Title 26 · Internal Revenue CodeTaxes
Changes to 26 U.S.C. § 48F
S. 1968 · Working Waterfronts Act of 2025 · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
26 U.S.C. § 48F Credit for maintaining and enhancing hydroelectric facilities New section
1 change the bill asks for here, 1 carried out
- Carried out:
Subpart E of part IV of subchapter A of chapter 1 of the Internal Revenue Code of 1986 is amended by inserting after section 48E the following new section:48F. Credit for maintaining and enhancing hydroelectric facilities (a) In general.— For purposes of section 46, the credit for maintaining and enhancing hydroelectric facilities for any taxable year is an amount equal to 30 percent of the basis of any hydropower improvement property placed in service during such taxable year. (b) Certain progress expenditure rules made applicable.— Rules similar to the rules of subsections (c)(4) and (d) of section 46 (as in effect on the day before the date of the enactment of the Revenue Reconciliation Act of 1990) shall apply for purposes of subsection (a). (c) Hydropower improvement property.— In this section, the term
hydropower improvement property
means property which— (1) adds or improves fish passage at a qualified dam, (2) maintains or improves the quality of the water retained or released by a qualified dam, (3) promotes downstream sediment transport processes and habitat maintenance with respect to a qualified dam, (4) is part of a marine energy technology project or a marine energy project, or (5) places into service an approved remote dam. (d) Other definitions.— In this section— (1) Approved remote dam.— The termapproved remote dam
means— (A) a hydroelectric dam which— (i) exclusively services communities not interconnected to the Electric Reliability Council of Texas, the Eastern Interconnection, or the Western Interconnection, (ii) does not contribute to atmosphere pollution, and (iii) has a maximum net output of not greater than 40 megawatts, and (B) any interconnection property associated with a dam described in subparagraph (A). (2) Commission.— The termCommission
means the Federal Energy Regulatory Commission. (3) Fish passage.— The termfish passage
means, with respect to any qualified dam, any new or upgraded turbine, fishway, or other fish passage technology which improves fish migration and survival rates. (4) Interconnection property.— The terminterconnection property
means any tangible property— (A) (i) with respect to any dam described in paragraph (1)(A), to enable the delivery of electricity from such dam to any customer, or (ii) with respect to any project described paragraph (5)(A) or (6)(A), to enable the delivery of electricity from such project to any customer, and (B) which satisfies the requirements under clauses (ii) and (iii) of section 48(a)(8)(B). (5) Marine energy project.— The termmarine energy project
means— (A) a project which produces electricity from— (i) waves, tides, and currents in oceans, estuaries, and tidal areas, (ii) free flowing water in rivers, lakes, streams, and man-made channels, (iii) differentials in salinity and pressure gradients, or (iv) differentials in water temperature, including ocean thermal energy conversion, and (B) any interconnection property associated with a project described in subparagraph (A). (6) Marine energy technology project.— The termmarine energy technology project
means— (A) a project which the Commission determines— (i) will produce electricity from a generator that converts the potential energy of flowing water, (ii) will utilize a generating technology that is not in widespread, utility scale use in the United States as of the date of enactment of this section, (iii) will not be, based on information available to the Commission, likely to jeopardize the continued existence of any species listed as a threatened species or an endangered species under the Endangered Species Act of 1973, and (iv) will not be, based on information available to the Commission, likely to result in the destruction or adverse modification of an area designated as critical habitat for any species listed as a threatened species or an endangered species under such Act, and (B) any interconnection property associated with a project described in subparagraph (A). (7) Qualified dam.— The termqualified dam
means a hydroelectric dam that is licensed by the Commission or legally operating without such a license before the date of enactment of this section..
§ 48F(a)–(d)
§ 48F. [inserted: Credit for maintaining and enhancing hydroelectric facilities]
(a) [inserted: In general.—] [inserted: For purposes of section 46, the credit for maintaining and enhancing hydroelectric facilities for any taxable year is an amount equal to 30 percent of the basis of any hydropower improvement property placed in service during such taxable year.]
(b) [inserted: Certain progress expenditure rules made applicable.—] [inserted: Rules similar to the rules of subsections (c)(4) and (d) of section 46 (as in effect on the day before the date of the enactment of the Revenue Reconciliation Act of 1990) shall apply for purposes of subsection (a).]
(c) [inserted: Hydropower improvement property.—] [inserted: In this section, the term “hydropower improvement property” means property which—]
(1) [inserted: adds or improves fish passage at a qualified dam,]
(2) [inserted: maintains or improves the quality of the water retained or released by a qualified dam,]
(3) [inserted: promotes downstream sediment transport processes and habitat maintenance with respect to a qualified dam,]
(4) [inserted: is part of a marine energy technology project or a marine energy project, or]
(5) [inserted: places into service an approved remote dam.]
(d) [inserted: Other definitions.—] [inserted: In this section—]
(1) [inserted: Approved remote dam.—] [inserted: The term “approved remote dam” means—]
(A) [inserted: a hydroelectric dam which—]
(i) [inserted: exclusively services communities not interconnected to the Electric Reliability Council of Texas, the Eastern Interconnection, or the Western Interconnection,]
(ii) [inserted: does not contribute to atmosphere pollution, and]
(iii) [inserted: has a maximum net output of not greater than 40 megawatts, and]
(B) [inserted: any interconnection property associated with a dam described in subparagraph (A).]
(2) [inserted: Commission.—] [inserted: The term “Commission” means the Federal Energy Regulatory Commission.]
(3) [inserted: Fish passage.—] [inserted: The term “fish passage” means, with respect to any qualified dam, any new or upgraded turbine, fishway, or other fish passage technology which improves fish migration and survival rates.]
(4) [inserted: Interconnection property.—] [inserted: The term “interconnection property” means any tangible property—]
(A)
(i) [inserted: with respect to any dam described in paragraph (1)(A), to enable the delivery of electricity from such dam to any customer, or]
(ii) [inserted: with respect to any project described paragraph (5)(A) or (6)(A), to enable the delivery of electricity from such project to any customer, and]
(B) [inserted: which satisfies the requirements under clauses (ii) and (iii) of section 48(a)(8)(B).]
(5) [inserted: Marine energy project.—] [inserted: The term “marine energy project” means—]
(A) [inserted: a project which produces electricity from—]
(i) [inserted: waves, tides, and currents in oceans, estuaries, and tidal areas,]
(ii) [inserted: free flowing water in rivers, lakes, streams, and man-made channels,]
(iii) [inserted: differentials in salinity and pressure gradients, or]
(iv) [inserted: differentials in water temperature, including ocean thermal energy conversion, and]
(B) [inserted: any interconnection property associated with a project described in subparagraph (A).]
(6) [inserted: Marine energy technology project.—] [inserted: The term “marine energy technology project” means—]
(A) [inserted: a project which the Commission determines—]
(i) [inserted: will produce electricity from a generator that converts the potential energy of flowing water,]
(ii) [inserted: will utilize a generating technology that is not in widespread, utility scale use in the United States as of the date of enactment of this section,]
(iii) [inserted: will not be, based on information available to the Commission, likely to jeopardize the continued existence of any species listed as a threatened species or an endangered species under the Endangered Species Act of 1973, and]
(iv) [inserted: will not be, based on information available to the Commission, likely to result in the destruction or adverse modification of an area designated as critical habitat for any species listed as a threatened species or an endangered species under such Act, and]
(B) [inserted: any interconnection property associated with a project described in subparagraph (A).]
(7) [inserted: Qualified dam.—] [inserted: The term “qualified dam” means a hydroelectric dam that is licensed by the Commission or legally operating without such a license before the date of enactment of this section.]