Title 50 · War and National DefenseThe military
Became law December 18, 2025 (Pub. L. 119-60): what it changed in 50 U.S.C. § 2538b
S. 1071 · National Defense Authorization Act for Fiscal Year 2026 · Enrolled The final text both chambers passed, sent to the President to sign. If signed, it becomes law.
Became law as Public Law 119-60
Shown against the Code as it stood just before the law (current through Pub. L. 119-36, September 5, 2025): words it removed and words it added are marked.
50 U.S.C. § 2538b
4 changes the bill asks for here, 4 carried out
- Carried out:
by striking
Periodically
and insertingContinually
; and - Carried out:
by inserting
integrated system demonstrations,
afterflight testing,
; and - Carried out:
by striking
Shorten
and insertingDevelop technologies for transition to a nuclear stockpile life extension program or new nuclear weapon program project that have the potential to reduce
; and - Carried out:
by striking
and timelines to minimize
and all that follows through the end of the paragraph and insertingcost and schedule
; and
§ 2538b(c)–(d)
Start of § 2538b to (c)(1) unchanged ·
(2) Identify, enhance, and transfer knowledge, skills, and direct experience with respect to all phases of the joint nuclear weapons life cycle process from one generation of nuclear weapon designers and engineers to the following generation.
(3) [struck: Periodically][inserted: Continually] demonstrate stockpile responsiveness throughout the range of capabilities as required, such as through the use of prototypes, flight testing, [inserted: integrated system demonstrations, ]and development of plans for certification without the need for nuclear explosive testing.
(4) [struck: Shorten][inserted: Develop] [struck: design,][inserted: technologies] [struck: certification,][inserted: for] [struck: and][inserted: transition] [struck: manufacturing][inserted: to] [struck: cycles][inserted: a] [struck: and][inserted: nuclear] [struck: timelines][inserted: stockpile] [struck: to][inserted: life] [struck: minimize][inserted: extension] [struck: the][inserted: program] [struck: amount][inserted: or] [struck: of][inserted: new] [struck: time][inserted: nuclear] [struck: and][inserted: weapon] [struck: costs][inserted: program] [struck: leading][inserted: project] [inserted: that have the potential ]to [struck: an][inserted: reduce] [struck: engineering][inserted: design,] [struck: prototype][inserted: certification,] and [struck: production.][inserted: manufacturing cycles cost and schedule]
(5) Continually exercise processes for the integration and coordination of all relevant elements and processes of the Administration and the Department of Defense required to ensure stockpile responsiveness.
(6) The retention of the ability, in coordination with the Director of National Intelligence, to assess and develop prototype nuclear weapons of foreign countries if needed to meet intelligence requirements and, if necessary, to conduct no-yield testing of those prototypes.
(d) Joint nuclear weapons life cycle process defined In this section, the term “joint nuclear weapons life cycle process” means the process developed and maintained by the Secretary of Defense and the Secretary of Energy for the development, production, maintenance, and retirement of nuclear weapons.