Skip to content
The People's CodeSearch
Menu

Changes to the Code

H.R. 9806 · Fair Licensing for Operations of Water Structures Act ·

FLOWS Act

In committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

16 U.S.C. § 803 Conditions of license generally

+2 −2Shown
More for 16 U.S.C. § 803
Read § 803Only this section
2 changes the bill asks for here, 2 carried out
  1. Carried out:

    Section 10(b) of the Federal Power Act (16 U.S.C. 803(b)) is amended by adding at the end the following: Except as previously provided in this subsection, the Commission shall require prior approval of a substantial alteration or addition to project works or to project operations consisting of any significant modification of the project works or operation of the project that is not in conformity with the project plans previously approved by the Commission. The Commission shall not require approval of any alteration or addition other than a substantial alteration or addition as determined pursuant to regulations promulgated under section 2(c) of the Fair Licensing for Operations of Water Structures Act or any temporary variance to the project operations necessitated by circumstances beyond the reasonable control of the licensee, including extreme weather, natural disasters, equipment failures, or other unforeseen circumstances..

  2. Carried out:

    Section 10(c) of the Federal Power Act (16 U.S.C. 803(c)) is amended by inserting after the first sentence the following: The Commission shall not require approval or an amendment to a project license for any routine maintenance, repair, or replacement of any portion of a project works necessary to maintain the project works in accordance with this subsection..

§ 803(a)–(e)

Start of § 803 to (a)(2)(C) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(a)(3)(3) (3)
Upon receipt of an application for a license, the Commission shall solicit recommendations from the agencies and Indian tribes identified in subparagraphs (A) and (B) of paragraph (2) for proposed terms and conditions for the Commission’s consideration for inclusion in the license.Upon receipt of an application for a license, the Commission shall solicit recommendations from the agencies and Indian tribes identified in subparagraphs (A) and (B) of paragraph (2) for proposed terms and conditions for the Commission’s consideration for inclusion in the license.
(b)(b) Alterations in project works(b) Alterations in project works
That except when emergency shall require for the protection of navigation, life, health, or property, no substantial alteration or addition not in conformity with the approved plans shall be made to any dam or other project works constructed hereunder of an installed capacity in excess of two thousand horsepower without the prior approval of the Commission; and any emergency alteration or addition so made shall thereafter be subject to such modification and change as the Commission may direct.That except when emergency shall require for the protection of navigation, life, health, or property, no substantial alteration or addition not in conformity with the approved plans shall be made to any dam or other project works constructed hereunder of an installed capacity in excess of two thousand horsepower without the prior approval of the Commission; and any emergency alteration or addition so made shall thereafter be subject to such modification and change as the Commission may direct.[inserted: Except as previously provided in this subsection, the Commission shall require prior approval of a “substantial alteration or addition” to project works or to project operations consisting of any significant modification of the project works or operation of the project that is not in conformity with the project plans previously approved by the Commission. The Commission shall not require approval of any alteration or addition other than a substantial alteration or addition as determined pursuant to regulations promulgated under section 2(c) of the Fair Licensing for Operations of Water Structures Act or any temporary variance to the project operations necessitated by circumstances beyond the reasonable control of the licensee, including extreme weather, natural disasters, equipment failures, or other unforeseen circumstances.]
(c)(c) Maintenance and repair of project works; liability of licensee for damages(c) Maintenance and repair of project works; liability of licensee for damages
That the licensee shall maintain the project works in a condition of repair adequate for the purposes of navigation and for the efficient operation of said works in the development and transmission of power, shall make all necessary renewals and replacements, shall establish and maintain adequate depreciation reserves for such purposes, shall so maintain, and operate said works as not to impair navigation, and shall conform to such rules and regulations as the Commission may from time to time prescribe for the protection of life, health, and property. Each licensee hereunder shall be liable for all damages occasioned to the property of others by the construction, maintenance, or operation of the project works or of the works appurtenant or accessory thereto, constructed under the license and in no event shall the United States be liable therefor.That the licensee shall maintain the project works in a condition of repair adequate for the purposes of navigation and for the efficient operation of said works in the development and transmission of power, shall make all necessary renewals and replacements, shall establish and maintain adequate depreciation reserves for such purposes, shall so maintain, and operate said works as not to impair navigation, and shall conform to such rules and regulations as the Commission may from time to time prescribe for the protection of life, health, and property. [inserted: The Commission shall not require approval or an amendment to a project license for any routine maintenance, repair, or replacement of any portion of a project works necessary to maintain the project works in accordance with this subsection. ]Each licensee hereunder shall be liable for all damages occasioned to the property of others by the construction, maintenance, or operation of the project works or of the works appurtenant or accessory thereto, constructed under the license and in no event shall the United States be liable therefor.
(d)(d) Amortization reserves(d) Amortization reserves
That after the first twenty years of operation, out of surplus earned thereafter, if any, accumulated in excess of a specified reasonable rate of return upon the net investment of a licensee in any project or projects under license, the licensee shall establish and maintain amortization reserves, which reserves shall, in the discretion of the Commission, be held until the termination of the license or be applied from time to time in reduction of the net investment. Such specified rate of return and the proportion of such surplus earnings to be paid into and held in such reserves shall be set forth in the license. For any new license issued under section 808 of this title, the amortization reserves under this subsection shall be maintained on and after the effective date of such new license.That after the first twenty years of operation, out of surplus earned thereafter, if any, accumulated in excess of a specified reasonable rate of return upon the net investment of a licensee in any project or projects under license, the licensee shall establish and maintain amortization reserves, which reserves shall, in the discretion of the Commission, be held until the termination of the license or be applied from time to time in reduction of the net investment. Such specified rate of return and the proportion of such surplus earnings to be paid into and held in such reserves shall be set forth in the license. For any new license issued under section 808 of this title, the amortization reserves under this subsection shall be maintained on and after the effective date of such new license.
(e)(e) Annual charges payable by licensees; maximum rates; application; review and report to Congress(e) Annual charges payable by licensees; maximum rates; application; review and report to Congress

Rest of § 803 unchanged

Federal Power Act § 37 Licensing of micro hydrokinetic energy projects New section

+45 −0Shown
More for Federal Power Act § 37
1 change the bill asks for here, 1 carried out
  1. Carried out:

    Part I of the Federal Power Act (16 U.S.C. 792 et seq.) is amended by adding at the end the following:37. Licensing of micro hydrokinetic energy projects (a) Definition of micro hydrokinetic energy project.— In this section, the term micro hydrokinetic energy project— (1) means a project that— (A) has an installed capacity of not more than 5 megawatts; and (B) converts to electric energy the hydrokinetic energy from a generator driven by a turbine from— (i) waves, tides, or currents in oceans, estuaries, or tidal areas; or (ii) free flowing water in rivers, lakes, streams, or man-made channels; and (2) does not include a project that impounds water to generate electricity. (b) Authorization.— The Commission may issue a license in accordance with this section for a term of not less than 10, and not more than 20, years for the construction, operation, and maintenance of project works for a micro hydrokinetic energy project. (c) Expedited licensing process.— (1) Notification of intent.— (A) Filing of notification.— An applicant for a license under this section shall commence the licensing process by filing a notification of intent with the Commission. (B) Existing license deadline.— Notwithstanding section 15(b)(1), an applicant for a license under this section shall file a notification of intent under subparagraph (A) not later than 2 years before the expiration of an existing license, if applicable. (2) Filing of application.— (A) In general.— Except as provided in subparagraph (B), an applicant for a license under this section shall submit to the Commission an application not later than 1 year after the date on which the applicant files a notification of intent under paragraph (1). (B) Existing license deadline.— Notwithstanding section 15(c)(1), an applicant for a license under this section shall file an application with the Commission not later than 1 year before the date of expiration of the term of an existing license, if applicable. (3) Deadline for issuance.— The Commission shall take final action on an application for a license under this section not later than 1 year after the date on which the application is filed under paragraph (2). (4) Schedule for final action.— To the extent reasonably practicable, the Commission and any applicable conditioning or permitting agencies shall establish, with respect to each micro hydrokinetic energy project that is the subject of a notification of intent to apply for a license under this section, a joint schedule that permits the timely completion of decisions required to be made with respect to, and the timely issuance of, authorizations required under Federal law by the Commission and the conditioning or permitting agencies, subject to the requirement that any joint schedule established under this paragraph shall comply with the deadline for final action established under paragraph (3). (d) Regulations.— (1) In general.— Not later than 180 days after the date of enactment of this section, the Commission shall promulgate regulations to implement this section in a manner that expedites the deployment of micro hydrokinetic energy projects while ensuring the safe operation of the micro hydrokinetic energy project in compliance with applicable Federal and State laws. (2) Inclusion.— The regulations promulgated under paragraph (1) shall provide for the use of 1 or more categorical exclusions, including allowing for extraordinary circumstances under which the categorical exclusion shall not be available, under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) for low disturbance activities necessary for micro hydrokinetic energy projects. (e) Report to congress.— The Commission shall submit to Congress a report describing the impacts of the micro hydrokinetic energy projects licensed under this section on the environment, the economy, and the reliability and affordability of electricity not later than the earlier of— (1) the date that is 5 years after the date of enactment of this section; and (2) the date on which the first 50 micro hydrokinetic energy projects licensed under this section have been operational for not less than 1 year. (f) Savings clause.— Nothing in this section affects any authority of the Commission, at the election of an applicant, to license the construction, operation, and maintenance of project works for a micro hydrokinetic energy project under any other provision of this part..

§ 37(a)–(f)

WhereMarkThe Code nowMarkAs the bill would leave it
§ 37. [inserted: Licensing of micro hydrokinetic energy projects]
(a)(a) [inserted: Definition of micro hydrokinetic energy project.—]
[inserted: In this section, the term “micro hydrokinetic energy project”—]
(a)(1)(1) [inserted: ]
[inserted: means a project that—]
(a)(1)(A)(A) [inserted: ]
[inserted: has an installed capacity of not more than 5 megawatts; and]
(a)(1)(B)(B) [inserted: ]
[inserted: converts to electric energy the hydrokinetic energy from a generator driven by a turbine from—]
(a)(1)(B)(i)(i) [inserted: ]
[inserted: waves, tides, or currents in oceans, estuaries, or tidal areas; or]
(a)(1)(B)(ii)(ii) [inserted: ]
[inserted: free flowing water in rivers, lakes, streams, or man-made channels; and]
(a)(2)(2) [inserted: ]
[inserted: does not include a project that impounds water to generate electricity.]
(b)(b) [inserted: Authorization.—]
[inserted: The Commission may issue a license in accordance with this section for a term of not less than 10, and not more than 20, years for the construction, operation, and maintenance of project works for a micro hydrokinetic energy project.]
(c)(c) [inserted: Expedited licensing process.—]
(c)(1)(1) [inserted: Notification of intent.—]
(c)(1)(A)(A) [inserted: Filing of notification.—]
[inserted: An applicant for a license under this section shall commence the licensing process by filing a notification of intent with the Commission.]
(c)(1)(B)(B) [inserted: Existing license deadline.—]
[inserted: Notwithstanding section 15(b)(1), an applicant for a license under this section shall file a notification of intent under subparagraph (A) not later than 2 years before the expiration of an existing license, if applicable.]
(c)(2)(2) [inserted: Filing of application.—]
(c)(2)(A)(A) [inserted: In general.—]
[inserted: Except as provided in subparagraph (B), an applicant for a license under this section shall submit to the Commission an application not later than 1 year after the date on which the applicant files a notification of intent under paragraph (1).]
(c)(2)(B)(B) [inserted: Existing license deadline.—]
[inserted: Notwithstanding section 15(c)(1), an applicant for a license under this section shall file an application with the Commission not later than 1 year before the date of expiration of the term of an existing license, if applicable.]
(c)(3)(3) [inserted: Deadline for issuance.—]
[inserted: The Commission shall take final action on an application for a license under this section not later than 1 year after the date on which the application is filed under paragraph (2).]
(c)(4)(4) [inserted: Schedule for final action.—]
[inserted: To the extent reasonably practicable, the Commission and any applicable conditioning or permitting agencies shall establish, with respect to each micro hydrokinetic energy project that is the subject of a notification of intent to apply for a license under this section, a joint schedule that permits the timely completion of decisions required to be made with respect to, and the timely issuance of, authorizations required under Federal law by the Commission and the conditioning or permitting agencies, subject to the requirement that any joint schedule established under this paragraph shall comply with the deadline for final action established under paragraph (3).]
(d)(d) [inserted: Regulations.—]
(d)(1)(1) [inserted: In general.—]
[inserted: Not later than 180 days after the date of enactment of this section, the Commission shall promulgate regulations to implement this section in a manner that expedites the deployment of micro hydrokinetic energy projects while ensuring the safe operation of the micro hydrokinetic energy project in compliance with applicable Federal and State laws.]
(d)(2)(2) [inserted: Inclusion.—]
[inserted: The regulations promulgated under paragraph (1) shall provide for the use of 1 or more categorical exclusions, including allowing for extraordinary circumstances under which the categorical exclusion shall not be available, under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) for low disturbance activities necessary for micro hydrokinetic energy projects.]
(e)(e) [inserted: Report to congress.—]
[inserted: The Commission shall submit to Congress a report describing the impacts of the micro hydrokinetic energy projects licensed under this section on the environment, the economy, and the reliability and affordability of electricity not later than the earlier of—]
(e)(1)(1) [inserted: ]
[inserted: the date that is 5 years after the date of enactment of this section; and]
(e)(2)(2) [inserted: ]
[inserted: the date on which the first 50 micro hydrokinetic energy projects licensed under this section have been operational for not less than 1 year.]
(f)(f) [inserted: Savings clause.—]
[inserted: Nothing in this section affects any authority of the Commission, at the election of an applicant, to license the construction, operation, and maintenance of project works for a micro hydrokinetic energy project under any other provision of this part.]

Step through the changes