Skip to content
The People's CodeSearch
Menu

Title 16 · ConservationParks and public lands

Changes to 16 U.S.C. § 2201

S. 1462 · Fix Our Forests Act ·

Reported by committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

16 U.S.C. § 2201 Emergency conservation program

1 of 5 shown
More for 16 U.S.C. § 2201
Read § 2201

4 of the 5 changes this bill asks for here are already in the law as it stands, and were not made a second time. The bill, or another making the same changes, has probably become law since.

The bill's words for this section

  1. Not carried out:

    in the subsection heading, by inserting and other emergency conservation measures after fencing;

    The law already reads this way: § 2201(b) already has “and other emergency conservation measures”.

    Technical detailalready reads “and other emergency conservation measures” at that place in /us/usc/t16/s2201/b
  2. Not carried out:

    by inserting or for other emergency measures to replace or restore farmland or conservation structures requiring an immediate response (as determined by the Secretary), after replacement of fencing,; and

    The law already reads this way: § 2201(b)(1) already has “or for other emergency measures to replace or restore farmland or conservation structures requiring an immediate response (as determined by the Secretary),”.

    Technical detailalready reads “or for other emergency measures to replace or restore farmland or conservation structures requiring an immediate response (as determined by the Secretary),” at that place in /us/usc/t16/s2201/b/1
  3. Carried out:

    by striking option of receiving and all that follows through the period at the end and inserting the following: (A) with respect to a payment to the agricultural producer for a replacement, 75 percent of the cost of the replacement, as determined by the Secretary; and (B) with respect to a payment to the agricultural producer for a repair or restoration, 50 percent of the cost of the repair or restoration, as determined by the Secretary. option of receiving, before the agricultural producer carries out the repair, replacement, or restoration—; and

  4. Not carried out:

    in paragraph (2), by striking 60-day and inserting 180-day; and

    The law already reads this way: § 2201(b)(2) already has “180-day”.

    Technical detailalready reads “180-day” in /us/usc/t16/s2201/b/2
  5. Not carried out:

    by adding at the end the following:(c) Wildfire determination.— A wildfire that causes damage eligible for a payment under subsection (a) includes— (1) a wildfire that is not caused naturally, if the damage is caused by the spread of the wildfire due to natural causes; and (2) a wildfire that is caused by the Federal Government..

    The law already reads this way: § 2201(c) is already as the bill would have it.

    Technical detailalready there: /us/usc/t16/s2201/c reads as the bill would have it

Step through the changes