Became law December 18, 2025 (Pub. L. 119-60): what it changed in 50 U.S.C. § 2538a

S. 1071 · National Defense Authorization Act for Fiscal Year 2026 ·

Became law as Public Law 119-60

Shown against the Code as it stood just before the law (current through Pub. L. 119-36, September 5, 2025): words it removed and words it added are marked.

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

50 U.S.C. § 2538a

+33 −273 of 4 shown
More for 50 U.S.C. § 2538a
Read § 2538aVersions of this section
4 changes the bill asks for here, 3 carried out
  1. Carried out:

    by redesignating subsections (f), (g), and (h) as subsections (g), (i), and (h), respectively;

  2. Not carried out:

    by moving subsection (i), as so redesignated, so as to appear after subsection (h), as so redesignated;

    We can't read how this instruction is worded yet, so it isn't shown in the text.

    Technical detailno-pattern: moving subsection (X), as so redesignated, so as to appear after subsection (X), as so redesignated;
  3. Carried out:

    in subsection (i), as so redesignated, by striking this subsection and inserting this section; and

  4. Carried out:

    by inserting after subsection (e) the following new subsection (f):(f) Capacity.—In carrying out subsection (a), the Secretary of Energy shall—“(1) ensure that Los Alamos National Laboratory, Los Alamos, New Mexico, has the capability to reliably produce no fewer than 30 war reserve plutonium pits annually; and “(2) ensure that the Savannah River Plutonium Processing Facility at the Savannah River Site, Aiken, South Carolina, has the capability to reliably produce no fewer than 50 war reserve plutonium pits annually..

§ 2538a(e)–(h)

Start of § 2538a to (e)(2)(B) unchanged ·

(C) options available to the Administrator to balance scope, costs, and production requirements at the projects to decrease overall risk to the plutonium enterprise and enduring plutonium pit requirements; and

(D) an explanation of any changes to the production goals or requirements as compared to the report submitted during the previous year.

(f) [inserted: Capacity.—] [inserted: In carrying out subsection (a), the Secretary of Energy shall—]

(1) [inserted: ensure that Los Alamos National Laboratory, Los Alamos, New Mexico, has the capability to reliably produce no fewer than 30 war reserve plutonium pits annually; and]

(2) [inserted: ensure that the Savannah River Plutonium Processing Facility at the Savannah River Site, Aiken, South Carolina, has the capability to reliably produce no fewer than 50 war reserve plutonium pits annually.]

[struck: (f)] [inserted: (g)] Prohibition on ARIES expansion before achievement of 30 pit-per-year base capability

(1) In general Until the date on which the Administrator certifies to the congressional defense committees that the base capability to produce not less than 30 war reserve plutonium pits per year has been established at Los Alamos National Laboratory, the Administrator may not—

(A) carry out a project to expand the pit disassembly and processing capability of the spaces at PF–4 occupied by ARIES as of December 22, 2023; or

(B) otherwise expand such spaces.

(2) Exceptions Paragraph (1) shall not apply with respect to—

(A) ongoing or planned small projects to sustain or improve the efficiency of plutonium oxide production, provided that such projects do not expand the spaces at PF–4 occupied by ARIES as of December 22, 2023;

(B) the planning and design of an additional ARIES capability at a location other than PF–4; or

(C) the transfer of the ARIES capability to a location other than PF–4.

(3) Definitions In this subsection:

(A) The term “ARIES” means the Advanced Recovery and Integrated Extraction System method, developed and piloted at Los Alamos National Laboratory, Los Alamos, New Mexico, for disassembling surplus defense plutonium pits and converting the plutonium from such pits into plutonium oxide.

(B) The term “PF–4” means the Plutonium Facility at Technical Area 55 located at Los Alamos National Laboratory, Los Alamos, New Mexico.

[struck: (g)] [inserted: (i)] Covered project defined In this [struck: subsection][inserted: section], the term “covered project” means—

(1) the Savannah River Plutonium Processing Facility, Savannah River Site, Aiken, South Carolina (Project 21–D–511); or

(2) the Plutonium Pit Production Project, Los Alamos National Laboratory, Los Alamos, New Mexico (Project 21–D–512).

(h) Management of plutonium modernization program Not later than 570 days after December 22, 2023, the Administrator for Nuclear Security shall ensure that the plutonium modernization program established by the Office of Defense Programs of the National Nuclear Security Administration, or any subsequently developed program designed to meet the requirements under subsection (a), is managed in accordance with the best practices for schedule development and cost estimating of the Government Accountability Office.