Title 10 · Armed ForcesThe military
Changes to 10 U.S.C. § 4023
S. 2296 · National Defense Authorization Act for Fiscal Year 2026 · Engrossed The official text as one chamber (House or Senate) passed it.
Passed the Senate · step 3 of 5
10 U.S.C. § 4023 Procurement for experimental purposes
2 of the 3 changes this bill asks for here are already in the law as it stands, and were not made a second time. The bill, or another making the same changes, has probably become law since.
The bill's words for this section
- Not carried out:
in subsection (a), by striking
ordnance, signal, chemical activity, transportation, energy, medical, space flight, telecommunications, and aeronautical supplies, including parts and accessories, and designs thereof,
and insertingdemonstrations, prototypes, products, supplies, parts, accessories, auxiliary services, and design for defense-related articles
; and“ordnance, signal, chemical activity, transportation, energy, medical, space flight, telecommunications, and aeronautical supplies, including parts and accessories, and designs thereof,” isn't in § 4023(a) in the Code as we have it. The law may have changed since the bill was drafted.
Technical detail
“ordnance, signal, chemical activity, transportation, energy, medical, space flight, telecommunications, and aeronautical supplies, including parts and accessories, and designs thereof,” not found in /us/usc/t10/s4023/a - Not carried out:
by inserting
or modified
aftermay be made
; andThe law already reads this way: § 4023(b) already has “or modified”.
Technical detail
already reads “or modified” at that place in /us/usc/t10/s4023/b - Not carried out:
by inserting
prototyping,
aftergreater than necessary for
.The law already reads this way: § 4023(b) already has “prototyping,”.
Technical detail
already reads “prototyping,” at that place in /us/usc/t10/s4023/b