |||
| sea level rise; | sea level rise; | |||
| (a)(I) | [inserted: (I)] | |||
| subsidence; or | subsidence; or | |||
| (a)(J) | [inserted: (J)] | |||
| any other driver of flood risk affecting the area within the geographic scope of the study. | any other driver of flood risk affecting the area within the geographic scope of the study. | |||
| (a)(2) | (2) [inserted: Recommendation of comprehensive flood risk reduction alternative.—] | |||
| [inserted: If the Secretary determines that a project alternative identified by the non-Federal interest pursuant to paragraph (1) is feasible, the Secretary shall incorporate such alternative in the recommended plan for the project as a project feature the costs of which are shared as construction.] | ||||
| (b) | (b) Water supply, water conservation, and drought risk reduction | (b) Water supply, water conservation, and drought risk reduction | ||
| In carrying out a feasibility study for any purpose, the Secretary, at the request of the non-Federal interest for the study, shall formulate alternatives— | In carrying out a feasibility study for any purpose, the Secretary, at the request of the non-Federal interest for the study, shall formulate alternatives— | |||
| (b)(1) | (1) | (1) | ||
| to maximize combined net benefits for the primary purpose of the study and for the purposes of water supply or water conservation (including the use of water supply conservation measures described in section 1116 of the Water Resources Development Act of 2016 (130 Stat. 1639)); or | to maximize combined net benefits for the primary purpose of the study and for the purposes of water supply or water conservation (including the use of water supply conservation measures described in section 1116 of the Water Resources Development Act of 2016 (130 Stat. 1639)); or | |||
Rest of § 2282g unchanged