Skip to content
The People's CodeSearch
Menu

Title 33 · Navigation and Navigable Waters

Changes to 33 U.S.C. § 2283

H.R. 9497 · Water Resources Development Act of 2026 ·

Passed the House · step 3 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

33 U.S.C. § 2283 Fish and wildlife mitigation

+30 −5Shown
More for 33 U.S.C. § 2283
Read § 2283
7 changes the bill asks for here, 7 carried out
  1. Carried out:

    in paragraph (1), by striking shall not submit and all that follows through unless such report contains and inserting may not approve any proposal related to a water resources project unless the Secretary has prepared a report relating to the project that contains;

  2. Carried out:

    by striking The Secretary and inserting the following: (A) In general.— The Secretary; and

  3. Carried out:

    by adding at the end the following:(B) Identification.— The Secretary shall consult with the non-Federal interest for a water resources project, and other stakeholders, to the maximum extent practicable— (i) to identify mitigation implementation practices or accepted assessment methodologies used in the region of …

  4. Carried out:

    in paragraph (3)(B)(iv)(I), by inserting or a description of the requirements for a third-party mitigation instrument that would be developed in the case that a contract for future delivery of credits will be used after to be used;

  5. Carried out:

    in clause (i), by inserting , for immediate delivery or future delivery to be identified in the mitigation instrument after banks; and

  6. Carried out:

    in clause (ii), by inserting , for immediate delivery or future delivery to be identified in the mitigation instrument after programs; and

  7. Carried out:

    by adding at the end the following:(l) Separable elements.— Mitigation of fish and wildlife losses required under this section that is provided in the form of credit shall be considered a separable element of a project without requiring further evaluation. (m) Transparency.— The Secretary shall ensure that— (1) …

§ 2283(c)–(d)

Start of § 2283 to (b)(2) unchanged ·

(c) Allocation of mitigation costs Costs incurred after November 17, 1986, including lands, easements, rights-of-way, and relocations, for implementation and operation, maintenance, and rehabilitation to mitigate damages to fish and wildlife shall be allocated among authorized project purposes in accordance with applicable cost allocation procedures, and shall be subject to cost sharing or reimbursement to the same extent as such other project costs are shared or reimbursed, except that when such costs are covered by contracts entered into prior to November 17, 1986, such costs shall not be recovered without the consent of the non-Federal interests or until such contracts are complied with or renegotiated.

(d) Mitigation plans as part of project proposals

(1) In general After November 17, 1986, the Secretary [struck: shall][inserted: may] not [struck: submit][inserted: approve] any proposal [struck: for][inserted: related] [struck: the][inserted: to] [struck: authorization][inserted: a] [struck: of any ]water resources project [struck: to][inserted: unless] [struck: Congress][inserted: the] [struck: in][inserted: Secretary] [struck: any][inserted: has] [struck: report,][inserted: prepared] [struck: and][inserted: a] [struck: shall][inserted: report] [struck: not][inserted: relating] [struck: select][inserted: to] [struck: a][inserted: the] project [struck: alternative][inserted: that] [struck: in any report, unless such report ]contains (A) a recommendation with a specific plan to mitigate for damages to ecological resources, including terrestrial and aquatic resources, and fish and wildlife losses created by such project, or (B) a determination by the Secretary that such project will have negligible adverse impact on ecological resources and fish and wildlife without the implementation of mitigation measures. Specific mitigation plans shall ensure that impacts to bottomland hardwood forests are mitigated in-kind, and other habitat types are mitigated to not less than in-kind conditions, to the extent possible. If the Secretary determines that mitigation to in-kind conditions is not possible, the Secretary shall identify in the report the basis for that determination and the mitigation measures that will be implemented to meet the requirements of this section and the goals of section 2317(a)(1) of this title. In carrying out this subsection, the Secretary shall consult with appropriate Federal and non-Federal agencies.

(2) Selection and design of mitigation projects

(A) [inserted: In general.—] [inserted: The Secretary shall select and design mitigation projects using a watershed approach to reflect contemporary understanding of the science of mitigating the adverse environmental impacts of water resources projects.]

(B) [inserted: Identification.—] [inserted: The Secretary shall consult with the non-Federal interest for a water resources project, and other stakeholders, to the maximum extent practicable—]

(i) [inserted: to identify mitigation implementation practices or accepted assessment methodologies used in the region of the water resources project and incorporate such practices and methodologies into the mitigation plan for such project; and]

(ii) [inserted: to identify projects that have not been constructed, or concepts described in mitigation plans for other water resources projects, that may be used to meet the restoration or mitigation needs of the water resources project.]

[struck: The Secretary shall select and design mitigation projects using a watershed approach to reflect contemporary understanding of the science of mitigating the adverse environmental impacts of water resources projects.]

(3) Mitigation requirements

(A) In general To mitigate losses to flood damage reduction capabilities and fish and wildlife resulting from a water resources project, the Secretary shall ensure that the mitigation plan for each water resources project complies with, at a minimum, the mitigation standards and policies established pursuant to the regulatory programs administered by the Secretary.

§ 2283(d)(3)(B)Inclusions(iv)–(v)

(d)(3)(B) unchanged ·

(iv) for projects where mitigation will be carried out through a third party mitigation arrangement in accordance with subsection (i)—

(I) a description of the third party mitigation instrument to be used[inserted: or a description of the requirements for a third-party mitigation instrument that would be developed in the case that a contract for future delivery of credits will be used]; and

(II) the basis for a determination that the mitigation instrument can meet the mitigation requirements for the project;

(v) a description of—

§ 2283(i)Third-party mitigation arrangements(1)–(2)

(d)(3)(B)(v)(I)–(i)(1) unchanged ·

(A) participation in mitigation banking or other third-party mitigation arrangements, such as—

(i) the purchase of credits from commercial or State, regional, or local agency-sponsored mitigation banks[inserted: , for immediate delivery or future delivery to be identified in the mitigation instrument]; and

(ii) the purchase of credits from in-lieu fee mitigation programs[inserted: , for immediate delivery or future delivery to be identified in the mitigation instrument]; and

(B) contributions to statewide and regional efforts to conserve, restore, enhance, and create natural habitats and wetlands if the Secretary determines that the contributions will ensure that the mitigation requirements of this section and the goals of section 2317(a)(1) of this title will be met.

(2) Inclusion of other activities The banks, programs, and efforts described in paragraph (1) include any banks, programs, and efforts developed in accordance with applicable law (including regulations).

§ 2283(j)–(n)

(i)(3)–(j)(1) unchanged ·

(2) Notification Prior to the expenditure of any funds for a project pursuant to paragraph (1), the Secretary shall notify the Committee on Appropriations and the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Appropriations and the Committee on Environment and Public Works of the Senate.

(k) Measures The Secretary shall consult with interested members of the public, the Director of the United States Fish and Wildlife Service, the Assistant Administrator for Fisheries of the National Oceanic and Atmospheric Administration, States, including State fish and game departments, and interested local governments to identify standard measures under subsection (h)(6)(C) that reflect the best available scientific information for evaluating habitat connectivity.

(l) [inserted: Separable elements.—] [inserted: Mitigation of fish and wildlife losses required under this section that is provided in the form of credit shall be considered a separable element of a project without requiring further evaluation.]

(m) [inserted: Transparency.—] [inserted: The Secretary shall ensure that—]

(1) [inserted: the mitigation requirements for each water resources project—]

(A) [inserted: are made publicly available (including on a publicly available website of the headquarters of the Corps of Engineers); and]

(B) [inserted: include the location of the project, the anticipated schedule for mitigation, the type of mitigation required, the amount of mitigation required, and the remaining mitigation needs;]

(2) [inserted: the mitigation plan for such project is made publicly available, as applicable;]

(3) [inserted: the information described in paragraph (1) is updated regularly; and]

(4) [inserted: carrying out the requirements of this subsection with respect to each water resources project is considered a project expense.]

(n) [inserted: Coordination.—] [inserted: To the maximum extent practicable, the Secretary shall ensure that the project delivery team and regulatory team of the Corps of Engineers work in coordination to successfully carry out mitigation efforts.]

Step through the changes