Changes to the Code
S. 2388 · Water Infrastructure Modernization Act of 2025 · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
33 U.S.C. § 1300 Pilot program for alternative water source projects
5 changes the bill asks for here, 5 carried out
- Carried out:
in subsection (b), by adding at the end the following:
(3) Intelligent water infrastructure technology.— The term “intelligent water infrastructure technology” means— (A) intelligent wastewater treatment and collection systems and stormwater management operations, including technologies that rely on— (i) the use of real-time …
- Carried out:
by striking subsection (f) and inserting the following:
(f) Uses of grants.— (1) In general.— Amounts from grants received under this section may be used for engineering, design, construction, and final testing of alternative water source projects designed to meet critical water supply needs. (2) Prohibition.— Amounts from grants …
- Carried out:
by striking subsection (h) and inserting the following:
(h) Reports.— (1) In general.— Not later than 180 days after the date of enactment of the Water Infrastructure Modernization Act of 2025, and not less frequently than annually thereafter, the Administrator shall submit to Congress a report that— (A) describes— (i) the projects …
- Carried out:
by striking
$25,000,000
and inserting$50,000,000
; and - Carried out:
by striking
2026
and inserting2028
.
§ 1300(b)–(i)
Start of § 1300 to (b) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (b)(1) | (1) Alternative water source project | (1) Alternative water source project | ||
| The term “alternative water source project” means a project designed to provide municipal, industrial, and agricultural water supplies in an environmentally sustainable manner by conserving, managing, reclaiming, or reusing water, wastewater, or stormwater or by treating wastewater or stormwater for groundwater recharge, potable reuse, or other purposes. Such term does not include water treatment or distribution facilities. | The term “alternative water source project” means a project designed to provide municipal, industrial, and agricultural water supplies in an environmentally sustainable manner by conserving, managing, reclaiming, or reusing water, wastewater, or stormwater or by treating wastewater or stormwater for groundwater recharge, potable reuse, or other purposes. Such term does not include water treatment or distribution facilities. | |||
| (b)(2) | (2) Critical water supply needs | (2) Critical water supply needs | ||
| The term “critical water supply needs” means existing or reasonably anticipated future water supply needs that cannot be met by existing water supplies, as identified in a comprehensive statewide or regional water supply plan or assessment projected over a planning period of at least 20 years. | The term “critical water supply needs” means existing or reasonably anticipated future water supply needs that cannot be met by existing water supplies, as identified in a comprehensive statewide or regional water supply plan or assessment projected over a planning period of at least 20 years. | |||
| (b)(3) | (3) [inserted: Intelligent water infrastructure technology.—] | |||
| [inserted: The term “intelligent water infrastructure technology” means—] | ||||
| (b)(3)(A) | (A) [inserted: ] | |||
| [inserted: intelligent wastewater treatment and collection systems and stormwater management operations, including technologies that rely on—] | ||||
| (b)(3)(A)(i) | (i) [inserted: ] | |||
| [inserted: the use of real-time monitoring, management, analytics, and data collection tools, embedded intelligence, and predictive maintenance capabilities that improve the energy efficiency, cost efficiency, reliability, and resiliency of wastewater treatment and collection systems;] | ||||
| (b)(3)(A)(ii) | (ii) [inserted: ] | |||
| [inserted: real-time remote sensors that provide continuous monitoring of water quality to support optimization; and] | ||||
| (b)(3)(A)(iii) | (iii) [inserted: ] | |||
| [inserted: the use of artificial intelligence and other intelligent optimization tools that—] | ||||
| (b)(3)(A)(iii)(I) | (I) [inserted: ] | |||
| [inserted: reduce operational costs, including operational costs relating to energy consumption and chemical treatment; and] | ||||
| (b)(3)(A)(iii)(II) | (II) [inserted: ] | |||
| [inserted: improve decisionmaking;] | ||||
| (b)(3)(B) | (B) [inserted: ] | |||
| [inserted: innovative and alternative combined sewer and stormwater control projects, including groundwater banking, that rely on real-time data acquisition to support predictive aquifer recharge through water reuse and stormwater management capabilities;] | ||||
| (b)(3)(C) | (C) [inserted: ] | |||
| [inserted: advanced digital design and construction management tools, including advanced digital technologies;] | ||||
| (b)(3)(D) | (D) [inserted: ] | |||
| [inserted: technology that can identify or reduce water losses in a nondestructive or nondisruptive manner, including through analytical software, flow and pressure monitoring, or acoustic data collection;] | ||||
| (b)(3)(E) | (E) [inserted: ] | |||
| [inserted: predictive and diagnostic tools for informed decisionmaking;] | ||||
| (b)(3)(F) | (F) [inserted: ] | |||
| [inserted: technology that can provide comprehensive data on pipe integrity to identify the presence of leaks or gas pockets;] | ||||
| (b)(3)(G) | (G) [inserted: ] | |||
| [inserted: technology that can provide information on the extent of leaks or gas pockets, with an emphasis on detecting weakness of, vulnerability of, or damage to pipe barrels, pipe joints, or other pipe features;] | ||||
| (b)(3)(H) | (H) [inserted: ] | |||
| [inserted: real-time remote sensing technologies, including the use of advanced data management and analytics, that detect and alert owners and operators to wastewater and water supply treatment facilities operations, including leakages, and pipe bursts on a real-time basis, including persistent sensor networks capable of measuring—] | ||||
| (b)(3)(H)(i) | (i) [inserted: ] | |||
| [inserted: acoustic signals;] | ||||
| (b)(3)(H)(ii) | (ii) [inserted: ] | |||
| [inserted: pressure transient;] | ||||
| (b)(3)(H)(iii) | (iii) [inserted: ] | |||
| [inserted: water quality; or] | ||||
| (b)(3)(H)(iv) | (iv) [inserted: ] | |||
| [inserted: water flow;] | ||||
| (b)(3)(I) | (I) [inserted: ] | |||
| [inserted: advanced metering infrastructure, including meter data analytics and ratepayer technology—] | ||||
| (b)(3)(I)(i) | (i) [inserted: ] | |||
| [inserted: to improve end-user conservation; and] | ||||
| (b)(3)(I)(ii) | (ii) [inserted: ] | |||
| [inserted: in support of disadvantaged communities;] | ||||
| (b)(3)(J) | (J) [inserted: ] | |||
| [inserted: resilient water supply projects that may provide real-time monitoring of weather patterns and weather-related impacts on water quality and flood protection reservoirs and dams that enhance operations, including—] | ||||
| (b)(3)(J)(i) | (i) [inserted: ] | |||
| [inserted: improved water supply reliability and management;] | ||||
| (b)(3)(J)(ii) | (ii) [inserted: ] | |||
| [inserted: protection of natural resources, including fisheries; and] | ||||
| (b)(3)(J)(iii) | (iii) [inserted: ] | |||
| [inserted: temperature control;] | ||||
| (b)(3)(K) | (K) [inserted: ] | |||
| [inserted: innovative and alternative water supply projects, including groundwater banking, that rely on real-time data acquisition to support predictive aquifer recharge through water reuse and stormwater management capabilities;] | ||||
| (b)(3)(L) | (L) [inserted: ] | |||
| [inserted: artificial intelligence and other intelligent optimization tools that—] | ||||
| (b)(3)(L)(i) | (i) [inserted: ] | |||
| [inserted: reduce operational costs, including costs relating to energy consumption and chemical treatment of wastewater and stormwater; and] | ||||
| (b)(3)(L)(ii) | (ii) [inserted: ] | |||
| [inserted: improve decisionmaking; and] | ||||
| (b)(3)(M) | (M) [inserted: ] | |||
| [inserted: advanced digital design and construction management technologies and tools relating to water treatment systems and distribution networks the development of advanced digital models.] | ||||
| (c) | (c) Establishment | (c) Establishment | ||
| The Administrator may establish a pilot program to make grants to State, interstate, and intrastate water resource development agencies (including water management districts and water supply authorities), local government agencies, private utilities, and nonprofit entities for alternative water source projects to meet critical water supply needs. | The Administrator may establish a pilot program to make grants to State, interstate, and intrastate water resource development agencies (including water management districts and water supply authorities), local government agencies, private utilities, and nonprofit entities for alternative water source projects to meet critical water supply needs. | |||
| (d) | (d) Eligible entity | (d) Eligible entity | ||
| The Administrator may make grants under this section to an entity only if the entity has authority under State law to develop or provide water for municipal, industrial, and agricultural uses in an area of the State that is experiencing critical water supply needs. | The Administrator may make grants under this section to an entity only if the entity has authority under State law to develop or provide water for municipal, industrial, and agricultural uses in an area of the State that is experiencing critical water supply needs. | |||
| (e) | (e) Selection of projects | (e) Selection of projects | ||
| (e)(1) | (1) Limitation | (1) Limitation | ||
| A project that has received construction funds under the reclamation and reuse program conducted under the Reclamation Projects Authorization and Adjustment Act of 1992 (43 U.S.C. 390h et seq.) shall not be eligible for grant assistance under this section. | A project that has received construction funds under the reclamation and reuse program conducted under the Reclamation Projects Authorization and Adjustment Act of 1992 (43 U.S.C. 390h et seq.) shall not be eligible for grant assistance under this section. | |||
| (e)(2) | (2) Geographical distribution | (2) Geographical distribution | ||
| Alternative water source projects selected by the Administrator under this section shall reflect a variety of geographical and environmental conditions. | Alternative water source projects selected by the Administrator under this section shall reflect a variety of geographical and environmental conditions. | |||
| (f) | (f) Uses of grants | (f) Uses of grants[inserted: .—] | ||
| (f)(1) | (1) [inserted: In general.—] | |||
| [inserted: Amounts from grants received under this section may be used for engineering, design, construction, and final testing of alternative water source projects designed to meet critical water supply needs.] | ||||
| (f)(2) | (2) [inserted: Prohibition.—] | |||
| [inserted: Amounts from grants received under this section may not be used for planning, feasibility studies, operation, or maintenance.] | ||||
| (f)(3) | (3) [inserted: Intelligent water infrastructure technologies.—] | |||
| (f)(3)(A) | (A) [inserted: In general.—] | |||
| [inserted: Amounts from grants received under this section may be used for engineering, design, construction, implementation, training, and operations relating to the adoption and use of intelligent water infrastructure technology.] | ||||
| (f)(3)(B) | (B) [inserted: Applicability.—] | |||
| [inserted: For purposes of paragraph (2), any costs with respect to intelligent water infrastructure technology shall not be considered operation or maintenance costs.] | ||||
| (f) | ||||
| (g) | (g) Cost sharing | (g) Cost sharing | ||
| The Federal share of the eligible costs of an alternative water source project carried out using assistance made available under this section shall not exceed 50 percent. | The Federal share of the eligible costs of an alternative water source project carried out using assistance made available under this section shall not exceed 50 percent. | |||
| (h) | (h) Reports | (h) Reports[inserted: .—] | ||
| (h)(1) | (1) [inserted: In general.—] | |||
| [inserted: Not later than 180 days after the date of enactment of the Water Infrastructure Modernization Act of 2025, and not less frequently than annually thereafter, the Administrator shall submit to Congress a report that—] | ||||
| (h)(1)(A) | (A) [inserted: ] | |||
| [inserted: describes—] | ||||
| (h)(1)(A)(i) | (i) [inserted: ] | |||
| [inserted: the projects awarded grants for the purposes described in subsection (f)(3); and] | ||||
| (h)(1)(A)(ii) | (ii) [inserted: ] | |||
| [inserted: the improvements in the resiliency that resulted from grants awarded under this section; and] | ||||
| (h)(1)(B) | (B) [inserted: ] | |||
| [inserted: includes any recommendations of the Administrator to improve the ability of grants under this section to achieve the uses described in subsection (f).] | ||||
| (h)(2) | (2) [inserted: Initial report.—] | |||
| [inserted: In the initial report required under paragraph (1), the Administrator shall include a description of the implementation of this section, including a description of—] | ||||
| (h)(2)(A) | (A) [inserted: ] | |||
| [inserted: the projects for which a grant was sought under this section for the purposes described in subsection (f)(3) that were denied; and] | ||||
| (h)(2)(B) | (B) [inserted: ] | |||
| [inserted: for each of the projects described in subparagraph (A), the reasons for which the grant was denied.] | ||||
| (h) | ||||
| (i) | (i) Authorization of appropriations | (i) Authorization of appropriations | ||
| (i)(1) | (1) In general | (1) In general | ||
| There is authorized to be appropriated to carry out this section $ | There is authorized to be appropriated to carry out this section $[inserted: 50],000,000 for each of fiscal years 2022 through [inserted: 2028], to remain available until expended. | |||
| (i)(2) | (2) Limitation on use of funds | (2) Limitation on use of funds | ||
| Of the amounts made available for grants under paragraph (1), not more than 2 percent may be used to pay the administrative costs of the Administrator. | Of the amounts made available for grants under paragraph (1), not more than 2 percent may be used to pay the administrative costs of the Administrator. | |||