Skip to content
The People's CodeSearch
Menu

Changes to the Code

H.R. 9945 · Lowering Energy Costs through Grid Modernization Act ·

In committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

26 U.S.C. § 48 Energy credit

+1 −1Shown
More for 26 U.S.C. § 48
Read § 48Only this section
1 change the bill asks for here, 1 carried out
  1. Carried out:

    Section 48(e)(4)(D) of such Code is amended by striking section 48E(h)(4)(D)(ii) and inserting section 48E(i)(4)(D)(ii).

§ 48(e)(4)Allocations(C)–(E)

Start of § 48 to (e)(4)(B) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(C)(C) Annual capacity limitation(C) Annual capacity limitation
For purposes of this paragraph, the term “annual capacity limitation” means 1.8 gigawatts of direct current capacity for each of calendar years 2023 and 2024, and zero thereafter.For purposes of this paragraph, the term “annual capacity limitation” means 1.8 gigawatts of direct current capacity for each of calendar years 2023 and 2024, and zero thereafter.
(D)(D) Carryover of unused limitation(D) Carryover of unused limitation
If the annual capacity limitation for any calendar year exceeds the aggregate amount allocated for such year under this paragraph, such limitation for the succeeding calendar year shall be increased by the amount of such excess. No amount may be carried under the preceding sentence to any calendar year after 2024 except as provided in section 48E([struck: h])(4)(D)(ii).If the annual capacity limitation for any calendar year exceeds the aggregate amount allocated for such year under this paragraph, such limitation for the succeeding calendar year shall be increased by the amount of such excess. No amount may be carried under the preceding sentence to any calendar year after 2024 except as provided in section 48E([inserted: i])(4)(D)(ii).
(E)(E) Placed in service deadline(E) Placed in service deadline
(E)(i)(i) In general(i) In general
Paragraph (1) shall not apply with respect to any property which is placed in service after the date that is 4 years after the date of the allocation with respect to the facility of which such property is a part.Paragraph (1) shall not apply with respect to any property which is placed in service after the date that is 4 years after the date of the allocation with respect to the facility of which such property is a part.

Rest of § 48 unchanged

26 U.S.C. § 48E Clean electricity investment credit

+174 −14515 of 17 shown
More for 26 U.S.C. § 48E
Read § 48EOnly this section
17 changes the bill asks for here, 15 carried out
  1. Carried out:

    in subparagraph (A), by striking and at the end,

  2. Carried out:

    in subparagraph (B), by striking the period at the end and inserting , and, and

  3. Carried out:

    by adding at the end the following new subparagraph:(C) any high-performance transmission property..

  4. Carried out:

    Section 48E(a)(2) of such Code is amended by adding at the end the following new subparagraph:(C) High-performance transmission property.— Subject to paragraph (3)— (i) Base rate.— In the case of any high-performance transmission property which is not described in clause (ii)(I) and does not satisfy the requirements described in clause (ii)(II), the applicable percentage …

  5. Carried out:

    in clause (i), by striking or with respect to energy storage technology and inserting , energy storage technology, or high-performance transmission property, and

  6. Carried out:

    in subclause (I), by striking or with respect to energy storage technology described in paragraph (2)(B)(i) and inserting , energy storage technology described in paragraph (2)(B)(i), or high-performance transmission property described in paragraph (2)(C)(i), and

  7. Carried out:

    in subclause (II), by striking or with respect to energy storage technology described in paragraph (2)(B)(ii) and inserting , energy storage technology described in paragraph (2)(B)(ii), or high-performance transmission property described in paragraph (2)(C)(ii).

  8. Carried out:

    Section 48E(a)(3)(B) of such Code is amended by striking or energy storage technology each place it appears and inserting , energy storage technology, or high-performance transmission property in each such place.

  9. Carried out:

    by redesignating subsections (d) through (k) as subsections (e) through (l), respectively, and

  10. Carried out:

    by inserting after subsection (c) the following new subsection:(d) Qualified investment with respect to high-Performance transmission property.— (1) Qualified investment.— For purposes of subsection (a), the qualified investment with respect to high-performance transmission property for any taxable year is the basis of any high-performance …

  11. Carried out:

    Section 48E(e)(6)(B) of such Code, as redesignated by subsection (d), is amended by striking or energy storage technology described in subsection (c)(2) and inserting , energy storage technology described in subsection (c)(2), or high-performance transmission property described in subsection (d)(2).

  12. Carried out:

    by striking or energy storage technology each place it appears and inserting , energy storage technology, or high-performance transmission property in each such place, and

  13. Carried out:

    by inserting or any high-performance transmission property after any energy storage technology.

  14. Carried out:

    by striking subsection (d) both places it appears and inserting subsection (e) in each such place,

  15. Not carried out:

    by striking subsection (d)(3) both places it appears and inserting subsection (e)(3) in each such place, and

    “subsection (d)(3)” isn't in § 48E(a)(2) in the Code as we have it. The law may have changed since the bill was drafted.

    Technical detail“subsection (d)(3)” not found in /us/usc/t26/s48E/a/2
  16. Not carried out:

    by striking subsection (d)(4) both places it appears and inserting subsection (e)(4) in each such place.

    “subsection (d)(4)” isn't in § 48E(a)(2) in the Code as we have it. The law may have changed since the bill was drafted.

    Technical detail“subsection (d)(4)” not found in /us/usc/t26/s48E/a/2
  17. Carried out:

    Section 48E(k) of such Code, as redesignated by subsection (d), is amended by striking subsection (g) and inserting subsection (h).

§ 48E(a)

WhereMarkThe Code nowMarkAs the bill would leave it
§ 48E. Clean electricity investment credit§ 48E. Clean electricity investment credit
(a)(a) Investment credit for qualified property(a) Investment credit for qualified property
(a)(1)(1) In general(1) In general
For purposes of section 46, the clean electricity investment credit for any taxable year is an amount equal to the applicable percentage of the qualified investment for such taxable year with respect to—For purposes of section 46, the clean electricity investment credit for any taxable year is an amount equal to the applicable percentage of the qualified investment for such taxable year with respect to—
(a)(1)(A)(A) (A)
any qualified facility,[struck: and]any qualified facility,
(a)(1)(B)(B) (B)
any energy storage technology[struck: .]any energy storage technology[inserted: , and]
(a)(1)(C)(C) [inserted: ]
[inserted: any high-performance transmission property.]
(a)(2)(2) Applicable percentage(2) Applicable percentage
(a)(2)(A)(A) Qualified facilities(A) Qualified facilities
Subject to paragraph (3)—Subject to paragraph (3)—

§ 48E(a)(2)Applicable percentage(A)–(B)

(a)(2)(A)(i)–(ii) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(A)(ii)(I)(I) (I)
with a maximum net output of less than 1 megawatt (as measured in alternating current),with a maximum net output of less than 1 megawatt (as measured in alternating current),
(A)(ii)(II)(II) (II)
the construction of which begins prior to the date that is 60 days after the Secretary publishes guidance with respect to the requirements of paragraphs (3) and (4) of subsection ([struck: d]), orthe construction of which begins prior to the date that is 60 days after the Secretary publishes guidance with respect to the requirements of paragraphs (3) and (4) of subsection ([inserted: e]), or
(A)(ii)(III)(III) (III)
which—which—
(A)(ii)(III)(aa)(aa) (aa)
satisfies the requirements of subsection ([struck: d])(3), andsatisfies the requirements of subsection ([inserted: e])(3), and
(A)(ii)(III)(bb)(bb) (bb)
with respect to the construction of such facility, satisfies the requirements of subsection ([struck: d])(4),with respect to the construction of such facility, satisfies the requirements of subsection ([inserted: e])(4),
(A)the applicable percentage shall be 30 percent.the applicable percentage shall be 30 percent.
(B)(B) Energy storage technology(B) Energy storage technology
Subject to paragraph (3)—Subject to paragraph (3)—

§ 48E(a)–(b)

(a)(2)(B)(i)–(ii) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(a)(2)(B)(ii)(I)(I) (I)
with a capacity of less than 1 megawatt,with a capacity of less than 1 megawatt,
(a)(2)(B)(ii)(II)(II) (II)
the construction of which begins prior to the date that is 60 days after the Secretary publishes guidance with respect to the requirements of paragraphs (3) and (4) of subsection ([struck: d]), orthe construction of which begins prior to the date that is 60 days after the Secretary publishes guidance with respect to the requirements of paragraphs (3) and (4) of subsection ([inserted: e]), or
(a)(2)(B)(ii)(III)(III) (III)
which—which—
(a)(2)(B)(ii)(III)(aa)(aa) (aa)
satisfies the requirements of subsection ([struck: d])(3), andsatisfies the requirements of subsection ([inserted: e])(3), and
(a)(2)(B)(ii)(III)(bb)(bb) (bb)
with respect to the construction of such property, satisfies the requirements of subsection ([struck: d])(4),with respect to the construction of such property, satisfies the requirements of subsection ([inserted: e])(4),
(a)(2)(B)the applicable percentage shall be 30 percent.the applicable percentage shall be 30 percent.
(a)(2)(C)(C) [inserted: High-performance transmission property.—]
[inserted: Subject to paragraph (3)—]
(a)(2)(C)(i)(i) [inserted: Base rate.—]
[inserted: In the case of any high-performance transmission property which is not described in clause (ii)(I) and does not satisfy the requirements described in clause (ii)(II), the applicable percentage shall be 6 percent.]
(a)(2)(C)(ii)(ii) [inserted: Alternative rate.—]
[inserted: In the case of any high-performance transmission property—]
(a)(2)(C)(ii)(I)(I) [inserted: ]
[inserted: with a capacity of less than 1 megawatt, or]
(a)(2)(C)(ii)(II)(II) [inserted: ]
[inserted: which—]
(a)(2)(C)(ii)(II)(aa)(aa) [inserted: ]
[inserted: satisfies the requirements of subsection (e)(3), and]
(a)(2)(C)(ii)(II)(bb)(bb) [inserted: ]
[inserted: with respect to the construction of such property, satisfies the requirements of subsection (e)(4),]
(a)(2)(C)(ii)(II)[inserted: the applicable percentage shall be 30 percent.]
(a)(3)(3) Increase in credit rate in certain cases(3) Increase in credit rate in certain cases
(a)(3)(A)(A) Energy communities(A) Energy communities
(a)(3)(A)(i)(i) In general(i) In general
In the case of any qualified investment with respect to a qualified facility [struck: or] [struck: with respect to ]energy storage technology which is placed in service within an energy community (as defined in section 45(b)(11)(B), as applied without regard to clause (iv) thereof), for purposes of applying paragraph (2) with respect to such property or investment, the applicable percentage shall be increased by the applicable credit rate increase.In the case of any qualified investment with respect to a qualified facility [inserted: ,] energy storage technology[inserted: ,] [inserted: or high-performance transmission property ]which is placed in service within an energy community (as defined in section 45(b)(11)(B), as applied without regard to clause (iv) thereof), for purposes of applying paragraph (2) with respect to such property or investment, the applicable percentage shall be increased by the applicable credit rate increase.
(a)(3)(A)(ii)(ii) Applicable credit rate increase(ii) Applicable credit rate increase
For purposes of clause (i), the applicable credit rate increase shall be an amount equal to—For purposes of clause (i), the applicable credit rate increase shall be an amount equal to—
(a)(3)(A)(ii)(I)(I) (I)
in the case of any qualified investment with respect to a qualified facility described in paragraph (2)(A)(i) [struck: or] [struck: with respect to ]energy storage technology described in paragraph (2)(B)(i), 2 percentage points, andin the case of any qualified investment with respect to a qualified facility described in paragraph (2)(A)(i) [inserted: ,] energy storage technology described in paragraph (2)(B)(i), [inserted: or high-performance transmission property described in paragraph (]2[inserted: )(C)(i),] [inserted: 2 ]percentage points, and
(a)(3)(A)(ii)(II)(II) (II)
in the case of any qualified investment with respect to a qualified facility described in paragraph (2)(A)(ii) [struck: or] [struck: with respect to ]energy storage technology described in paragraph (2)(B)(ii), 10 percentage points.in the case of any qualified investment with respect to a qualified facility described in paragraph (2)(A)(ii) [inserted: ,] energy storage technology described in paragraph (2)(B)(ii), [inserted: or high-performance transmission property described in paragraph (2)(C)(ii), ]10 percentage points.
(a)(3)(B)(B) Domestic content(B) Domestic content
Rules similar to the rules of section 48(a)(12) shall apply, except that, for purposes of subparagraph (B) of such section and the application of rules similar to the rules of section 45(b)(9)(B), the adjusted percentage (as determined under section 45(b)(9)(C)) shall be determined as follows:Rules similar to the rules of section 48(a)(12) shall apply, except that, for purposes of subparagraph (B) of such section and the application of rules similar to the rules of section 45(b)(9)(B), the adjusted percentage (as determined under section 45(b)(9)(C)) shall be determined as follows:
(a)(3)(B)(i)(i) (i)
In the case of any qualified investment with respect to any qualified facility [struck: or] energy storage technology the construction of which begins before June 16, 2025, 40 percent (or, in the case of a qualified facility which is an offshore wind facility, 20 percent).In the case of any qualified investment with respect to any qualified facility [inserted: ,] energy storage technology[inserted: ,] [inserted: or high-performance transmission property ]the construction of which begins before June 16, 2025, 40 percent (or, in the case of a qualified facility which is an offshore wind facility, 20 percent).
(a)(3)(B)(ii)(ii) (ii)
In the case of any qualified investment with respect to any qualified facility [struck: or] energy storage technology the construction of which begins on or after June 16, 2025, and before January 1, 2026, 45 percent (or, in the case of a qualified facility which is an offshore wind facility, 27.5 percent).In the case of any qualified investment with respect to any qualified facility [inserted: ,] energy storage technology[inserted: ,] [inserted: or high-performance transmission property ]the construction of which begins on or after June 16, 2025, and before January 1, 2026, 45 percent (or, in the case of a qualified facility which is an offshore wind facility, 27.5 percent).
(a)(3)(B)(iii)(iii) (iii)
In the case of any qualified investment with respect to any qualified facility [struck: or] energy storage technology the construction of which begins during calendar year 2026, 50 percent (or, in the case of a qualified facility which is an offshore wind facility, 35 percent).In the case of any qualified investment with respect to any qualified facility [inserted: ,] energy storage technology[inserted: ,] [inserted: or high-performance transmission property ]the construction of which begins during calendar year 2026, 50 percent (or, in the case of a qualified facility which is an offshore wind facility, 35 percent).
(a)(3)(B)(iv)(iv) (iv)
In the case of any qualified investment with respect to any qualified facility [struck: or] energy storage technology the construction of which begins after December 31, 2026, 55 percent.In the case of any qualified investment with respect to any qualified facility [inserted: ,] energy storage technology[inserted: ,] [inserted: or high-performance transmission property ]the construction of which begins after December 31, 2026, 55 percent.
(b)(b) Qualified investment with respect to a qualified facility(b) Qualified investment with respect to a qualified facility
(b)(1)(1) In general(1) In general
For purposes of subsection (a), the qualified investment with respect to any qualified facility for any taxable year is the sum of—For purposes of subsection (a), the qualified investment with respect to any qualified facility for any taxable year is the sum of—

§ 48E(c)–(l)

(b)(1)(A)–(c)(1) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(c)(2)(2) Energy storage technology(2) Energy storage technology
For purposes of this section, the term “energy storage technology” has the meaning given such term in section 48(c)(6) (except that subparagraph (D) of such section shall not apply).For purposes of this section, the term “energy storage technology” has the meaning given such term in section 48(c)(6) (except that subparagraph (D) of such section shall not apply).
(c)(3)(3) Material assistance from prohibited foreign entities(3) Material assistance from prohibited foreign entities
The term “energy storage technology” shall not include any property the construction of which begins after December 31, 2025, if the construction of such property includes any material assistance from a prohibited foreign entity (as defined in section 7701(a)(52)).The term “energy storage technology” shall not include any property the construction of which begins after December 31, 2025, if the construction of such property includes any material assistance from a prohibited foreign entity (as defined in section 7701(a)(52)).
(d)(d) [inserted: Qualified investment with respect to high-Performance transmission property.—]
(d)(1)(1) [inserted: Qualified investment.—]
[inserted: For purposes of subsection (a), the qualified investment with respect to high-performance transmission property for any taxable year is the basis of any high-performance transmission property placed in service by the taxpayer during such taxable year.]
(d)(2)(2) [inserted: High-performance transmission property.—]
(d)(2)(A)(A) [inserted: In general.—]
[inserted: For purposes of this section, the term “high-performance transmission property” means property used in a right-of-way optimization project or a reconductoring project.]
(d)(2)(B)(B) [inserted: Installation expenses included.—]
[inserted: For purposes of determining the credit under subsection (a), the term “high-performance transmission property” shall include amounts paid or incurred by the taxpayer for installation of such property.]
(d)(2)(C)(C) [inserted: Right-of-way optimization project and reconductoring project defined.—]
[inserted: For purposes of subparagraph (A), the terms “right-of-way optimization project” and “reconductoring project” have the meaning given such terms, respectively, in section 2 of the Lowering Energy Costs through Grid Modernization Act.]
(d)(3)(3) [inserted: Material assistance from prohibited foreign entities.—]
[inserted: The term “high-performance transmission property” shall not include any property the construction of which begins after December 31, 2025, if the construction of such property includes any material assistance from a prohibited foreign entity (as defined in section 7701(a)(52)).]
(e)[struck: (d)] Special rules[inserted: (e)] Special rules
(e)(1)(1) Certain progress expenditure rules made applicable(1) Certain progress expenditure rules made applicable
Rules similar to the rules of subsections (c)(4) and (d) of section 46 (as in effect on the day before the date of the enactment of the Revenue Reconciliation Act of 1990) shall apply for purposes of subsection (a).Rules similar to the rules of subsections (c)(4) and (d) of section 46 (as in effect on the day before the date of the enactment of the Revenue Reconciliation Act of 1990) shall apply for purposes of subsection (a).
(e)(2)(2) Special rule for property financed by subsidized energy financing or private activity bonds(2) Special rule for property financed by subsidized energy financing or private activity bonds
Rules similar to the rules of section 45(b)(3) shall apply.Rules similar to the rules of section 45(b)(3) shall apply.
(e)(3)(3) Prevailing wage requirements(3) Prevailing wage requirements
Rules similar to the rules of section 48(a)(10) shall apply.Rules similar to the rules of section 48(a)(10) shall apply.
(e)(4)(4) Apprenticeship requirements(4) Apprenticeship requirements
Rules similar to the rules of section 45(b)(8) shall apply.Rules similar to the rules of section 45(b)(8) shall apply.
(e)(5)(5) Domestic content requirement for elective payment(5) Domestic content requirement for elective payment
In the case of a taxpayer making an election under section 6417 with respect to a credit under this section, rules similar to the rules of section 45Y(g)(12) shall apply.In the case of a taxpayer making an election under section 6417 with respect to a credit under this section, rules similar to the rules of section 45Y(g)(12) shall apply.
(e)(6)(6) Restrictions relating to prohibited foreign entities(6) Restrictions relating to prohibited foreign entities
(e)(6)(A)(A) In general(A) In general
No credit shall be determined under subsection (a) for any taxable year if the taxpayer is—No credit shall be determined under subsection (a) for any taxable year if the taxpayer is—
(e)(6)(A)(i)(i) (i)
a specified foreign entity (as defined in section 7701(a)(51)(B)), ora specified foreign entity (as defined in section 7701(a)(51)(B)), or
(e)(6)(A)(ii)(ii) (ii)
a foreign-influenced entity (as defined in section 7701(a)(51)(D), without regard to clause (i)(II) thereof).a foreign-influenced entity (as defined in section 7701(a)(51)(D), without regard to clause (i)(II) thereof).
(e)(6)(B)(B) Effective control(B) Effective control
In the case of a taxpayer for which section 7701(a)(51)(D)(i)(II) is determined to apply for any taxable year, no credit shall be determined under subsection (a) for such taxable year if such determination relates to a qualified facility described in subsection (b)(3) [struck: or] energy storage technology described in subsection (c)(2).In the case of a taxpayer for which section 7701(a)(51)(D)(i)(II) is determined to apply for any taxable year, no credit shall be determined under subsection (a) for such taxable year if such determination relates to a qualified facility described in subsection (b)(3) [inserted: ,] energy storage technology described in subsection (c)(2)[inserted: , or high-performance transmission property described in subsection (d)(2)].
(f)[struck: (e)] Credit phase-out[inserted: (f)] Credit phase-out
(f)(1)(1) In general(1) In general
Subject to paragraph (4), the amount of the clean electricity investment credit under subsection (a) for any qualified investment with respect to any qualified facility [struck: or] energy storage technology the construction of which begins during a calendar year described in paragraph (2) shall be equal to the product of—Subject to paragraph (4), the amount of the clean electricity investment credit under subsection (a) for any qualified investment with respect to any qualified facility [inserted: ,] energy storage technology[inserted: ,] [inserted: or high-performance transmission property ]the construction of which begins during a calendar year described in paragraph (2) shall be equal to the product of—
(f)(1)(A)(A) (A)
the amount of the credit determined under subsection (a) without regard to this subsection, multiplied bythe amount of the credit determined under subsection (a) without regard to this subsection, multiplied by
(f)(1)(B)(B) (B)
the phase-out percentage under paragraph (2).the phase-out percentage under paragraph (2).
(f)(2)(2) Phase-out percentage(2) Phase-out percentage
The phase-out percentage under this paragraph is equal to—The phase-out percentage under this paragraph is equal to—
(f)(2)(A)(A) (A)
for any qualified investment with respect to any qualified facility [struck: or] energy storage technology the construction of which begins during the first calendar year following the applicable year, 100 percent,for any qualified investment with respect to any qualified facility [inserted: ,] energy storage technology[inserted: ,] [inserted: or high-performance transmission property ]the construction of which begins during the first calendar year following the applicable year, 100 percent,
(f)(2)(B)(B) (B)
for any qualified investment with respect to any qualified facility [struck: or] energy storage technology the construction of which begins during the second calendar year following the applicable year, 75 percent,for any qualified investment with respect to any qualified facility [inserted: ,] energy storage technology[inserted: ,] [inserted: or high-performance transmission property ]the construction of which begins during the second calendar year following the applicable year, 75 percent,
(f)(2)(C)(C) (C)
for any qualified investment with respect to any qualified facility [struck: or] energy storage technology the construction of which begins during the third calendar year following the applicable year, 50 percent, andfor any qualified investment with respect to any qualified facility [inserted: ,] energy storage technology[inserted: ,] [inserted: or high-performance transmission property ]the construction of which begins during the third calendar year following the applicable year, 50 percent, and
(f)(2)(D)(D) (D)
for any qualified investment with respect to any qualified facility [struck: or] energy storage technology the construction of which begins during any calendar year subsequent to the calendar year described in subparagraph (C), 0 percent.for any qualified investment with respect to any qualified facility [inserted: ,] energy storage technology[inserted: ,] [inserted: or high-performance transmission property ]the construction of which begins during any calendar year subsequent to the calendar year described in subparagraph (C), 0 percent.
(f)(3)(3) Applicable year(3) Applicable year
For purposes of this subsection, the term “applicable year” has the same meaning given such term in section 45Y(d)(3).For purposes of this subsection, the term “applicable year” has the same meaning given such term in section 45Y(d)(3).
(f)(4)(4) Termination for wind and solar facilities(4) Termination for wind and solar facilities
(f)(4)(A)(A) In general(A) In general
This section shall not apply to any qualified property placed in service by the taxpayer after December 31, 2027, which is part of an applicable facility.This section shall not apply to any qualified property placed in service by the taxpayer after December 31, 2027, which is part of an applicable facility.
(f)(4)(B)(B) Applicable facility(B) Applicable facility
For purposes of this paragraph, the term “applicable facility” means a qualified facility which—For purposes of this paragraph, the term “applicable facility” means a qualified facility which—
(f)(4)(B)(i)(i) (i)
uses wind to produce electricity (within the meaning of such term as used in section 45(d)(1), as determined without regard to any requirement under such section with respect to the date on which construction of property begins), oruses wind to produce electricity (within the meaning of such term as used in section 45(d)(1), as determined without regard to any requirement under such section with respect to the date on which construction of property begins), or
(f)(4)(B)(ii)(ii) (ii)
uses solar energy to produce electricity (within the meaning of such term as used in section 45(d)(4), as determined without regard to any requirement under such section with respect to the date on which construction of property begins).uses solar energy to produce electricity (within the meaning of such term as used in section 45(d)(4), as determined without regard to any requirement under such section with respect to the date on which construction of property begins).
(f)(4)(C)(C) Exception(C) Exception
This paragraph shall not apply with respect to any energy storage technology which is placed in service at any applicable facility.This paragraph shall not apply with respect to any energy storage technology [inserted: or any high-performance transmission property ]which is placed in service at any applicable facility.
(g)[struck: (f)] Greenhouse gas[inserted: (g)] Greenhouse gas
In this section, the term “greenhouse gas” has the same meaning given such term under section 45Y(e)(2).In this section, the term “greenhouse gas” has the same meaning given such term under section 45Y(e)(2).
(h)[struck: (g)] Recapture of credit[inserted: (h)] Recapture of credit
For purposes of section 50, if the Secretary determines that the greenhouse gas emissions rate for a qualified facility is greater than 10 grams of CO2e per KWh, any property for which a credit was allowed under this section with respect to such facility shall cease to be investment credit property in the taxable year in which the determination is made.For purposes of section 50, if the Secretary determines that the greenhouse gas emissions rate for a qualified facility is greater than 10 grams of CO2e per KWh, any property for which a credit was allowed under this section with respect to such facility shall cease to be investment credit property in the taxable year in which the determination is made.
(i)[struck: (h)] Special rules for certain facilities placed in service in connection with low-income communities[inserted: (i)] Special rules for certain facilities placed in service in connection with low-income communities
(i)(1)(1) In general(1) In general
In the case of any applicable facility with respect to which the Secretary makes an allocation of environmental justice capacity limitation under paragraph (4)—In the case of any applicable facility with respect to which the Secretary makes an allocation of environmental justice capacity limitation under paragraph (4)—
(i)(1)(A)(A) (A)
the applicable percentage otherwise determined under subsection (a)(2) with respect to any eligible property which is part of such facility shall be increased by—the applicable percentage otherwise determined under subsection (a)(2) with respect to any eligible property which is part of such facility shall be increased by—
(i)(1)(A)(i)(i) (i)
in the case of a facility described in subclause (I) of paragraph (2)(A)(iii) and not described in subclause (II) of such paragraph, 10 percentage points, andin the case of a facility described in subclause (I) of paragraph (2)(A)(iii) and not described in subclause (II) of such paragraph, 10 percentage points, and
(i)(1)(A)(ii)(ii) (ii)
in the case of a facility described in subclause (II) of paragraph (2)(A)(iii), 20 percentage points, andin the case of a facility described in subclause (II) of paragraph (2)(A)(iii), 20 percentage points, and
(i)(1)(B)(B) (B)
the increase in the credit determined under subsection (a) by reason of this subsection for any taxable year with respect to all property which is part of such facility shall not exceed the amount which bears the same ratio to the amount of such increase (determined without regard to this subparagraph) as—the increase in the credit determined under subsection (a) by reason of this subsection for any taxable year with respect to all property which is part of such facility shall not exceed the amount which bears the same ratio to the amount of such increase (determined without regard to this subparagraph) as—
(i)(1)(B)(i)(i) (i)
the environmental justice capacity limitation allocated to such facility, bears tothe environmental justice capacity limitation allocated to such facility, bears to
(i)(1)(B)(ii)(ii) (ii)
the total megawatt nameplate capacity of such facility, as measured in direct current.the total megawatt nameplate capacity of such facility, as measured in direct current.
(i)(2)(2) Applicable facility(2) Applicable facility
For purposes of this subsection—For purposes of this subsection—
(i)(2)(A)(A) In general(A) In general
The term “applicable facility” means any qualified facility—The term “applicable facility” means any qualified facility—
(i)(2)(A)(i)(i) (i)
which is not described in section 45Y(b)(2)(B),which is not described in section 45Y(b)(2)(B),
(i)(2)(A)(ii)(ii) (ii)
which has a maximum net output of less than 5 megawatts (as measured in alternating current), andwhich has a maximum net output of less than 5 megawatts (as measured in alternating current), and
(i)(2)(A)(iii)(iii) (iii)
which—which—
(i)(2)(A)(iii)(I)(I) (I)
is located in a low-income community (as defined in section 45D(e)) or on Indian land (as defined in section 2601(2) of the Energy Policy Act of 1992 (25 U.S.C. 3501(2))), oris located in a low-income community (as defined in section 45D(e)) or on Indian land (as defined in section 2601(2) of the Energy Policy Act of 1992 (25 U.S.C. 3501(2))), or
(i)(2)(A)(iii)(II)(II) (II)
is part of a qualified low-income residential building project or a qualified low-income economic benefit project.is part of a qualified low-income residential building project or a qualified low-income economic benefit project.
(i)(2)(B)(B) Qualified low-income residential building project(B) Qualified low-income residential building project
A facility shall be treated as part of a qualified low-income residential building project if—A facility shall be treated as part of a qualified low-income residential building project if—
(i)(2)(B)(i)(i) (i)
such facility is installed on a residential rental building which participates in a covered housing program (as defined in section 41411(a) of the Violence Against Women Act of 1994 (34 U.S.C. 12491(a)(3)),1 a housing assistance program administered by the Department of Agriculture under title V of the Housing Act of 1949, a housing program administered by a tribally designated housing entity (as defined in section 4(22) of the Native American Housing Assistance and Self-Determination Act of 1996 (25 U.S.C. 4103(22))) or such other affordable housing programs as the Secretary may provide, andsuch facility is installed on a residential rental building which participates in a covered housing program (as defined in section 41411(a) of the Violence Against Women Act of 1994 (34 U.S.C. 12491(a)(3)),1 a housing assistance program administered by the Department of Agriculture under title V of the Housing Act of 1949, a housing program administered by a tribally designated housing entity (as defined in section 4(22) of the Native American Housing Assistance and Self-Determination Act of 1996 (25 U.S.C. 4103(22))) or such other affordable housing programs as the Secretary may provide, and
(i)(2)(B)(ii)(ii) (ii)
the financial benefits of the electricity produced by such facility are allocated equitably among the occupants of the dwelling units of such building.the financial benefits of the electricity produced by such facility are allocated equitably among the occupants of the dwelling units of such building.
(i)(2)(C)(C) Qualified low-income economic benefit project(C) Qualified low-income economic benefit project
A facility shall be treated as part of a qualified low-income economic benefit project if at least 50 percent of the financial benefits of the electricity produced by such facility are provided to households with income of—A facility shall be treated as part of a qualified low-income economic benefit project if at least 50 percent of the financial benefits of the electricity produced by such facility are provided to households with income of—
(i)(2)(C)(i)(i) (i)
less than 200 percent of the poverty line (as defined in section 36B(d)(3)(A)) applicable to a family of the size involved, orless than 200 percent of the poverty line (as defined in section 36B(d)(3)(A)) applicable to a family of the size involved, or
(i)(2)(C)(ii)(ii) (ii)
less than 80 percent of area median gross income (as determined under section 142(d)(2)(B)).less than 80 percent of area median gross income (as determined under section 142(d)(2)(B)).
(i)(2)(D)(D) Financial benefit(D) Financial benefit
For purposes of subparagraphs (B) and (C), electricity acquired at a below-market rate shall not fail to be taken into account as a financial benefit.For purposes of subparagraphs (B) and (C), electricity acquired at a below-market rate shall not fail to be taken into account as a financial benefit.
(i)(3)(3) Eligible property(3) Eligible property
For purposes of this subsection, the term “eligible property” means a qualified investment with respect to any applicable facility.For purposes of this subsection, the term “eligible property” means a qualified investment with respect to any applicable facility.
(i)(4)(4) Allocations(4) Allocations
(i)(4)(A)(A) In general(A) In general
Not later than January 1, 2025, the Secretary shall establish a program to allocate amounts of environmental justice capacity limitation to applicable facilities. In establishing such program and to carry out the purposes of this subsection, the Secretary shall provide procedures to allow for an efficient allocation process, including, when determined appropriate, consideration of multiple projects in a single application if such projects will be placed in service by a single taxpayer.Not later than January 1, 2025, the Secretary shall establish a program to allocate amounts of environmental justice capacity limitation to applicable facilities. In establishing such program and to carry out the purposes of this subsection, the Secretary shall provide procedures to allow for an efficient allocation process, including, when determined appropriate, consideration of multiple projects in a single application if such projects will be placed in service by a single taxpayer.
(i)(4)(B)(B) Limitation(B) Limitation
The amount of environmental justice capacity limitation allocated by the Secretary under subparagraph (A) during any calendar year shall not exceed the annual capacity limitation with respect to such year.The amount of environmental justice capacity limitation allocated by the Secretary under subparagraph (A) during any calendar year shall not exceed the annual capacity limitation with respect to such year.
(i)(4)(C)(C) Annual capacity limitation(C) Annual capacity limitation
For purposes of this paragraph, the term “annual capacity limitation” means 1.8 gigawatts of direct current capacity for each calendar year during the period beginning on January 1, 2025, and ending on December 31 of the applicable year (as defined in section 45Y(d)(3)), and zero thereafter.For purposes of this paragraph, the term “annual capacity limitation” means 1.8 gigawatts of direct current capacity for each calendar year during the period beginning on January 1, 2025, and ending on December 31 of the applicable year (as defined in section 45Y(d)(3)), and zero thereafter.
(i)(4)(D)(D) Carryover of unused limitation(D) Carryover of unused limitation
(i)(4)(D)(i)(i) In general(i) In general
If the annual capacity limitation for any calendar year exceeds the aggregate amount allocated for such year under this paragraph, such limitation for the succeeding calendar year shall be increased by the amount of such excess. No amount may be carried under the preceding sentence to any calendar year after the third calendar year following the applicable year (as defined in section 45Y(d)(3)).If the annual capacity limitation for any calendar year exceeds the aggregate amount allocated for such year under this paragraph, such limitation for the succeeding calendar year shall be increased by the amount of such excess. No amount may be carried under the preceding sentence to any calendar year after the third calendar year following the applicable year (as defined in section 45Y(d)(3)).
(i)(4)(D)(ii)(ii) Carryover from section 48 for calendar year 2025(ii) Carryover from section 48 for calendar year 2025
If the annual capacity limitation for calendar year 2024 under section 48(e)(4)(D) exceeds the aggregate amount allocated for such year under such section, such excess amount may be carried over and applied to the annual capacity limitation under this subsection for calendar year 2025. The annual capacity limitation for calendar year 2025 shall be increased by the amount of such excess.If the annual capacity limitation for calendar year 2024 under section 48(e)(4)(D) exceeds the aggregate amount allocated for such year under such section, such excess amount may be carried over and applied to the annual capacity limitation under this subsection for calendar year 2025. The annual capacity limitation for calendar year 2025 shall be increased by the amount of such excess.
(i)(4)(E)(E) Placed in service deadline(E) Placed in service deadline
(i)(4)(E)(i)(i) In general(i) In general
Paragraph (1) shall not apply with respect to any property which is placed in service after the date that is 4 years after the date of the allocation with respect to the facility of which such property is a part.Paragraph (1) shall not apply with respect to any property which is placed in service after the date that is 4 years after the date of the allocation with respect to the facility of which such property is a part.
(i)(4)(E)(ii)(ii) Application of carryover(ii) Application of carryover
Any amount of environmental justice capacity limitation which expires under clause (i) during any calendar year shall be taken into account as an excess described in subparagraph (D)(i) (or as an increase in such excess) for such calendar year, subject to the limitation imposed by the last sentence of such subparagraph.Any amount of environmental justice capacity limitation which expires under clause (i) during any calendar year shall be taken into account as an excess described in subparagraph (D)(i) (or as an increase in such excess) for such calendar year, subject to the limitation imposed by the last sentence of such subparagraph.
(i)(5)(5) Recapture(5) Recapture
The Secretary shall, by regulations or other guidance, provide for recapturing the benefit of any increase in the credit allowed under subsection (a) by reason of this subsection with respect to any property which ceases to be property eligible for such increase (but which does not cease to be investment credit property within the meaning of section 50(a)). The period and percentage of such recapture shall be determined under rules similar to the rules of section 50(a). To the extent provided by the Secretary, such recapture may not apply with respect to any property if, within 12 months after the date the taxpayer becomes aware (or reasonably should have become aware) of such property ceasing to be property eligible for such increase, the eligibility of such property for such increase is restored. The preceding sentence shall not apply more than once with respect to any facility.The Secretary shall, by regulations or other guidance, provide for recapturing the benefit of any increase in the credit allowed under subsection (a) by reason of this subsection with respect to any property which ceases to be property eligible for such increase (but which does not cease to be investment credit property within the meaning of section 50(a)). The period and percentage of such recapture shall be determined under rules similar to the rules of section 50(a). To the extent provided by the Secretary, such recapture may not apply with respect to any property if, within 12 months after the date the taxpayer becomes aware (or reasonably should have become aware) of such property ceasing to be property eligible for such increase, the eligibility of such property for such increase is restored. The preceding sentence shall not apply more than once with respect to any facility.
(j)[struck: (i)] Denial of credit for expenditures for wind and solar leasing arrangements[inserted: (j)] Denial of credit for expenditures for wind and solar leasing arrangements
No credit shall be determined under this section for any qualified investment during the taxable year with respect to property described in paragraph (1) or (4) of section 25D(d) (as applied by substituting “lessee” for “taxpayer”) if the taxpayer rents or leases such property to a third party during such taxable year.No credit shall be determined under this section for any qualified investment during the taxable year with respect to property described in paragraph (1) or (4) of section 25D(d) (as applied by substituting “lessee” for “taxpayer”) if the taxpayer rents or leases such property to a third party during such taxable year.
(k)[struck: (j)] Application to qualified fuel cell property[inserted: (k)] Application to qualified fuel cell property
For purposes of this section, in the case of any qualified fuel cell property (as defined in section 48(c)(1), as applied without regard to subparagraph (E) thereof)—For purposes of this section, in the case of any qualified fuel cell property (as defined in section 48(c)(1), as applied without regard to subparagraph (E) thereof)—
(k)(1)(1) (1)
subsection (b)(3)(A) shall be applied without regard to clause (iii) thereof,subsection (b)(3)(A) shall be applied without regard to clause (iii) thereof,
(k)(2)(2) (2)
for purposes of subsection (a)(1), the applicable percentage shall be 30 percent and such percentage shall not be increased or otherwise adjusted by any other provision of this section, andfor purposes of subsection (a)(1), the applicable percentage shall be 30 percent and such percentage shall not be increased or otherwise adjusted by any other provision of this section, and
(k)(3)(3) (3)
subsection ([struck: g]) shall not apply.subsection ([inserted: h]) shall not apply.
(l)[struck: (k)] Guidance[inserted: (l)] Guidance
Not later than January 1, 2025, the Secretary shall issue guidance regarding implementation of this section.Not later than January 1, 2025, the Secretary shall issue guidance regarding implementation of this section.

26 U.S.C. § 49 At-risk rules

+4 −2Shown
More for 26 U.S.C. § 49
Read § 49Only this section
3 changes the bill asks for here, 3 carried out
  1. Carried out:

    in clause (vii), by striking and at the end,

  2. Carried out:

    in clause (viii), by striking the period at the end and inserting , and, and

  3. Carried out:

    by adding at the end the following new clause:(ix) the basis of any high-performance transmission property under section 48E..

§ 49(a)(1)Certain nonrecourse financing excluded from credit base(C)–(D)

Start of § 49 to (a)(1)(C)(v) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(C)(vi)(vi) (vi)
the basis of any qualified property (as defined in subsection (b)(2) of section 48D) which is part of an advanced manufacturing facility (as defined in subsection (b)(3) of such section),the basis of any qualified property (as defined in subsection (b)(2) of section 48D) which is part of an advanced manufacturing facility (as defined in subsection (b)(3) of such section),
(C)(vii)(vii) (vii)
the basis of any qualified property which is part of a qualified facility under section 48E,[struck: and]the basis of any qualified property which is part of a qualified facility under section 48E,
(C)(viii)(viii) (viii)
the basis of any energy storage technology under section 48E[struck: .]the basis of any energy storage technology under section 48E[inserted: , and]
(C)(ix)(ix) [inserted: ]
[inserted: the basis of any high-performance transmission property under section 48E.]
(D)(D) Nonqualified nonrecourse financing(D) Nonqualified nonrecourse financing
(D)(i)(i) In general(i) In general
For purposes of this paragraph and paragraph (2), the term “nonqualified nonrecourse financing” means any nonrecourse financing which is not qualified commercial financing.For purposes of this paragraph and paragraph (2), the term “nonqualified nonrecourse financing” means any nonrecourse financing which is not qualified commercial financing.

Rest of § 49 unchanged

26 U.S.C. § 168 Accelerated cost recovery system

+1 −1Shown
More for 26 U.S.C. § 168
Read § 168Only this section
1 change the bill asks for here, 1 carried out
  1. Carried out:

    Section 168(e)(3)(B)(viii) of such Code is amended by striking or any energy storage technology (as defined in subsection (c)(2) of such section) and inserting , any energy storage technology (as defined in subsection (c)(2) of such section), or any high-performance transmission property (as defined in subsection (d)(2) of such section).

§ 168(e)(3)Classification of certain property(B)–(C)

Start of § 168 to (e)(3)(B)(vi)(II) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(B)(vii)(vii) (vii)
any machinery or equipment (other than any grain bin, cotton ginning asset, fence, or other land improvement) which is used in a farming business (as defined in section 263A(e)(4)), the original use of which commences with the taxpayer after December 31, 2017, andany machinery or equipment (other than any grain bin, cotton ginning asset, fence, or other land improvement) which is used in a farming business (as defined in section 263A(e)(4)), the original use of which commences with the taxpayer after December 31, 2017, and
(B)(viii)(viii) (viii)
any qualified facility (as defined in section 45Y(b)(1)(A)), any qualified property (as defined in subsection (b)(2) of section 48E) which is a qualified investment (as defined in subsection (b)(1) of such section), [struck: or] any energy storage technology (as defined in subsection (c)(2) of such section).any qualified facility (as defined in section 45Y(b)(1)(A)), any qualified property (as defined in subsection (b)(2) of section 48E) which is a qualified investment (as defined in subsection (b)(1) of such section), [inserted: ,] any energy storage technology (as defined in subsection (c)(2) of such section)[inserted: , or any high-performance transmission property (as defined in subsection (d)(2) of such section)].
(B)Nothing in any provision of law shall be construed to treat property as not being described in subclause (I) or (II) of clause (vi) 1 by reason of being public utility property.Nothing in any provision of law shall be construed to treat property as not being described in subclause (I) or (II) of clause (vi) 1 by reason of being public utility property.
(C)(C) 7-year property(C) 7-year property
The term “7-year property” includes—The term “7-year property” includes—

Rest of § 168 unchanged

26 U.S.C. § 7701 Definitions

+20 −16Shown
More for 26 U.S.C. § 7701
Read § 7701Only this section
16 changes the bill asks for here, 16 carried out
  1. Carried out:

    in clause (i)(II)(aa), by striking or energy storage technology and inserting , energy storage technology, or high-performance transmission property, and

  2. Carried out:

    in subclause (I)(aa), by striking or energy storage and inserting energy storage technology, or high-performance transmission property,

  3. Carried out:

    in item (aa), by inserting or any high-performance transmission property produced by the taxpayer before the comma at the end, and

  4. Carried out:

    in item (ee), by striking or energy storage technology and inserting , energy storage technology, or high-performance transmission property, and

  5. Carried out:

    by striking , energy storage technology, each place it appears and inserting , energy storage technology, high-performance transmission property, in each such place,

  6. Carried out:

    by striking any energy storage technology, and inserting any energy storage technology, any high-performance transmission property,, and

  7. Carried out:

    by striking or energy storage technology and inserting , energy storage technology, or high-performance transmission property, and

  8. Carried out:

    in subparagraph (I), by adding at the end the following new clause:(vii) High-performance transmission property.— The term “high-performance transmission property” has the same meaning given such term under section 48E(d)(2)..

  9. Carried out:

    in subparagraph (A), by striking or energy storage technology and inserting , energy storage technology, or high-performance transmission property,

  10. Carried out:

    in clause (ii), by inserting or high-performance transmission property after energy storage technology, and

  11. Carried out:

    in the subparagraph heading, by striking and energy storage technology and inserting , energy storage technology, and high-performance transmission property,

  12. Carried out:

    by striking or energy storage technology each place it appears and inserting , energy storage technology, or high-performance transmission property in each such place, and

  13. Carried out:

    in the clause heading, by striking and energy storage technology and inserting , energy storage technology, and high-performance transmission property,

  14. Carried out:

    in clause (iii)(II), by striking or energy storage technology and inserting , energy storage technology, or high-performance transmission property, and

  15. Carried out:

    in clause (v)(II), by striking or energy storage technology and inserting , energy storage technology, or high-performance transmission property, and

  16. Carried out:

    in subparagraph (E), by adding at the end the following new clause:(v) High-performance transmission property.— The term “high-performance transmission property” has the same meaning given such term under section 48E(d)(2)..

§ 7701(a)(51)(D)Foreign-influenced entity(i)–(ii)

Start of § 7701 to (a)(51)(D)(i)(I)(dd) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(i)(II)(II) (II)
which, during the previous taxable year, made a payment to a specified foreign entity pursuant to a contract, agreement, or other arrangement which entitles such specified foreign entity (or an entity related to such specified foreign entity) to exercise effective control over—which, during the previous taxable year, made a payment to a specified foreign entity pursuant to a contract, agreement, or other arrangement which entitles such specified foreign entity (or an entity related to such specified foreign entity) to exercise effective control over—
(i)(II)(aa)(aa) (aa)
any qualified facility [struck: or] energy storage technology of the taxpayer (or any person related to the taxpayer), orany qualified facility [inserted: ,] energy storage technology[inserted: ,] [inserted: or high-performance transmission property ]of the taxpayer (or any person related to the taxpayer), or
(i)(II)(bb)(bb) (bb)
with respect to any eligible component produced by the taxpayer (or any person related to the taxpayer)—with respect to any eligible component produced by the taxpayer (or any person related to the taxpayer)—
(i)(II)(bb)(AA)(AA) (AA)
the extraction, processing, or recycling of any applicable critical mineral, orthe extraction, processing, or recycling of any applicable critical mineral, or
(i)(II)(bb)(BB)(BB) (BB)
the production of an eligible component which is not an applicable critical mineral.the production of an eligible component which is not an applicable critical mineral.
(ii)(ii) Effective control(ii) Effective control
(ii)(I)(I) In general(I) In general
(ii)(I)(aa)(aa) General rule(aa) General rule
Subject to subclause (II), for purposes of clause (i)(II), the term “effective control” means 1 or more agreements or arrangements similar to those described in subclauses (II) and (III) which provide 1 or more contractual counterparties of a taxpayer with specific authority over key aspects of the production of eligible components, energy generation in a qualified facility, [struck: or ]energy storage which are not included in the measures of control through authority, ownership, or debt held which are described in clause (i)(I).Subject to subclause (II), for purposes of clause (i)(II), the term “effective control” means 1 or more agreements or arrangements similar to those described in subclauses (II) and (III) which provide 1 or more contractual counterparties of a taxpayer with specific authority over key aspects of the production of eligible components, energy generation in a qualified facility, energy storage [inserted: technology, or high-performance transmission property ]which are not included in the measures of control through authority, ownership, or debt held which are described in clause (i)(I).
(ii)(I)(bb)(bb) Guidance(bb) Guidance
The Secretary shall issue such guidance as is necessary to carry out the purposes of this clause, including the establishment of rules to prevent entities from evading, circumventing, or abusing the application of the restrictions described subparagraph (C) and subclauses (II) and (III) of this clause through a contract, agreement, or other arrangement.The Secretary shall issue such guidance as is necessary to carry out the purposes of this clause, including the establishment of rules to prevent entities from evading, circumventing, or abusing the application of the restrictions described subparagraph (C) and subclauses (II) and (III) of this clause through a contract, agreement, or other arrangement.
(ii)(II)(II) Application of rules prior to issuance of guidance(II) Application of rules prior to issuance of guidance
During any period prior to the date that the guidance described in subclause (I)(bb) is issued by the Secretary, for purposes of clause (i)(II), the term “effective control” means the unrestricted contractual right of a contractual counterparty to—During any period prior to the date that the guidance described in subclause (I)(bb) is issued by the Secretary, for purposes of clause (i)(II), the term “effective control” means the unrestricted contractual right of a contractual counterparty to—
(ii)(II)(aa)(aa) (aa)
determine the quantity or timing of production of an eligible component produced by the taxpayer,determine the quantity or timing of production of an eligible component produced by the taxpayer[inserted: or any high-performance transmission property produced by the taxpayer],
(ii)(II)(bb)(bb) (bb)
determine the amount or timing of activities related to the production of electricity undertaken at a qualified facility of the taxpayer or the storage of electrical energy in energy storage technology of the taxpayer,determine the amount or timing of activities related to the production of electricity undertaken at a qualified facility of the taxpayer or the storage of electrical energy in energy storage technology of the taxpayer,
(ii)(II)(cc)(cc) (cc)
determine which entity may purchase or use the output of a production unit of the taxpayer that produces eligible components,determine which entity may purchase or use the output of a production unit of the taxpayer that produces eligible components,
(ii)(II)(dd)(dd) (dd)
determine which entity may purchase or use the output of a qualified facility of the taxpayer,determine which entity may purchase or use the output of a qualified facility of the taxpayer,
(ii)(II)(ee)(ee) (ee)
restrict access to data critical to production or storage of energy undertaken at a qualified facility of the taxpayer, or to the site of production or any part of a qualified facility [struck: or] energy storage technology of the taxpayer, to the personnel or agents of such contractual counterparty, orrestrict access to data critical to production or storage of energy undertaken at a qualified facility of the taxpayer, or to the site of production or any part of a qualified facility [inserted: ,] energy storage technology[inserted: ,] [inserted: or high-performance transmission property ]of the taxpayer, to the personnel or agents of such contractual counterparty, or
(ii)(II)(ff)(ff) (ff)
on an exclusive basis, maintain, repair, or operate any plant or equipment which is necessary to the production by the taxpayer of eligible components or electricity.on an exclusive basis, maintain, repair, or operate any plant or equipment which is necessary to the production by the taxpayer of eligible components or electricity.
(ii)(III)(III) Licensing and other agreements(III) Licensing and other agreements
(ii)(III)(aa)(aa) In general(aa) In general
In addition to subclause (II), for purposes of clause (i)(II), the term “effective control” means, with respect to a licensing agreement for the provision of intellectual property (or any other contract, agreement or other arrangement entered into with a contractual counterparty related to such licensing agreement) with respect to a qualified facility, energy storage technology, or the production of an eligible component, any of the following:In addition to subclause (II), for purposes of clause (i)(II), the term “effective control” means, with respect to a licensing agreement for the provision of intellectual property (or any other contract, agreement or other arrangement entered into with a contractual counterparty related to such licensing agreement) with respect to a qualified facility, energy storage technology, [inserted: high-performance transmission property, ]or the production of an eligible component, any of the following:
(ii)(III)(aa)(AA)(AA) (AA)
A contractual right retained by the contractual counterparty to specify or otherwise direct 1 or more sources of components, subcomponents, or applicable critical minerals utilized in a qualified facility, energy storage technology, or in the production of an eligible component.A contractual right retained by the contractual counterparty to specify or otherwise direct 1 or more sources of components, subcomponents, or applicable critical minerals utilized in a qualified facility, energy storage technology, [inserted: high-performance transmission property, ]or in the production of an eligible component.
(ii)(III)(aa)(BB)(BB) (BB)
A contractual right retained by the contractual counterparty to direct the operation of any qualified facility, any energy storage technology, or any production unit that produces an eligible component.A contractual right retained by the contractual counterparty to direct the operation of any qualified facility, any energy storage technology, [inserted: any high-performance transmission property, ]or any production unit that produces an eligible component.
(ii)(III)(aa)(CC)(CC) (CC)
A contractual right retained by the contractual counterparty to limit the taxpayer’s utilization of intellectual property related to the operation of a qualified facility [struck: or] energy storage technology, or in the production of an eligible component.A contractual right retained by the contractual counterparty to limit the taxpayer’s utilization of intellectual property related to the operation of a qualified facility [inserted: ,] energy storage technology, or [inserted: high-performance transmission property, or ]in the production of an eligible component.
(ii)(III)(aa)(DD)(DD) (DD)
A contractual right retained by the contractual counterparty to receive royalties under the licensing agreement or any similar agreement (or payments under any related agreement) beyond the 10th year of the agreement (including modifications or extensions thereof).A contractual right retained by the contractual counterparty to receive royalties under the licensing agreement or any similar agreement (or payments under any related agreement) beyond the 10th year of the agreement (including modifications or extensions thereof).
(ii)(III)(aa)(EE)(EE) (EE)
A contractual right retained by the contractual counterparty to direct or otherwise require the taxpayer to enter into an agreement for the provision of services for a duration longer than 2 years (including any modifications or extensions thereof).A contractual right retained by the contractual counterparty to direct or otherwise require the taxpayer to enter into an agreement for the provision of services for a duration longer than 2 years (including any modifications or extensions thereof).

§ 7701(a)When used in this title, where not otherwise distinctly expressed or manifestly…(51)–(52)

(a)(51)(D)(ii)(III)(aa)(FF)–(I)(v)(I) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(51)(I)(v)(II)(II) (II)
a qualified facility, as defined in section 48E(b)(3).a qualified facility, as defined in section 48E(b)(3).
(51)(I)(vi)(vi) Related(vi) Related
The term “related” shall have the same meaning given such term under sections 267(b) and 707(b).The term “related” shall have the same meaning given such term under sections 267(b) and 707(b).
(51)(I)(vii)(vii) [inserted: High-performance transmission property.—]
[inserted: The term “high-performance transmission property” has the same meaning given such term under section 48E(d)(2).]
(51)(J)(J) Beginning of construction(J) Beginning of construction
For purposes of applying any provision under this paragraph, the beginning of construction with respect to any property shall be determined pursuant to rules similar to the rules under Internal Revenue Service Notice 2013–29 and Internal Revenue Service Notice 2018-59 (as well as any subsequently issued guidance clarifying, modifying, or updating either such Notice), as in effect on January 1, 2025.For purposes of applying any provision under this paragraph, the beginning of construction with respect to any property shall be determined pursuant to rules similar to the rules under Internal Revenue Service Notice 2013–29 and Internal Revenue Service Notice 2018-59 (as well as any subsequently issued guidance clarifying, modifying, or updating either such Notice), as in effect on January 1, 2025.
(51)(K)(K) Regulations and guidance(K) Regulations and guidance
The Secretary may prescribe such regulations and guidance as may be necessary or appropriate to carry out the provisions of this paragraph, including rules to prevent the circumvention of any rules or restrictions with respect to prohibited foreign entities.The Secretary may prescribe such regulations and guidance as may be necessary or appropriate to carry out the provisions of this paragraph, including rules to prevent the circumvention of any rules or restrictions with respect to prohibited foreign entities.
(52)(52) Material assistance from a prohibited foreign entity(52) Material assistance from a prohibited foreign entity
(52)(A)(A) In general(A) In general
The term “material assistance from a prohibited foreign entity” means—The term “material assistance from a prohibited foreign entity” means—
(52)(A)(i)(i) (i)
with respect to any qualified facility [struck: or] energy storage technology, a material assistance cost ratio which is less than the threshold percentage applicable under subparagraph (B), orwith respect to any qualified facility [inserted: ,] energy storage technology, [inserted: or high-performance transmission property, ]a material assistance cost ratio which is less than the threshold percentage applicable under subparagraph (B), or
(52)(A)(ii)(ii) (ii)
with respect to any facility which produces eligible components, a material assistance cost ratio which is less than the threshold percentage applicable under subparagraph (C).with respect to any facility which produces eligible components, a material assistance cost ratio which is less than the threshold percentage applicable under subparagraph (C).
(52)(B)(B) Threshold percentage for qualified facilities [struck: and] energy storage technology(B) Threshold percentage for qualified facilities [inserted: ,] energy storage technology[inserted: , and high-performance transmission property]
For purposes of subparagraph (A)(i), the threshold percentage shall be—For purposes of subparagraph (A)(i), the threshold percentage shall be—
(52)(B)(i)(i) (i)
in the case of a qualified facility the construction of which begins—in the case of a qualified facility the construction of which begins—

§ 7701(a)(52)(B)Threshold percentage for qualified facilities , energy storage technology, and high-performance transmission property(i)–(ii)

(a)(52)(B)(i)(I)–(IV) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(i)(V)(V) (V)
after December 31, 2029, 60 percent, andafter December 31, 2029, 60 percent, and
(ii)(ii) (ii)
in the case of energy storage technology the construction of which begins—in the case of energy storage technology [inserted: or high-performance transmission property ]the construction of which begins—
(ii)(I)(I) (I)
during calendar year 2026, 55 percent,during calendar year 2026, 55 percent,
(ii)(II)(II) (II)
during calendar year 2027, 60 percent,during calendar year 2027, 60 percent,

§ 7701(a)(52)Material assistance from a prohibited foreign entity(C)–(D)

(a)(52)(B)(ii)(III)–(C)(ii)(II) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(C)(ii)(II)(dd)(dd) (dd)
national security concerns.national security concerns.
(D)(D) Material assistance cost ratio(D) Material assistance cost ratio
(D)(i)(i) Qualified facilities [struck: and] energy storage technology(i) Qualified facilities [inserted: ,] energy storage technology[inserted: , and high-performance transmission property]
For purposes of subparagraph (A)(i), the term “material assistance cost ratio” means the amount (expressed as a percentage) equal to the quotient of—For purposes of subparagraph (A)(i), the term “material assistance cost ratio” means the amount (expressed as a percentage) equal to the quotient of—
(D)(i)(I)(I) (I)
an amount equal to—an amount equal to—
(D)(i)(I)(aa)(aa) (aa)
the total direct costs to the taxpayer attributable to all manufactured products (including components) which are incorporated into the qualified facility [struck: or] energy storage technology upon completion of construction, minusthe total direct costs to the taxpayer attributable to all manufactured products (including components) which are incorporated into the qualified facility [inserted: ,] energy storage technology[inserted: ,] [inserted: or high-performance transmission property ]upon completion of construction, minus
(D)(i)(I)(bb)(bb) (bb)
the total direct costs to the taxpayer attributable to all manufactured products (including components) which are—the total direct costs to the taxpayer attributable to all manufactured products (including components) which are—
(D)(i)(I)(bb)(AA)(AA) (AA)
incorporated into the qualified facility [struck: or] energy storage technology upon completion of construction, andincorporated into the qualified facility [inserted: ,] energy storage technology[inserted: ,] [inserted: or high-performance transmission property ]upon completion of construction, and
(D)(i)(I)(bb)(BB)(BB) (BB)
mined, produced, or manufactured by a prohibited foreign entity, divided bymined, produced, or manufactured by a prohibited foreign entity, divided by
(D)(i)(II)(II) (II)
the amount described in subclause (I)(aa).the amount described in subclause (I)(aa).

§ 7701(a)(52)(D)(iii)Safe harbor tables(I)–(II)

(a)(52)(D)(ii)–(iii) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(I)(cc)(cc) (cc)
provide all rules necessary to determine the amount of a taxpayer’s material assistance from a prohibited foreign entity within the meaning of this paragraph.provide all rules necessary to determine the amount of a taxpayer’s material assistance from a prohibited foreign entity within the meaning of this paragraph.
(II)(II) Safe harbors prior to issuance(II) Safe harbors prior to issuance
For purposes of this paragraph, prior to the date on which the Secretary issues the safe harbor tables described in subclause (I), and for construction of a qualified facility [struck: or] energy storage technology which begins on or before the date which is 60 days after the date of issuance of such tables, a taxpayer may—For purposes of this paragraph, prior to the date on which the Secretary issues the safe harbor tables described in subclause (I), and for construction of a qualified facility [inserted: ,] energy storage technology[inserted: ,] [inserted: or high-performance transmission property ]which begins on or before the date which is 60 days after the date of issuance of such tables, a taxpayer may—
(II)(aa)(aa) (aa)
use the tables included in Internal Revenue Service Notice 2025–08 to establish the percentage of the total direct costs of any listed eligible component and any manufactured product, anduse the tables included in Internal Revenue Service Notice 2025–08 to establish the percentage of the total direct costs of any listed eligible component and any manufactured product, and
(II)(bb)(bb) (bb)
rely on a certification by the supplier of the manufactured product, eligible component, or constituent element, material, or subcomponent of an eligible component—rely on a certification by the supplier of the manufactured product, eligible component, or constituent element, material, or subcomponent of an eligible component—

§ 7701(a)(52)Material assistance from a prohibited foreign entity(D)–(E)

(a)(52)(D)(iii)(II)(bb)(AA)–(v) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(D)(v)(I)(I) (I)
any abuse of the exception provided under clause (iv) through the stockpiling of any manufactured product, eligible component, or constituent element, material, or subcomponent of an eligible component during any period prior to the application of the requirements under this paragraph, orany abuse of the exception provided under clause (iv) through the stockpiling of any manufactured product, eligible component, or constituent element, material, or subcomponent of an eligible component during any period prior to the application of the requirements under this paragraph, or
(D)(v)(II)(II) (II)
any evasion with respect to the requirements of this subparagraph where the facts and circumstances demonstrate that the beginning of construction of a qualified facility [struck: or] energy storage technology has not in fact occurred.any evasion with respect to the requirements of this subparagraph where the facts and circumstances demonstrate that the beginning of construction of a qualified facility [inserted: ,] energy storage technology[inserted: ,] [inserted: or high-performance transmission property ]has not in fact occurred.
(E)(E) Other definitions(E) Other definitions
For purposes of this paragraph—For purposes of this paragraph—
(E)(i)(i) Eligible component(i) Eligible component
The term “eligible component” means—The term “eligible component” means—

§ 7701(a)(52)Material assistance from a prohibited foreign entity(E)–(G)

(a)(52)(E)(i)(I)–(iv)(I) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(E)(iv)(II)(II) (II)
a qualified facility, as defined in section 48E(b)(3), anda qualified facility, as defined in section 48E(b)(3), and
(E)(iv)(III)(III) (III)
any qualified interconnection property (as defined in section 48E(b)(4)) which is part of the qualified investment with respect to a qualified facility (as described in section 48E(b)(1)).any qualified interconnection property (as defined in section 48E(b)(4)) which is part of the qualified investment with respect to a qualified facility (as described in section 48E(b)(1)).
(E)(v)(v) [inserted: High-performance transmission property.—]
[inserted: The term “high-performance transmission property” has the same meaning given such term under section 48E(d)(2).]
(F)(F) Determination of ownership; beginning of construction(F) Determination of ownership; beginning of construction
Rules similar to the rules under subparagraphs (H) and (J) of paragraph (51) shall apply for purposes of this paragraph.Rules similar to the rules under subparagraphs (H) and (J) of paragraph (51) shall apply for purposes of this paragraph.
(G)(G) Regulations and guidance(G) Regulations and guidance
The Secretary may prescribe such regulations and guidance as may be necessary or appropriate to carry out the provisions of this paragraph, including—The Secretary may prescribe such regulations and guidance as may be necessary or appropriate to carry out the provisions of this paragraph, including—

Rest of § 7701 unchanged

Step through the changes