Skip to content
The People's CodeSearch
Menu

Title 14 · Coast Guard

Became law December 18, 2025 (Pub. L. 119-60): what it changed in 14 U.S.C. § 319

S. 1071 · National Defense Authorization Act for Fiscal Year 2026 ·

Became law as Public Law 119-60

Shown against the Code as it stood just before the law (current through Pub. L. 119-36, September 5, 2025): words it removed and words it added are marked.

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

14 U.S.C. § 319

+2 −2Shown
More for 14 U.S.C. § 319
Read § 319Versions of this section
2 changes the bill asks for here, 2 carried out
  1. Carried out:

    in paragraph (1) by striking 2 or more and inserting up to 4; and

  2. Carried out:

    in paragraph (3) by inserting in person or in writing after a briefing.

§ 319(a)–(c)

WhereMarkThe Code nowMarkAs the bill would leave it
§ 319. Unmanned system program and autonomous control and computer vision technology project§ 319. Unmanned system program and autonomous control and computer vision technology project
(a)(a) Unmanned System Program.—(a) Unmanned System Program.—
Not later than 2 years after the date of enactment of this section, the Secretary shall establish, under the control of the Commandant, an unmanned system program for the use by the Coast Guard of land-based, cutter-based, and aircraft-based unmanned systems for the purpose of increasing effectiveness and efficiency of mission execution.Not later than 2 years after the date of enactment of this section, the Secretary shall establish, under the control of the Commandant, an unmanned system program for the use by the Coast Guard of land-based, cutter-based, and aircraft-based unmanned systems for the purpose of increasing effectiveness and efficiency of mission execution.
(b)(b) Autonomous Control and Computer Vision Technology Project.—(b) Autonomous Control and Computer Vision Technology Project.—
(b)(1)(1) In general.—(1) In general.—
The Commandant shall conduct a project to retrofit [struck: 2] [struck: or] [struck: more] existing Coast Guard small boats deployed at operational units with—The Commandant shall conduct a project to retrofit [inserted: up] [inserted: to] [inserted: 4] existing Coast Guard small boats deployed at operational units with—
(b)(1)(A)(A) (A)
commercially available autonomous control and computer vision technology; andcommercially available autonomous control and computer vision technology; and
(b)(1)(B)(B) (B)
such sensors and methods of communication as are necessary to control, and technology to assist in conducting, search and rescue, surveillance, and interdiction missions.such sensors and methods of communication as are necessary to control, and technology to assist in conducting, search and rescue, surveillance, and interdiction missions.
(b)(2)(2) Data collection.—(2) Data collection.—
As part of the project required under paragraph (1), the Commandant shall collect and evaluate field-collected operational data from the retrofit described in such paragraph to inform future requirements.As part of the project required under paragraph (1), the Commandant shall collect and evaluate field-collected operational data from the retrofit described in such paragraph to inform future requirements.
(b)(3)(3) Briefing.—(3) Briefing.—
Not later than 180 days after the date on which the project required under paragraph (1) is completed, the Commandant shall provide to the Committee on Commerce, Science, and Transportation of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a briefing on the project that includes an evaluation of the data collected from the project.Not later than 180 days after the date on which the project required under paragraph (1) is completed, the Commandant shall provide to the Committee on Commerce, Science, and Transportation of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a briefing [inserted: in person or in writing ]on the project that includes an evaluation of the data collected from the project.
(c)(c) Unmanned System Defined.—(c) Unmanned System Defined.—
In this section, the term “unmanned system” means—In this section, the term “unmanned system” means—
(c)(1)(1) (1)
an unmanned aircraft system (as such term is defined in section 44801 of title 49);an unmanned aircraft system (as such term is defined in section 44801 of title 49);

Rest of § 319 unchanged

Step through the changes