Skip to content
The People's CodeSearch
Menu

Title 14 · Coast Guard

Became law December 18, 2025 (Pub. L. 119-60): what it changed in 14 U.S.C. § 5103

S. 1071 · National Defense Authorization Act for Fiscal Year 2026 ·

Became law as Public Law 119-60

Shown against the Code as it stood just before the law (current through Pub. L. 119-36, September 5, 2025): words it removed and words it added are marked.

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

14 U.S.C. § 5103 Major acquisitions

+8 −4Shown
More for 14 U.S.C. § 5103
Read § 5103Versions of this section
3 changes the bill asks for here, 3 carried out
  1. Carried out:

    in subsection (a) by striking major acquisition programs and inserting Level 1 acquisitions or Level 2 acquisitions;

  2. Carried out:

    in subsection (b) by striking major acquisition program and inserting Level 1 acquisition or Level 2 acquisition; and

  3. Carried out:

    by amending subsection (f) to read as follows:(f) Definitions.—In this section:(1) Level 1 acquisition.—The term “Level 1 acquisition” has the meaning given such term in section 1171. (2) Level 2 acquisition.—The term “Level 2 acquisition” has the meaning given such term in section 1171..

§ 5103(a)–(b)

WhereMarkThe Code nowMarkAs the bill would leave it
§ 5103. Major acquisitions§ 5103. Major acquisitions
(a)(a) In General.—(a) In General.—
In conjunction with the transmittal by the President to Congress of the budget of the United States for fiscal year 2014 and biennially thereafter, the Secretary shall submit to the Committee on Commerce, Science, and Transportation of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report on the status of all [struck: major] [struck: acquisition] [struck: programs].In conjunction with the transmittal by the President to Congress of the budget of the United States for fiscal year 2014 and biennially thereafter, the Secretary shall submit to the Committee on Commerce, Science, and Transportation of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report on the status of all [inserted: Level] [inserted: 1] [inserted: acquisitions or Level 2 acquisitions].
(b)(b) Information To Be Included.—(b) Information To Be Included.—
Each report under subsection (a) shall include for each [struck: major] acquisition [struck: program]—Each report under subsection (a) shall include for each [inserted: Level] [inserted: 1 ]acquisition [inserted: or Level 2 acquisition]—
(b)(1)(1) (1)
a statement of the Coast Guard’s mission needs and performance goals relating to such program, including a justification for any change to those needs and goals subsequent to a report previously submitted under this section;a statement of the Coast Guard’s mission needs and performance goals relating to such program, including a justification for any change to those needs and goals subsequent to a report previously submitted under this section;
(b)(2)(2) (2)
a justification explaining how the projected number and capabilities of assets acquired under such program meet applicable mission needs and performance goals;a justification explaining how the projected number and capabilities of assets acquired under such program meet applicable mission needs and performance goals;

§ 5103(e)–(f)

(b)(3)–(e)(3) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(e)(3)(C)(C) (C)
acquire related command, control, communications, computer, intelligence, surveillance, and reconnaissance systems; andacquire related command, control, communications, computer, intelligence, surveillance, and reconnaissance systems; and
(e)(3)(D)(D) (D)
acquire, construct, or renovate shoreside infrastructure.acquire, construct, or renovate shoreside infrastructure.
(f)(f) [struck: Major Acquisition Program Defined].—(f) [inserted: Definitions].—
[inserted: In this section:]
(f)(1)(1) [inserted: Level 1 acquisition.—]
[inserted: The term “Level 1 acquisition” has the meaning given such term in section 1171.]
(f)(2)(2) [inserted: Level 2 acquisition.—]
[inserted: The term “Level 2 acquisition” has the meaning given such term in section 1171.]
(f)[struck: In this section, the term “major acquisition program” means an ongoing acquisition undertaken by the Coast Guard with a life-cycle cost estimate greater than or equal to $300,000,000.]

Step through the changes