Title 33 · Navigation and Navigable Waters

Changes to 33 U.S.C. § 408

H.R. 9497 · Water Resources Development Act of 2026 ·

Passed the House · step 3 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

33 U.S.C. § 408 Taking possession of, use of, or injury to harbor or river improvements

+67 −1Shown
More for 33 U.S.C. § 408
Read § 408
2 changes the bill asks for here, 2 carried out
  1. Carried out:

    by striking It shall not be lawful and inserting the following: (1) In general.— It shall not be lawful; and

  2. Carried out:

    by adding at the end the following:(2) Categorical permissions.— (A) In general.— The Secretary shall, by rule, establish categorical permissions for any category of activities for which an application for permission under paragraph (1) may be submitted. (B) Scope.— In establishing categorical permissions under …

§ 408(a)–(b)

§ 408. Taking possession of, use of, or injury to harbor or river improvements

(a) Prohibitions and permissions

(1) [inserted: In general.—] [inserted: It shall not be lawful for any person or persons to take possession of or make use of for any purpose, or build upon, alter, deface, destroy, move, injure, obstruct by fastening vessels thereto or otherwise, or in any manner whatever impair the usefulness of any sea wall, bulkhead, jetty, dike, levee, wharf, pier, or other work built by the United States, or any piece of plant, floating or otherwise, used in the construction of such work under the control of the United States, in whole or in part, for the preservation and improvement of any of its navigable waters or to prevent floods, or as boundary marks, tide gauges, surveying stations, buoys, or other established marks, nor remove for ballast or other purposes any stone or other material composing such works: Provided, That the Secretary of the Army may, on the recommendation of the Chief of Engineers, grant permission for the temporary occupation or use of any of the aforementioned public works when in his judgment such occupation or use will not be injurious to the public interest: Provided further, That the Secretary may, on the recommendation of the Chief of Engineers, grant permission for the alteration or permanent occupation or use of any of the aforementioned public works when in the judgment of the Secretary such occupation or use will not be injurious to the public interest and will not impair the usefulness of such work.]

(2) [inserted: Categorical permissions.—]

(A) [inserted: In general.—] [inserted: The Secretary shall, by rule, establish categorical permissions for any category of activities for which an application for permission under paragraph (1) may be submitted.]

(B) [inserted: Scope.—] [inserted: In establishing categorical permissions under subparagraph (A), the Secretary shall consider the following:]

(i) [inserted: The type and similarity of activities to be included in any specific category.]

(ii) [inserted: The geographic area to which the categorical permission will apply.]

(iii) [inserted: The type and similarity of the public works with respect to which the categorical permission will apply.]

(iv) [inserted: The effects of the activities to be included in a category on the applicable public works and on environmental and cultural resources.]

(v) [inserted: Any additional Federal regulatory requirements that apply to the activities to be included in a category.]

(vi) [inserted: An appropriate period of validity for the categorical permission.]

(C) [inserted: Requirement.—] [inserted: The Secretary may only establish a categorical permission under this subsection that the Secretary determines will apply to a category of activities that—]

(i) [inserted: are similar in nature to activities for which applications for permission are regularly submitted under this section;]

(ii) [inserted: will cause only minimal adverse environmental effects when carried out separately; and]

(iii) [inserted: will cause only minimal cumulative adverse environmental effects.]

(D) [inserted: Public input.—]

(i) [inserted: Scoping process.—] [inserted: In establishing categorical permissions under this paragraph, the Secretary shall solicit input from non-Federal interests, including landowners, hydropower operators, and resource agencies.]

(ii) [inserted: Comment period.—] [inserted: The Secretary shall make all draft categorical permissions, including any associated analyses and other documentation, available for public review and comment for not less than 30 days.]

(E) [inserted: Transparency.—] [inserted: The Secretary shall publish all categorical permissions established under this paragraph on an appropriate website of the Corps of Engineers, including, for each categorical permission, identification of—]

(i) [inserted: the types of activities to which the categorical permission applies;]

(ii) [inserted: any specific circumstances that, if present, would cause the categorical permission to not apply to an activity of a type identified under clause (i);]

(iii) [inserted: the geographic area to which the categorical permission applies;]

(iv) [inserted: the types of public works with respect to which the categorical permission applies; and]

(v) [inserted: the period for which the categorical permission is valid.]

(F) [inserted: Incorporation into application process.—]

(i) [inserted: Identification in request.—] [inserted: A non-Federal entity may identify in an application for permission under this subsection any categorical permission that may apply to the activity for which the permission is requested.]

(ii) [inserted: Inclusion in completeness determination.—] [inserted: In informing a non-Federal entity whether an application for permission under this subsection is complete under subsection (d)(1), the Secretary shall include an assessment of whether a categorical permission will apply to the activity for which permission is requested, including an evaluation of the applicability of—]

(I) [inserted: any categorical permission identified by the non-Federal entity in the application; and]

(II) [inserted: any other categorical permission the Secretary determines appropriate.]

(G) [inserted: Limitations.—] [inserted: Nothing in this paragraph affects—]

(i) [inserted: the authority of the Secretary to grant or deny permission under this section; or]

(ii) [inserted: any obligation to comply with the provisions of any Federal or State law, including—]

(I) [inserted: the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);]

(II) [inserted: the Federal Water Pollution Control Act (33 U.S.C. 1251 et seq.); and]

(III) [inserted: the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.).]

(H) [inserted: Deadline for proposed rule.—] [inserted: Not later than 180 days after the date of enactment of the Water Resources Development Act of 2026, the Secretary shall publish a proposed rule establishing categorical permissions under this paragraph.]

[struck: It shall not be lawful for any person or persons to take possession of or make use of for any purpose, or build upon, alter, deface, destroy, move, injure, obstruct by fastening vessels thereto or otherwise, or in any manner whatever impair the usefulness of any sea wall, bulkhead, jetty, dike, levee, wharf, pier, or other work built by the United States, or any piece of plant, floating or otherwise, used in the construction of such work under the control of the United States, in whole or in part, for the preservation and improvement of any of its navigable waters or to prevent floods, or as boundary marks, tide gauges, surveying stations, buoys, or other established marks, nor remove for ballast or other purposes any stone or other material composing such works: Provided, That the Secretary of the Army may, on the recommendation of the Chief of Engineers, grant permission for the temporary occupation or use of any of the aforementioned public works when in his judgment such occupation or use will not be injurious to the public interest: Provided further, That the Secretary may, on the recommendation of the Chief of Engineers, grant permission for the alteration or permanent occupation or use of any of the aforementioned public works when in the judgment of the Secretary such occupation or use will not be injurious to the public interest and will not impair the usefulness of such work.]

(b) Concurrent review

(1) NEPA review

(A) In general In any case in which an activity subject to this section requires a review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), review and approval of the activity under this section shall, to the maximum extent practicable, occur concurrently with any review and decisions made under that Act.

Rest of § 408 unchanged ·