Title 16 · ConservationParks and public lands
Changes to 16 U.S.C. § 2621
H.R. 9655 · Fair Allocation of Infrastructure Responsibility for Data Act · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
FAIR Data Act
In committee · step 2 of 5
16 U.S.C. § 2621 Consideration and determination respecting certain ratemaking standards
2 changes the bill asks for here, 2 carried out
- Carried out:
Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following:
(22) Costs associated with covered data centers.— (A) Cost recovery relating to covered data centers.— No covered utility may recover from residential or small business electric consumers, including through rates charged by such covered utility for providing electric service, …
- Carried out:
Section 111(a) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(a)) is amended by striking
Each State
and insertingExcept as otherwise provided in this section, each State
.
§ 2621(a)–(b)
| Where | Mark | Text |
|---|---|---|
| § 2621. Consideration and determination respecting certain ratemaking standards | ||
| (a) | (a) Consideration and determination | |
| [inserted: Except] [inserted: as otherwise provided in this section, each ]State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall consider each standard established by subsection (d) and make a determination concerning whether or not it is appropriate to implement such standard to carry out the purposes of this chapter. For purposes of such consideration and determination in accordance with subsections (b) and (c), and for purposes of any review of such consideration and determination in any court in accordance with section 2633 of this title, the purposes of this chapter supplement otherwise applicable State law. Nothing in this subsection prohibits any State regulatory authority or nonregulated electric utility from making any determination that it is not appropriate to implement any such standard, pursuant to its authority under otherwise applicable State law. | ||
| (b) | (b) Procedural requirements for consideration and determination | |
| (b)(1) | (1) | |
| The consideration referred to in subsection (a) shall be made after public notice and hearing. The determination referred to in subsection (a) shall be— |
§ 2621(d)Establishment(21)–(22)
(b)(1)(A)–(d)(21)(B) unchanged
| Where | Mark | Text |
|---|---|---|
| (21)(C) | (C) | |
| accelerate third-party investment in electric vehicle charging for light-, medium-, and heavy-duty vehicles; and | ||
| (21)(D) | (D) | |
| appropriately recover the marginal costs of delivering electricity to electric vehicles and electric vehicle charging infrastructure. | ||
| (22) | (22) [inserted: Costs associated with covered data centers.—] | |
| (22)(A) | (A) [inserted: Cost recovery relating to covered data centers.—] | |
| [inserted: No covered utility may recover from residential or small business electric consumers, including through rates charged by such covered utility for providing electric service, any costs of the covered utility associated with covered data centers, including any costs associated with any upgrade made to the generation, transmission, or distribution facilities of the electric grid in order to meet the demand for electric energy from covered data centers.] | ||
| (22)(B) | (B) [inserted: Definitions.—] | |
| [inserted: In this paragraph:] | ||
| (22)(B)(i) | (i) [inserted: Covered utility.—] | |
| [inserted: The term “covered utility” means a State regulated electric utility that is investor owned.] | ||
| (22)(B)(ii) | (ii) [inserted: Covered data center.—] | |
| [inserted: The term “covered data center” means a facility, or an aggregation of facilities at a single site, with respect to which the peak demand of such facility or such aggregation of facilities exceeds 75 megawatts, that primarily contain electronic equipment used to process, store, transmit, or host digital information and the electrical, mechanical, and environmental control equipment to maintain the proper conditions for the operation of electronic equipment.] |