Title 43 · Public LandsParks and public lands
Changes to 43 U.S.C. § 1772
S. 140 · Wildfire Prevention Act of 2026 · Reported The text a committee sent back to its chamber, often with changes, recommending a vote.
Reported by committee · step 2 of 5
43 U.S.C. § 1772 Vegetation managment, facility inspection, and operation and maintenance relating to electric transmission and distribution facility rights of way
5 changes the bill asks for here, 5 carried out
- Carried out:
Section 512(a)(1)(B)(ii) of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1772(a)(1)(B)(ii)) is amended by striking
10
and inserting150
. - Carried out:
in the section heading, by striking
managment
and insertingmanagement
; - Carried out:
by redesignating subsections (j) and (k) as subsections (k) and (l), respectively; and
- Carried out:
by inserting after subsection (i) the following:
(j) Permits and agreements with owners and operators of electric transmission or distribution facilities.— (1) In general.— In any right-of-way on National Forest System or Bureau of Land Management land provided to the owner or operator of an electric transmission or …
- Carried out:
Section 512(a)(2) of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1772(a)(2)) is amended by striking
include contractors or other agents engaged by
and insertingmean
.
§ 1772(a)
§ 1772. Vegetation [struck: managment][inserted: management], facility inspection, and operation and maintenance relating to electric transmission and distribution facility rights of way
(a) Definitions In this section:
(1) Hazard tree The term “hazard tree” means any tree or part thereof (whether located inside or outside a right-of-way) that has been designated, prior to tree failure, by a certified or licensed arborist or forester under the supervision of the Secretary concerned or the owner or operator of a transmission or distribution facility to be—
§ 1772(a)Definitions(1)–(3)
(a)(1)(A)–(B) unchanged ·
(i) cause substantial damage or disruption to a transmission or distribution facility; or
(ii) come within [struck: 10][inserted: 150] feet of an electric power line.
(2) Owner; operator The terms “owner” and “operator” [struck: include][inserted: mean] [struck: contractors or other agents engaged by ]the owner or operator of an electric transmission or distribution facility.
(3) Plan The term “plan” means a vegetation management, facility inspection, and operation and maintenance plan that—
(A) is prepared by the owner or operator of 1 or more electric transmission or distribution facilities to cover 1 or more electric transmission and distribution rights-of-way; and
§ 1772(i)–(l)
(a)(3)(B)–(i)(4)(A) unchanged ·
(B) to reduce the risk of wildfires; and
(C) to lower ratepayer energy costs.
(j) [inserted: Permits and agreements with owners and operators of electric transmission or distribution facilities.—]
(1) [inserted: In general.—] [inserted: In any right-of-way on National Forest System or Bureau of Land Management land provided to the owner or operator of an electric transmission or distribution facility, the Secretary concerned may provide permission to cut and remove trees or other vegetation from within the vicinity of the electric transmission or distribution facility without requiring a separate timber sale, if that cutting and removal is consistent with—]
(A) [inserted: the applicable plan;]
(B) [inserted: the applicable land and resource management plan or land use plan; and]
(C) [inserted: other applicable environmental laws (including regulations).]
(2) [inserted: Use of proceeds.—] [inserted: A right-of-way that includes permission for cutting and removal described in paragraph (1) shall include a requirement that, if the owner or operator of the electric transmission or distribution facility sells any portion of the material removed under the permit or easement, the owner or operator shall provide to the Secretary concerned any proceeds received from the sale, less any transportation costs incurred in the sale.]
(3) [inserted: Effect.—] [inserted: Nothing in paragraph (2) shall require the sale of any material removed under a right-of-way that includes permission for cutting and removal described in paragraph (1).]
[struck: (j)] [inserted: (k)] Implementation The Secretary concerned shall—
(1) not later than 1 year after March 23, 2018, propose regulations, or amend existing regulations, to implement this section; and
(2) not later than 2 years after March 23, 2018, finalize regulations, or amend existing regulations, to implement this section.
[struck: (k)] [inserted: (l)] Existing vegetation management, facility inspection, and operation and maintenance plans Nothing in this section requires an owner or operator to develop and submit a new plan under this section if a plan consistent with this section has already been approved by the Secretary concerned before March 23, 2018.