Skip to content
The People's CodeSearch
Menu

Title 49 · TransportationTransportation

Changes to 49 U.S.C. § 60108

S. 2975 · Pipeline Integrity, Protection, and Enhancement for Leveraging Investments in the Nation's Energy to assure Safety Act of 2025 ·

PIPELINE Safety Act of 2025

Passed the Senate · step 3 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

49 U.S.C. § 60108 Inspection and maintenance

+62 −5Shown
More for 49 U.S.C. § 60108
Read § 60108
8 changes the bill asks for here, 8 carried out
  1. Carried out:

    Section 60108 of title 49, United States Code, is amended by adding at the end the following:(f) Inspection of rights-of-way.— (1) In general.— When requiring an operator to inspect the surface conditions on or adjacent to a pipeline right-of-way, the Secretary shall allow the use of unmanned aircraft systems and satellites. (2) Savings provision.— Nothing in this …

  2. Carried out:

    in paragraph (1), by striking (1) Each and inserting the following:(1) In general.— Each;

  3. Carried out:

    by striking (2) If and inserting the following:(2) Revision.— If;

  4. Carried out:

    by adding at the end the following:(4) Alternative methods of maintaining rights-of-way.— (A) In general.— As part of the review conducted under paragraph (3), the Secretary shall allow for an alternative method of maintaining rights-of-way for pipelines and other pipeline facilities under a voluntary program …

  5. Carried out:

    Section 60108(e) of title 49, United States Code, is amended, in the subsection heading, by striking In general and inserting Post-inspection briefing and preliminary findings.

  6. Carried out:

    in clause (ii), by striking and at the end; and

  7. Carried out:

    by adding at the end the following:(iv) mitigation of threats posed by geological hazards; and.

  8. Carried out:

    Section 60108(c)(6)(C) of title 49, United States Code, is amended, in the first sentence, by inserting and Tribal officials from any affected Indian Tribe after to the Secretary.

§ 60108(a)

§ 60108. Inspection and maintenance

(a) Plans.—

(1) [inserted: In general.—] Each person owning or operating a gas pipeline facility or hazardous liquid pipeline facility shall carry out a current written plan (including any changes) for inspection and maintenance of each facility used in the transportation and owned or operated by the person. A copy of the plan shall be kept at any office of the person the Secretary of Transportation considers appropriate. The Secretary also may require a person owning or operating a pipeline facility subject to this chapter to file a plan for inspection and maintenance for approval.

(2) [inserted: Revision.—] If the Secretary or a State authority responsible for enforcing standards prescribed under this chapter decides that a plan required under paragraph (1) of this subsection is inadequate for safe operation, the Secretary or authority shall require the person to revise the plan. Revision may be required only after giving notice and an opportunity for a hearing. A plan required under paragraph (1) must be practicable and designed to meet the need for pipeline safety, must meet the requirements of any regulations promulgated under section 60102(q), and must include terms designed to enhance the ability to discover safety-related conditions described in section 60102(h)(1) of this title. In deciding on the adequacy of a plan, the Secretary or authority shall consider—

(A) relevant available pipeline safety information;

§ 60108(a)–(b)

(a)(2)(B)–(D) unchanged ·

(i) public safety;

(ii) eliminating hazardous leaks and minimizing releases of natural gas from pipeline facilities;[struck: and]

(iii) the protection of the environment; and

(iv) [inserted: mitigation of threats posed by geological hazards; and]

(E) the extent to which the plan addresses the replacement or remediation of pipelines that are known to leak based on the material (including cast iron, unprotected steel, wrought iron, and historic plastics with known issues), design, or past operating and maintenance history of the pipeline.

(3) Review of plans.—

(A) In general.— Not later than 2 years after the date of enactment of this subparagraph, and not less frequently than once every 5 years thereafter, the Secretary or relevant State authority with a certification in effect under section 60105 shall review each plan described in this subsection.

(B) Context of review.— The Secretary may conduct a review under this paragraph as an element of the inspection of the operator carried out by the Secretary under subsection (b).

(C) Inadequate programs.— If the Secretary determines that a plan reviewed under this paragraph does not comply with the requirements of this chapter (including any regulations promulgated under this chapter), has not been adequately implemented, is inadequate for the safe operation of a pipeline facility, or is otherwise inadequate, the Secretary may conduct enforcement proceedings under this chapter.

(4) [inserted: Alternative methods of maintaining rights-of-way.—]

(A) [inserted: In general.—] [inserted: As part of the review conducted under paragraph (3), the Secretary shall allow for an alternative method of maintaining rights-of-way for pipelines and other pipeline facilities under a voluntary program carried out by the operator if the Secretary determines that the alternative method—]

(i) [inserted: achieves a level of safety at least equal to the level of safety required by the regulations promulgated under this chapter; and]

(ii) [inserted: allows for timely emergency response.]

(B) [inserted: Purpose.—] [inserted: An operator considering implementing an alternative method described in subparagraph (A) may consider incorporating into the plan for implementing that method 1 or more conservation practices, including—]

(i) [inserted: integrated vegetation management practices, including reduced mowing;]

(ii) [inserted: the development of habitat and forage for pollinators and other wildlife through seeding or planting of diverse native forbs and grasses;]

(iii) [inserted: practices relating to maintenance strategies that promote early successional vegetation or limit disturbance during periods of highest use by target pollinator species and other wildlife on pipeline or facility rights-of-way, including—]

(I) [inserted: increasing mowing height;]

(II) [inserted: reducing mowing frequency; and]

(III) [inserted: refraining from mowing monarch and other pollinator habitat during periods in which monarchs or other pollinators are present;]

(iv) [inserted: an integrated vegetation management plan that may include approaches such as mechanical tree and brush removal and targeted and judicious use of herbicides and mowing to address incompatible or undesirable vegetation while promoting compatible and beneficial vegetation on pipeline and facility rights-of-way;]

(v) [inserted: planting or seeding of deeply rooted, regionally appropriate perennial grasses and wildflowers, including milkweed, to enhance habitat;]

(vi) [inserted: removing shallow-rooted grasses from planting and seeding mixes, except for use as nurse or cover crops; and]

(vii) [inserted: obtaining expert training or assistance on wildlife- and pollinator-friendly practices, including—]

(I) [inserted: native plant identification;]

(II) [inserted: establishment and management of regionally appropriate native plants;]

(III) [inserted: land management practices; and]

(IV) [inserted: integrated vegetation management.]

(C) [inserted: Consultation.—]

(i) [inserted: Available guidance.—] [inserted: In developing alternative methods under this paragraph, an operator shall consult any available guidance issued by—]

(I) [inserted: the Secretary; or]

(II) [inserted: an applicable State agency carrying out compliance activities on behalf of the Secretary in accordance with section 60105.]

(ii) [inserted: Leading industry practices.—] [inserted: In the absence of guidance described in clause (i), an operator may consult leading industry practices and guidance to develop and implement alternative methods under this paragraph.]

(D) [inserted: Requirements.—] [inserted: An operator using an alternative method under this paragraph shall ensure that the alternative inspection plans of the operator continue to ensure that the operator can identify risks to pipeline facilities.]

(E) [inserted: Savings provision.—] [inserted: Nothing in this paragraph exempts an operator from compliance with any applicable requirements under this chapter (including any regulations promulgated under this chapter).]

(b) Inspection and Testing.—

(1) The Secretary shall inspect and require appropriate testing of a pipeline facility subject to this chapter that is not covered by a certification under section 60105 of this title or an agreement under section 60106 of this title. The Secretary shall decide on the frequency and type of inspection and testing under this subsection on a case-by-case basis after considering the following:

§ 60108(c)Pipeline Facilities Offshore and in Other Waters.—(6)–(8)

(b)(1)(A)–(c)(6)(A) unchanged ·

(B) Not later than October 24, 1995, the operator of a pipeline facility abandoned before October 24, 1992, shall report to the Secretary reasonably available information related to the facility, including information that a third party possesses. The information shall include the location, size, date, and method of abandonment, whether the facility has been abandoned properly under applicable law, and other relevant information the Secretary may require. Not later than April 24, 1994, the Secretary shall specify how the information shall be reported. The Secretary shall ensure that the Government maintains the information in a way accessible to appropriate Government agencies and State authorities.

(C) The Secretary shall request that a State authority having information on a collision between a vessel and an underwater pipeline facility report the information to the Secretary [inserted: and Tribal officials from any affected Indian Tribe ]in a timely way and make a reasonable effort to specify the location, date, and severity of the collision. Chapter 35 of title 44 does not apply to this subparagraph.

(7) The Secretary may not exempt from this chapter an offshore hazardous liquid pipeline facility only because the pipeline facility transfers hazardous liquid in an underwater pipeline between a vessel and an onshore facility.

(8) If, after reviewing existing Federal and State regulations for hazardous liquid gathering lines located offshore in the United States, including within the inlets of the Gulf of Mexico, the Secretary determines it is appropriate, the Secretary shall issue regulations, after notice and an opportunity for a hearing, subjecting offshore hazardous liquid gathering lines and hazardous liquid gathering lines located within the inlets of the Gulf of Mexico to the same standards and regulations as other hazardous liquid gathering lines. The regulations issued under this paragraph shall not apply to production pipelines or flow lines.

§ 60108(d)–(f)

(d) unchanged ·

(3) This subsection does not prevent the Secretary from developing Government guidelines or standards for cast iron gas pipelines as the Secretary considers appropriate.

(4) Not later than December 31, 2012, and every 2 years thereafter, the Secretary shall conduct a follow-up survey to measure the progress that owners and operators of pipeline facilities have made in adopting and implementing their plans for the safe management and replacement of cast iron gas pipelines.

(e) [struck: In][inserted: Post-inspection] [struck: General][inserted: briefing and preliminary findings].— After the completion of a Pipeline and Hazardous Materials Safety Administration pipeline safety inspection, the Administrator of such Administration, or the State authority certified under section 60105 of title 49, United States Code, to conduct such inspection, shall—

(1) within 30 days, conduct a post-inspection briefing with the owner or operator of the gas or hazardous liquid pipeline facility inspected outlining any concerns; and

(2) within 90 days, to the extent practicable, provide the owner or operator with written preliminary findings of the inspection.

(f) [inserted: Inspection of rights-of-way.—]

(1) [inserted: In general.—] [inserted: When requiring an operator to inspect the surface conditions on or adjacent to a pipeline right-of-way, the Secretary shall allow the use of unmanned aircraft systems and satellites.]

(2) [inserted: Savings provision.—] [inserted: Nothing in this subsection affects any obligation to operate an unmanned aircraft system in accordance with all relevant Federal laws relating to the use of unmanned aircraft systems.]

Step through the changes