Changes to 49 U.S.C. § 60109
S. 2975 · Pipeline Integrity, Protection, and Enhancement for Leveraging Investments in the Nation's Energy to assure Safety Act of 2025 · Engrossed The official text as one chamber (House or Senate) passed it.
PIPELINE Safety Act of 2025
Passed the Senate · step 3 of 5
49 U.S.C. § 60109 High-density population areas and environmentally sensitive areas
2 changes the bill asks for here, 1 carried out
- Not carried out:
Section 60109(e)(7)(A)(i) of title 49, United States Code, is amended by striking presence of cast iron pipes and mains in the distribution system; and and inserting the following:
“presence, in the distribution system, of pipes and mains made of—(I) cast iron; (II) unprotected steel; (III) wrought iron; or (IV) historic plastics with known safety issues; and.
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: striking QTEXT and inserting the following: “ presence, in the distribution system, of pipes and mains made of — QCONTENT. - Carried out:
Section 60109(e)(7) of title 49, United States Code, is amended by striking subparagraph (C) and inserting the following:
(C) Deadlines.— (i) Emergency response plan.— Not later than 2 years after the date of enactment of the PIPELINE Safety Act of 2025, each operator of a distribution system shall make available to the Secretary or the relevant State authority with a certification in effect under …
§ 60109(e)(7)Evaluation of risk.—(B)–(D)
Start of § 60109 to (e)(7)(B)(i) unchanged ·
(ii) may not determine that there are no potential consequences associated with low probability events unless that determination is otherwise supported by engineering analysis or operational knowledge.
(C) Deadlines.—
(i) [struck: In][inserted: Emergency] [struck: general][inserted: response plan].— [inserted: Not later than 2 years after the date of enactment of the PIPELINE Safety Act of 2025, each operator of a distribution system shall make available to the Secretary or the relevant State authority with a certification in effect under section 60105, as applicable, and to any affected Indian Tribe, a copy of the emergency response plan under section 60102(d)(5).]
[struck: Not later than 2 years after the date of enactment of this paragraph, each operator of a distribution system shall make available to the Secretary or the relevant State authority with a certification in effect under section 60105, as applicable, a copy of—]
[struck: (I)] [struck: the distribution integrity management plan of the operator;]
[struck: (II)] [struck: the emergency response plan under section 60102(d)(5); and]
[struck: (III)] [struck: the procedural manual for operations, maintenance, and emergencies under section 60102(d)(4).]
(ii) [struck: Updates][inserted: Other documents].— [inserted: Not later than 2 years after the date of enactment of the PIPELINE Safety Act of 2025, each operator of a distribution system shall make available to the Secretary or the relevant State authority with a certification in effect under section 60105, as applicable, a copy of—]
(I) [inserted: the distribution integrity management plan of the operator; and]
(II) [inserted: the procedural manual for operations, maintenance, and emergencies under section 60102(d)(4).]
[struck: Each operator of a distribution system shall make available to the Secretary or make available for inspection to the relevant State authority described in clause (i), if applicable, an updated plan or manual described in that clause by not later than 60 days after the date of a significant update, as determined by the Secretary.]
(iii) [struck: Applicability of foia][inserted: Updates].— [inserted: Not later than 60 days after the date of a significant update, as determined by the Secretary, to a plan or manual described in clause (i) or (ii), the operator of the applicable distribution system shall—]
(I) [inserted: in the case of an emergency response plan described in clause (i), make available to the Secretary or make available for inspection to the relevant State authority described in that clause (if applicable), and make available for inspection to any affected Indian Tribe, an updated copy of the emergency response plan; and]
(II) [inserted: in the case of a plan or manual described in clause (ii), make available to the Secretary or make available for inspection to the relevant State authority described in that clause (if applicable) an updated copy of the applicable plan or manual.]
(iv) [inserted: Applicability of FOIA.—] [inserted: Nothing in this subsection shall be construed to authorize the disclosure of any information that is exempt from disclosure under section 552(b) of title 5.]
[struck: Nothing in this subsection shall be construed to authorize the disclosure of any information that is exempt from disclosure under section 552(b) of title 5.]
(D) Review of plans and documents.—
(i) Timing.—
(I) In general.— Not later than 2 years after the date of promulgation of the regulations under subparagraph (A), and not less frequently than once every 5 years thereafter, the Secretary or relevant State authority with a certification in effect under section 60105 shall review the distribution integrity management plan, the emergency response plan, and the procedural manual for operations, maintenance, and emergencies of each operator of a distribution system and record the results of that review for use in the next review of the program of that operator.
Rest of § 60109 unchanged ·