H.R. 9658 · Nuclear Regulatory Modernization Act of 2026 ·

In committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

42 U.S.C. § 2239 Hearings and judicial review

+2 −23 of 5 shown
More for 42 U.S.C. § 2239
Read § 2239Only this section
5 changes the bill asks for here, 3 carried out
  1. Not carried out:

    by striking In any proceeding under this Act and inserting the following:(i) In any proceeding under this Act; and

    The bill turns “In any proceeding under this Act” into a provision of its own, but in § 2239(a)(1)(A) the text doesn't begin with those words. The law may have changed since the bill was drafted.

    Technical detail“In any proceeding under this Act” does not open the text of /us/usc/t42/s2239/a/1/A
  2. Not carried out:

    in clause (i) (as so designated), by striking The Commission shall hold a hearing and all that follows through upon a determination by the Commission that the amendment involves no significant hazards consideration. and inserting the following:(ii) The Commission may, in the absence of a request for a hearing by any person whose interest may be affected, issue a construction permit, an operating license, a combined construction permit and operating license, an amendment to a construction permit, an amendment to an …

    We can't read how this instruction is worded yet, so it isn't shown in the text.

    Technical detailno-pattern: striking QTEXT and all that follows through QTEXT and inserting the following: QCONTENT;
  3. Carried out:

    by inserting informal before hearing procedures; and

  4. Carried out:

    by striking , whether informal or formal adjudicatory,; and

  5. Carried out:

    in the second sentence of paragraph (2)(A), by striking required hearing and inserting hearing held by the Commission under this section.

§ 2239(a)(1)–(2)

Start of § 2239 to (a)(1)(B)(ii) unchanged

WhereMarkText
(1)(B)(iii)(iii)
After receiving a request for a hearing under clause (i), the Commission expeditiously shall either deny or grant the request. If the request is granted, the Commission shall determine, after considering petitioners’ prima facie showing and any answers thereto, whether during a period of interim operation, there will be reasonable assurance of adequate protection of the public health and safety. If the Commission determines that there is such reasonable assurance, it shall allow operation during an interim period under the combined license.
(1)(B)(iv)(iv)
The Commission, in its discretion, shall determine appropriate hearing procedures[struck: ,] [struck: whether informal or formal adjudicatory, ]for any hearing under clause (i), and shall state its reasons therefor.
The Commission, in its discretion, shall determine appropriate [inserted: informal ]hearing procedures for any hearing under clause (i), and shall state its reasons therefor.
(1)(B)(v)(v)
The Commission shall, to the maximum possible extent, render a decision on issues raised by the hearing request within 180 days of the publication of the notice provided by clause (i) or the anticipated date for initial loading of fuel into the reactor, whichever is later. Commencement of operation under a combined license is not subject to subparagraph (A).
(2)(2)
(2)(A)(A)
The Commission may issue and make immediately effective any amendment to an operating license or any amendment to a combined construction and operating license, upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person. Such amendment may be issued and made immediately effective in advance of the holding and completion of any [struck: required ]hearing. In determining under this section whether such amendment involves no significant hazards consideration, the Commission shall consult with the State in which the facility involved is located. In all other respects such amendment shall meet the requirements of this chapter.
The Commission may issue and make immediately effective any amendment to an operating license or any amendment to a combined construction and operating license, upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person. Such amendment may be issued and made immediately effective in advance of the holding and completion of any hearing[inserted: held by the Commission under this section]. In determining under this section whether such amendment involves no significant hazards consideration, the Commission shall consult with the State in which the facility involved is located. In all other respects such amendment shall meet the requirements of this chapter.
(2)(B)(B)
The Commission shall periodically (but not less frequently than once every thirty days) publish notice of any amendments issued, or proposed to be issued, as provided in subparagraph (A). Each such notice shall include all amendments issued, or proposed to be issued, since the date of publication of the last such periodic notice. Such notice shall, with respect to each amendment or proposed amendment (i) identify the facility involved; and (ii) provide a brief description of such amendment. Nothing in this subsection shall be construed to delay the effective date of any amendment.
(2)(C)(C)
The Commission shall, during the ninety-day period following the effective date of this paragraph, promulgate regulations establishing (i) standards for determining whether any amendment to an operating license or any amendment to a combined construction and operating license involves no significant hazards consideration; (ii) criteria for providing or, in emergency situations, dispensing with prior notice and reasonable opportunity for public comment on any such determination, which criteria shall take into account the exigency of the need for the amendment involved; and (iii) procedures for consultation on any such determination with the State in which the facility involved is located.

Rest of § 2239 unchanged

42 U.S.C. § 2243 Licensing of uranium enrichment facilities

+34 −37Shown
More for 42 U.S.C. § 2243
Read § 2243Only this section
4 changes the bill asks for here, 4 carried out
  1. Carried out:

    by amending subsection (a) to read as follows:(a) At-Risk construction.— (1) In general.— Commencement of construction of a uranium enrichment facility prior to the issuance of a license under sections 53 and 63 for that facility shall be permitted under the same terms and conditions applicable to other fuel cycle …

  2. Carried out:

    by striking subsection (b);

  3. Carried out:

    by redesignating subsections (c) through (f) as subsections (b) through (e), respectively; and

  4. Carried out:

    in the first sentence of subsection (b), as so redesignated, by striking construction and.

§ 2243(a)–(e)

WhereMarkText
§ 2243. Licensing of uranium enrichment facilities
(a)(a) [struck: Environmental] [struck: impact statement]
(a) [inserted: At-Risk] [inserted: construction.—]
(a)(1)(1) [struck: Major] [struck: Federal action]
(1) [inserted: In] [inserted: general.—]
[struck: The] [struck: issuance] of a [struck: license] [struck: under] [struck: sections] [struck: 2073] [struck: and] [struck: 2093] of [struck: this] [struck: title] [struck: for] [struck: the] [struck: construction] and [struck: operation] [struck: of] [struck: any] [struck: uranium enrichment ]facility shall be [struck: considered] [struck: a] [struck: major Federal action significantly affecting ]the [struck: quality] [struck: of] [struck: the] [struck: human] [struck: environment] [struck: for] [struck: purposes] [struck: of] [struck: the] [struck: National] [struck: Environmental] [struck: Policy] [struck: Act] [struck: of 1969 (42 U].[struck: S.C. 4321 et seq.).]
[inserted: Commencement] [inserted: of] [inserted: construction ]of a [inserted: uranium] [inserted: enrichment] [inserted: facility] [inserted: prior] [inserted: to] [inserted: the] [inserted: issuance ]of [inserted: a] [inserted: license] [inserted: under] [inserted: sections] [inserted: 53] and [inserted: 63] [inserted: for] [inserted: that] facility shall be [inserted: permitted] [inserted: under] the [inserted: same] [inserted: terms] [inserted: and] [inserted: conditions] [inserted: applicable] [inserted: to] [inserted: other] [inserted: fuel] [inserted: cycle] [inserted: facilities] [inserted: licensed] [inserted: under] [inserted: such] [inserted: sections].
(a)(2)(2) [struck: Timing]
(2) [inserted: Rule of construction.—]
[inserted: Nothing in this subsection shall be construed to affect—]
(a)(2)(A)(A) [inserted: ]
[inserted: the authority of the Nuclear Regulatory Commission to regulate construction as necessary for issuing a license under sections 53 and 63 for a uranium enrichment facility, including the authority to deny an application for such a license for the failure of an applicant to construct such a facility in accordance with regulatory requirements; or]
(a)(2)(B)(B) [inserted: ]
[inserted: the right of any person whose interest may be affected by a proceeding under this Act to a hearing under section 189.]
(a)(2)[struck: An environmental impact statement prepared under paragraph (1) shall be prepared before the hearing on the issuance of a license for the construction and operation of a uranium enrichment facility is completed.]
(b)(b) [struck: Adjudicatory hearing]
(b)(1)(1) [struck: In general]
[struck: The Commission shall conduct a single adjudicatory hearing on the record with regard to the licensing of the construction and operation of a uranium enrichment facility under sections 2073 and 2093 of this title.]
(b)(2)(2) [struck: Timing]
[struck: Such hearing shall be completed and a decision issued before the issuance of a license for such construction and operation.]
(b)(3)(3) [struck: Single proceeding]
[struck: No further Commission licensing action shall be required to authorize operation.]
(b)[struck: (c)] Inspection and operation
[inserted: (b)] Inspection and operation
Prior to commencement of operation of a uranium enrichment facility licensed hereunder, the Commission shall verify through inspection that the facility has been constructed in accordance with the requirements of the license for [struck: construction and ]operation. The Commission shall publish notice of the inspection results in the Federal Register.
Prior to commencement of operation of a uranium enrichment facility licensed hereunder, the Commission shall verify through inspection that the facility has been constructed in accordance with the requirements of the license for operation. The Commission shall publish notice of the inspection results in the Federal Register.
(c)[struck: (d)] Insurance and decommissioning
[inserted: (c)] Insurance and decommissioning
(c)(1)(1)
(1)
The Commission shall require, as a condition of the issuance of a license under sections 2073 and 2093 of this title for a uranium enrichment facility, that the licensee have and maintain liability insurance of such type and in such amounts as the Commission judges appropriate to cover liability claims arising out of any occurrence within the United States, causing, within or outside the United States, bodily injury, sickness, disease, or death, or loss of or damage to property, or loss of use of property, arising out of or resulting from the radioactive, toxic, explosive, or other hazardous properties of chemical compounds containing source or special nuclear material.
The Commission shall require, as a condition of the issuance of a license under sections 2073 and 2093 of this title for a uranium enrichment facility, that the licensee have and maintain liability insurance of such type and in such amounts as the Commission judges appropriate to cover liability claims arising out of any occurrence within the United States, causing, within or outside the United States, bodily injury, sickness, disease, or death, or loss of or damage to property, or loss of use of property, arising out of or resulting from the radioactive, toxic, explosive, or other hazardous properties of chemical compounds containing source or special nuclear material.
(c)(2)(2)
(2)
The Commission shall require, as a condition for the issuance of a license under sections 2073 and 2093 of this title for a uranium enrichment facility, that the licensee provide adequate assurance of the availability of funds for the decommissioning (including decontamination) of such facility using funding mechanisms that may include, but are not necessarily limited to, the following:
The Commission shall require, as a condition for the issuance of a license under sections 2073 and 2093 of this title for a uranium enrichment facility, that the licensee provide adequate assurance of the availability of funds for the decommissioning (including decontamination) of such facility using funding mechanisms that may include, but are not necessarily limited to, the following:
(c)(2)(A)(A)
(A)
Prepayment (in the form of a trust, escrow account, government fund, certificate of deposit, or deposit of government securities).
Prepayment (in the form of a trust, escrow account, government fund, certificate of deposit, or deposit of government securities).
(c)(2)(B)(B)
(B)
Surety (in the form of a surety or performance bond, letter of credit, or line of credit), insurance, or other guarantee (including parent company guarantee) method.
Surety (in the form of a surety or performance bond, letter of credit, or line of credit), insurance, or other guarantee (including parent company guarantee) method.
(c)(2)(C)(C)
(C)
External sinking fund in which deposits are made at least annually.
External sinking fund in which deposits are made at least annually.
(d)[struck: (e)] No Price-Anderson coverage
[inserted: (d)] No Price-Anderson coverage
Section 2210 of this title shall not apply to any license under section 2073 or 2093 of this title for a uranium enrichment facility constructed after November 15, 1990.
Section 2210 of this title shall not apply to any license under section 2073 or 2093 of this title for a uranium enrichment facility constructed after November 15, 1990.
(e)[struck: (f)] Limitation
[inserted: (e)] Limitation
No license or certificate of compliance may be issued to the United States Enrichment Corporation or its successor under this section or sections1 2073, 2093, or 2297f of this title, if the Commission determines that—
No license or certificate of compliance may be issued to the United States Enrichment Corporation or its successor under this section or sections1 2073, 2093, or 2297f of this title, if the Commission determines that—
(e)(1)(1)
(1)
the Corporation is owned, controlled, or dominated by an alien, a foreign corporation, or a foreign government; or
the Corporation is owned, controlled, or dominated by an alien, a foreign corporation, or a foreign government; or
(e)(2)(2)
(2)
the issuance of such a license or certificate of compliance would be inimical to—
the issuance of such a license or certificate of compliance would be inimical to—
(e)(2)(A)(A)
(A)
the common defense and security of the United States; or
the common defense and security of the United States; or
(e)(2)(B)(B)
(B)
the maintenance of a reliable and economical domestic source of enrichment services.
the maintenance of a reliable and economical domestic source of enrichment services.

42 U.S.C. § 2235 Construction permits and operating licenses

Couldn't place the change
More for 42 U.S.C. § 2235
Read § 2235Only this section

The bill's words for this section

  1. Not carried out:

    Section 185 b. of the Atomic Energy Act of 1954 (42 U.S.C. 2235(b)) is amended by striking After holding a public hearing under section 189 a. (1)(A), and inserting After the thirty days notice and publication period or holding a hearing, as applicable, under section 189 a. (1)(A),.

    “After holding a public hearing under section 189 a. (1)(A),” isn't in § 2235(b) in the Code as we have it. The law may have changed since the bill was drafted.

    Technical detail“After holding a public hearing under section 189 a. (1)(A),” not found in /us/usc/t42/s2235/b