Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

49 U.S.C. § 60133 Coordination of environmental reviews

+2 −2Shown
More for 49 U.S.C. § 60133
Read § 60133
2 changes the bill asks for here, 2 carried out
  1. Carried out:

    in subsection (a)(5), by striking and local and inserting , local, and Tribal; and

  2. Carried out:

    in subsection (c)(2), by inserting Tribal, after State,.

§ 60133(a)–(d)

Start of § 60133 to (a)(3) unchanged ·

(4) Memorandum of understanding.— Based upon the evaluation required under paragraph (3) and not later than 1 year after the date of enactment of this section, the members of the Interagency Committee shall enter into a memorandum of understanding to provide for a coordinated and expedited pipeline repair permit review process to carry out the purpose set forth in paragraph (1). The Interagency Committee shall include provisions in the memorandum of understanding identifying those repairs or categories of repairs described in paragraph (1) for which the best practices identified under paragraph (3), when properly employed by a pipeline operator, would result in no more than minimal adverse effects on the environment and for which discretionary administrative reviews may therefore be minimized or eliminated. With respect to pipeline repairs described in paragraph (1) to which the preceding sentence would not be applicable, the Interagency Committee shall include provisions to enable pipeline operators to commence and complete all activities necessary to carry out pipeline repairs within any time periods specified by rule by the Secretary. The Interagency Committee shall include in the memorandum of understanding criteria under which permits required for such pipeline repair activities should be prioritized over other less urgent agency permit application reviews. The Interagency Committee shall not enter into a memorandum of understanding under this paragraph except by unanimous agreement of the members of the Interagency Committee.

(5) State and local consultation.— In carrying out this subsection, the Interagency Committee shall consult with appropriate State[inserted: ,] [inserted: local, ]and [struck: local][inserted: Tribal] environmental, pipeline safety, and emergency response officials, and such other officials as the Interagency Committee considers appropriate.

(b) Implementation.— Not later than 180 days after the completion of the memorandum of understanding required under subsection (a)(4), each agency represented on the Interagency Committee shall revise its regulations as necessary to implement the provisions of the memorandum of understanding.

(c) Savings Provisions; No Preemption.— Nothing in this section shall be construed—

(1) to require a pipeline operator to obtain a Federal permit, if no Federal permit would otherwise have been required under Federal law; or

(2) to preempt applicable Federal, State, [inserted: Tribal, ]or local environmental law.

(d) Interim Operational Alternatives.—

(1) In general.— Not later than 30 days after the date of enactment of this section, and subject to the limitations in paragraph (2), the Secretary of Transportation shall revise the regulations of the Department, to the extent necessary, to permit a pipeline operator subject to time periods for repair specified by rule by the Secretary to implement alternative mitigation measures until all applicable permits have been granted.