10 U.S.C. § 3241 Design-build selection procedures

+1 −131 of 2 shown
More for 10 U.S.C. § 3241
Read § 3241
2 changes the bill asks for here, 1 carried out
  1. Carried out:

    by striking paragraph (3) and inserting the following new paragraph (3):(3) Any contract awarded under this subsection shall be considered to be a construction contract and shall be subject to the same oversight mechanisms to which construction contracts are subject under this title.; and

  2. Not carried out:

    in paragraph (4), by striking 2008 each place it appears and inserting 2030.

    “2008” isn't in § 3241(f)(4) in the Code as we have it. It was there before, as of Public Law 119-36: the law has changed since the bill was written.

    Technical detail“2008” not found in /us/usc/t10/s3241/f/4

1 of the 2 changes this bill asks for here names words or provisions the section had before but doesn't now: the law has changed since the bill was written, so it is not marked.

§ 3241(f)–(g)

Start of § 3241 to (f)(1) unchanged ·

(2) Any construction contract for a military construction project that provides for an accelerated design effort, as authorized by paragraph (1), shall include as a condition of the contract that the liability of the United States in a termination for convenience before funds are first made available for construction may not exceed an amount attributable to the final design of the project.

(3) [inserted: Any contract awarded under this subsection shall be considered to be a construction contract and shall be subject to the same oversight mechanisms to which construction contracts are subject under this title.]

[struck: Not later than March 1, 2028, and annually thereafter until March 1, 2033, the Secretary of Defense shall submit to the congressional defense committees a report on the use of the authority under this subsection that includes the following:]

[struck: (A)] [struck: A description of the military construction project for which such authority was used, including project title, location, scope, and rationale for selecting such project.]

[struck: (B)] [struck: The date of award of a contract for such military construction project, the initial estimated contract value, and the current projected total cost of such project.]

[struck: (C)] [struck: A comparison of projected schedule for completion of such project with the actual schedule, including dates for completing the design of such project and commencing construction.]

[struck: (D)] [struck: Any realized or anticipated cost savings or efficiencies, including those related to time, resources, or design innovation, attributable to the use of the authority under this subsection for a military construction project.]

[struck: (E)] [struck: An assessment of risk management benefits, including any improvements in design flexibility or coordination between contractors and the Secretary concerned.]

[struck: (F)] [struck: Any challenges encountered, and mitigation efforts made, in the use of such authority for a military construction project.]

(4) Each Secretary concerned may exercise the authority under this subsection using amounts appropriated for such purpose on or after the date of the enactment of this paragraph.

(g) Authorization of Progressive Design-build Contracts.—

Rest of § 3241 unchanged ·