Title 16 · ConservationParks and public lands
Changes to 16 U.S.C. § 803
H.R. 9806 · Fair Licensing for Operations of Water Structures Act · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
FLOWS Act
In committee · step 2 of 5
16 U.S.C. § 803 Conditions of license generally
2 changes the bill asks for here, 2 carried out
- Carried out:
Section 10(b) of the Federal Power Act (16 U.S.C. 803(b)) is amended by adding at the end the following: Except as previously provided in this subsection, the Commission shall require prior approval of a
substantial alteration or addition
to project works or to project operations consisting of any significant modification of the project works or operation of the project that is not in conformity with the project plans previously approved by the Commission. The Commission shall not require approval of any alteration or addition other than a substantial alteration or addition as determined pursuant to regulations promulgated under section 2(c) of the Fair Licensing for Operations of Water Structures Act or any temporary variance to the project operations necessitated by circumstances beyond the reasonable control of the licensee, including extreme weather, natural disasters, equipment failures, or other unforeseen circumstances.. - Carried out:
Section 10(c) of the Federal Power Act (16 U.S.C. 803(c)) is amended by inserting after the first sentence the following:
The Commission shall not require approval or an amendment to a project license for any routine maintenance, repair, or replacement of any portion of a project works necessary to maintain the project works in accordance with this subsection.
.
§ 803(a)–(e)
Start of § 803 to (a)(2)(C) unchanged ·
(3) Upon receipt of an application for a license, the Commission shall solicit recommendations from the agencies and Indian tribes identified in subparagraphs (A) and (B) of paragraph (2) for proposed terms and conditions for the Commission’s consideration for inclusion in the license.
(b) Alterations in project works That except when emergency shall require for the protection of navigation, life, health, or property, no substantial alteration or addition not in conformity with the approved plans shall be made to any dam or other project works constructed hereunder of an installed capacity in excess of two thousand horsepower without the prior approval of the Commission; and any emergency alteration or addition so made shall thereafter be subject to such modification and change as the Commission may direct.[inserted: Except as previously provided in this subsection, the Commission shall require prior approval of a “substantial alteration or addition” to project works or to project operations consisting of any significant modification of the project works or operation of the project that is not in conformity with the project plans previously approved by the Commission. The Commission shall not require approval of any alteration or addition other than a substantial alteration or addition as determined pursuant to regulations promulgated under section 2(c) of the Fair Licensing for Operations of Water Structures Act or any temporary variance to the project operations necessitated by circumstances beyond the reasonable control of the licensee, including extreme weather, natural disasters, equipment failures, or other unforeseen circumstances.]
(c) Maintenance and repair of project works; liability of licensee for damages That the licensee shall maintain the project works in a condition of repair adequate for the purposes of navigation and for the efficient operation of said works in the development and transmission of power, shall make all necessary renewals and replacements, shall establish and maintain adequate depreciation reserves for such purposes, shall so maintain, and operate said works as not to impair navigation, and shall conform to such rules and regulations as the Commission may from time to time prescribe for the protection of life, health, and property. [inserted: The Commission shall not require approval or an amendment to a project license for any routine maintenance, repair, or replacement of any portion of a project works necessary to maintain the project works in accordance with this subsection. ]Each licensee hereunder shall be liable for all damages occasioned to the property of others by the construction, maintenance, or operation of the project works or of the works appurtenant or accessory thereto, constructed under the license and in no event shall the United States be liable therefor.
(d) Amortization reserves That after the first twenty years of operation, out of surplus earned thereafter, if any, accumulated in excess of a specified reasonable rate of return upon the net investment of a licensee in any project or projects under license, the licensee shall establish and maintain amortization reserves, which reserves shall, in the discretion of the Commission, be held until the termination of the license or be applied from time to time in reduction of the net investment. Such specified rate of return and the proportion of such surplus earnings to be paid into and held in such reserves shall be set forth in the license. For any new license issued under section 808 of this title, the amortization reserves under this subsection shall be maintained on and after the effective date of such new license.
(e) Annual charges payable by licensees; maximum rates; application; review and report to Congress
Rest of § 803 unchanged ·