10 U.S.C. § 4231 Major systems: determination of quantity for low-rate initial production

+48 −21Shown
More for 10 U.S.C. § 4231
Read § 4231
4 changes the bill asks for here, 4 carried out
  1. Carried out:

    by striking subsection (a);

  2. Carried out:

    by redesignating subsections (b) and (c) as subsections (c) and (d), respectively;

  3. Carried out:

    by inserting before subsection (c), as redesignated by subparagraph (B), the following new subsections:(a) Conditions with respect to certain low-rate initial production.— (1) The number of low-rate initial production lots associated with a major defense acquisition program may not be more than one if— (A) the milestone decision authority authorized the use of a fixed-price type …

  4. Carried out:

    by adding at the end the following new subsection:(e) Definitions.— In this section: (1) The term “basic and functional design” has the meaning given such term in section 8669c of this title. (2) The term “construction” means steel cutting, module fabrication, assembly, outfitting, keel laying, and module erection. (3) The term …

§ 4231(a)–(e)

§ 4231. Major systems: determination of quantity for low-rate initial production

(a) [struck: Determination][inserted: Conditions] [struck: of][inserted: with] [struck: Quantities][inserted: respect] [struck: To][inserted: to] [struck: Be][inserted: certain] [struck: Procured for Low][inserted: low]-[struck: Rate][inserted: rate] [struck: Initial][inserted: initial] [struck: Production][inserted: production].—

(1) [struck: In][inserted: The] [struck: the][inserted: number] [struck: course ]of [struck: the development of a major system, the determination of what quantity of articles of that system should be procured for ]low-rate initial production [struck: (including][inserted: lots] [struck: the][inserted: associated] [struck: quantity][inserted: with] [struck: to][inserted: a] [struck: be][inserted: major] [struck: procured][inserted: defense] [struck: for][inserted: acquisition] [struck: preproduction][inserted: program] [struck: verification][inserted: may] [struck: articles)][inserted: not] [struck: shall ]be [struck: made][inserted: more than one if]—

(A) [struck: when ]the milestone [struck: B ]decision [struck: with][inserted: authority] [struck: respect][inserted: authorized] [struck: to][inserted: the] [struck: that][inserted: use] [struck: system][inserted: of] [struck: is][inserted: a] [struck: made][inserted: fixed-price type contract at the time of Milestone B approval]; and

(B) [inserted: the scope of the work covered ]by the [struck: official][inserted: fixed-price] [struck: of][inserted: type] [inserted: contract includes ]the [struck: Department][inserted: development] [inserted: and the low-rate initial production ]of [struck: Defense][inserted: items] [struck: who][inserted: for] [struck: makes][inserted: the] [struck: that][inserted: major] [struck: decision][inserted: defense acquisition program].

(2) [inserted: The acquisition executive of the applicable service, or a designee of the executive, may waive the limitation under paragraph (1) if—]

(A) [inserted: the waiver authority is not delegated to the contracting officer; and]

(B) [inserted: written notification of the waiver, which includes the associated rationale, is provided to the congressional defense committees not later than 30 days after the date on which the waiver is issued.]

(b) [inserted: Conditions with respect to certain shipbuilding contracts.—]

(1) [inserted: With respect to a fixed-price type contract for the procurement of shipbuilding associated with a major defense acquisition program, the number of ships to be procured under the contract, including all options, may not be more than two ships if the scope of the work covered by the contract includes the detail design for the ship and the construction of items for the launch and eventual delivery of the completed ship.]

(2) [inserted: The Secretary concerned may waive the limitation under paragraph (1) if, not later than 30 days after the date on which the waiver is issued, the Secretary submits to the congressional defense committees a written notification of the waiver that includes a certification that the basic and functional design of any ship to be procured under the contract described in paragraph (1) is complete.]

[struck: In this section, the term “milestone B decision” means the decision to approve the system development and demonstration of a major system by the official of the Department of Defense designated to have the authority to make that decision.]

[struck: (3)] [struck: Any increase from a quantity determined under paragraph (1) may only be made with the approval of the official making the determination.]

[struck: (4)] [struck: The quantity of articles of a major system that may be procured for low-rate initial production may not be less than one operationally configured production unit unless another quantity is established at the milestone B decision.]

[struck: (5)] [struck: The Secretary of Defense shall include a statement of the quantity determined under paragraph (1) in the first SAR submitted with respect to the program concerned after that quantity is determined. If the quantity exceeds 10 percent of the total number of articles to be produced, as determined at the milestone B decision with respect to that system, the Secretary shall include in the statement the reasons for such quantity. For purposes of this paragraph, the term “SAR” means a Selected Acquisition Report submitted under section 4351 of this title.]

[struck: (b)] [inserted: (c)] Low-Rate Initial Production of Weapon Systems.— Except as provided in subsection (c), low-rate initial production with respect to a new system is production of the system in the minimum quantity necessary—

(1) to provide production-configured or representative articles for operational tests pursuant to section 4171 of this title;

(2) to establish an initial production base for the system; and

(3) to permit an orderly increase in the production rate for the system sufficient to lead to full-rate production upon the successful completion of operational testing.

[struck: (c)] [inserted: (d)] Low-Rate Initial Production of Naval Vessel and Satellite Programs.— With respect to naval vessel programs and military satellite programs, low-rate initial production is production of items at the minimum quantity and rate that (1) preserves the mobilization production base for that system, and (2) is feasible, as determined pursuant to regulations prescribed by the Secretary of Defense.

(e) [inserted: Definitions.—] [inserted: In this section:]

(1) [inserted: The term “basic and functional design” has the meaning given such term in section 8669c of this title.]

(2) [inserted: The term “construction” means steel cutting, module fabrication, assembly, outfitting, keel laying, and module erection.]

(3) [inserted: The term “detail design” means design using computer-aided modeling to enable the generation of work instructions that show detailed system information and support construction, including—]

(A) [inserted: guidance for subcontractors and suppliers;]

(B) [inserted: installation drawings;]

(C) [inserted: schedules;]

(D) [inserted: material lists; and]

(E) [inserted: lists of prefabricated materials and parts.]

(4) [inserted: The term “major defense acquisition program” has the meaning given such term in section 4201 of this title.]

(5) [inserted: The term “Milestone B approval” has the meaning given such term in section 4172 of this title.]

(6) [inserted: The term “milestone decision authority” has the meaning given such term in section 4211 of this title.]