Title 33 · Navigation and Navigable Waters
Became law December 18, 2025 (Pub. L. 119-60): what it changed in 33 U.S.C. § 891b
S. 1071 · National Defense Authorization Act for Fiscal Year 2026 · Enrolled The final text both chambers passed, sent to the President to sign. If signed, it becomes law.
Became law as Public Law 119-60
Shown against the Code as it stood just before the law (current through Pub. L. 119-36, September 5, 2025): words it removed and words it added are marked.
33 U.S.C. § 891b Fleet replacement and modernization Plan
13 changes the bill asks for here, 13 carried out
- Carried out:
in subsection (a), by striking
Secretary
and all that follows and insertingSecretary, acting through the Assistant Administrator of NOAA for Marine and Aviation Operations, shall develop and submit to the Committee on Commerce, Science, and Transportation of the Senate and the Committee on Natural Resources and the Committee on Science, Space, and Technology of the House of Representatives a replacement and modernization plan for the NOAA fleet not later than 180 days after the date of the enactment of the National Defense Authorization Act for Fiscal Year 2026, and every 2 years thereafter.
; - Carried out:
by striking subsections (b) and (d);
- Carried out:
by redesignating subsection (c) as subsection (b);
- Carried out:
in paragraph (1), by striking
proposed
and all that follows and inserting the following:in operation in the NOAA fleet as of the date of submission of the Plan, a description of the status of those vessels, and a statement of the planned and anticipated service life of those vessels;
; - Carried out:
by striking paragraph (6);
- Carried out:
by redesignating paragraphs (2), (3), (4), and (5) as paragraphs (4), (5), (6), and (7), respectively;
- Carried out:
by inserting after paragraph (1) the following:
(2) a plan with respect to operation, maintenance, and replacement of vessels described in paragraph (1), including the schedule for maintenance or replacement and anticipated funding requirements; (3) the number of vessels proposed to be constructed by NOAA;;
- Carried out:
in paragraph (4), as so redesignated, by striking
constructed, leased, or chartered
and insertingacquired, leased, or chartered by NOAA
; - Carried out:
by striking
or any other federal official
and insertingthe Director of the National Science Foundation, or any other Federal official
; and - Carried out:
by striking
their availability
and insertingthe availability of those vessels
; - Carried out:
in paragraph (7), as so redesignated, by striking
; and
and inserting a semicolon; and - Carried out:
by adding at the end the following:
(8) a plan for using small vessels, uncrewed systems, and partnerships to augment the requirements of NOAA for days at sea; (9) the number of officers of the NOAA commissioned officer corps and professional wage mariners needed to operate and maintain the NOAA fleet, including …
- Carried out:
by adding at the end the following:
(c) Vessel Procurement Approval.—The National Oceanic and Atmospheric Administration may not procure vessels that are more than 65 feet in length without the approval of the Assistant Administrator of NOAA for Marine and Aviation Operations.;
§ 891b(a)–(d)
§ 891b. Fleet replacement and modernization Plan
(a) In general To carry out the program authorized in section 891a of this title, the Secretary[inserted: ,] [inserted: acting through the Assistant Administrator of NOAA for Marine and Aviation Operations, ]shall develop and submit to [struck: Congress][inserted: the] [inserted: Committee on Commerce, Science, and Transportation of the Senate and the Committee on Natural Resources and the Committee on Science, Space, and Technology of the House of Representatives ]a replacement and modernization [struck: Plan][inserted: plan] for the NOAA fleet [struck: covering][inserted: not] [struck: the][inserted: later] [struck: years][inserted: than] [struck: authorized][inserted: 180] [struck: under][inserted: days] [struck: section][inserted: after] [struck: 891h][inserted: the] [inserted: date ]of [struck: this][inserted: the] [struck: title][inserted: enactment of the National Defense Authorization Act for Fiscal Year 2026, and every 2 years thereafter].
[struck: (b)] [struck: Timing] [struck: The Plan required in subsection (a) shall be submitted to Congress within 30 days of October 29, 1992, and updated on an annual basis.]
[struck: (c)] [inserted: (b)] Plan elements The Plan required in subsection (a) shall include the following—
(1) the number of vessels [struck: proposed][inserted: in] [struck: to][inserted: operation] [struck: be][inserted: in] [struck: modernized][inserted: the] [struck: or][inserted: NOAA] [struck: replaced,][inserted: fleet] [inserted: as of ]the [struck: schedule][inserted: date] [struck: for][inserted: of] [struck: their][inserted: submission] [struck: modernization][inserted: of] [struck: or][inserted: the] [struck: replacement][inserted: Plan], [inserted: a description of the status of those vessels, ]and [inserted: a statement of the planned and ]anticipated [struck: funding][inserted: service] [struck: requirements][inserted: life of those vessels];
(2) [inserted: a plan with respect to operation, maintenance, and replacement of vessels described in paragraph (1), including the schedule for maintenance or replacement and anticipated funding requirements;]
(3) [inserted: the number of vessels proposed to be constructed by NOAA;]
[struck: (2)] [inserted: (4)] the number of vessels proposed to be [struck: constructed][inserted: acquired], leased, or chartered[inserted: by NOAA];
[struck: (3)] [inserted: (5)] the number of vessels, or days at sea, that can be obtained by using the vessels of the UNOLS;
[struck: (4)] [struck: the number of vessels that will be made available to NOAA by the Secretary of the Navy, or any other federal1 official, and the terms and conditions for their availability;]
(6) the [struck: appropriate][inserted: number] [struck: role][inserted: of] [inserted: vessels that will be made available to NOAA by the Secretary ]of the [struck: NOAA][inserted: Navy,] [struck: Corps][inserted: the] [struck: in][inserted: Director] [struck: operating][inserted: of] [inserted: the National Science Foundation, or any other Federal official, ]and [struck: maintaining][inserted: the] [inserted: terms and conditions for ]the [struck: NOAA][inserted: availability] [struck: fleet.][inserted: of those vessels;]
[struck: (5)] [inserted: (7)] the proposed acquisition of modern scientific instrumentation for the NOAA fleet, including acoustic systems, data transmission positioning and communication systems, physical, chemical, and meteorological oceanographic systems, and data acquisition and processing systems;[struck: and]
(8) [inserted: a plan for using small vessels, uncrewed systems, and partnerships to augment the requirements of NOAA for days at sea;]
(9) [inserted: the number of officers of the NOAA commissioned officer corps and professional wage mariners needed to operate and maintain the NOAA fleet, including the vessels identified under paragraph (3); and]
(10) [inserted: current and potential challenges with meeting the requirements under paragraph (9) and proposed solutions to those challenges.]
(c) [inserted: Vessel Procurement Approval.—] [inserted: The National Oceanic and Atmospheric Administration may not procure vessels that are more than 65 feet in length without the approval of the Assistant Administrator of NOAA for Marine and Aviation Operations.]
[struck: (d)] [struck: Contracting limitation] [struck: The Secretary may not enter into any contract for the construction, lease, or service life extension of a vessel of the NOAA fleet before the date of the submission to Congress of the Plan required in subsection (a).]