Title 49 · TransportationTransportation
Changes to 49 U.S.C. § 60134
S. 2975 · Pipeline Integrity, Protection, and Enhancement for Leveraging Investments in the Nation's Energy to assure Safety Act of 2025 · Engrossed The official text as one chamber (House or Senate) passed it.
PIPELINE Safety Act of 2025
Passed the Senate · step 3 of 5
49 U.S.C. § 60134 State damage prevention programs
8 changes the bill asks for here, 8 carried out
- Carried out:
Section 60134(i) of title 49, United States Code, is amended by striking
$1,500,000 for each of fiscal years 2021 through 2023. Such funds shall remain
and inserting$3,000,000 for each of fiscal years 2026 through 2030, to remain
. - Carried out:
in the subsection heading, by inserting
State
beforeDamage
; - Carried out:
by redesignating paragraphs (1) through (9) as subparagraphs (A) through (I), respectively;
- Carried out:
in the matter preceding subparagraph (A) (as so redesignated), by striking An and inserting the following:(1) In general.— An;
- Carried out:
by adding at the end the following:
(J) A State one-call program that includes, or is making substantial progress toward including, the one-call leading practices described in paragraph (2).; and
- Carried out:
by adding at the end the following:
(2) One-call leading practices.— The one-call leading practices referred to in paragraph (1)(J) are the following: (A) Restricting the size or scope of a one-call ticket for standard locate requests (which may include process exceptions for special large project tickets). (B) …
- Carried out:
by striking In and inserting the following:(1) In general.— In; and
- Carried out:
by adding at the end the following:
(2) Evaluation criteria.— The evaluation criteria used by the Secretary for determining the effectiveness of a State damage prevention program shall include consideration of whether the State, at a minimum— (A) engages in effective, active, and meaningful enforcement of State …
§ 60134(a)–(e)
Start of § 60134 to (a)(2)(A) unchanged ·
(B) demonstrates that it has made substantial progress toward establishing such a program, and that such program will meet the requirements of subsection (b); and
(3) does not provide any exemptions to municipalities, State agencies, or their contractors from the one-call notification system requirements of the program.
(b) [inserted: State ]Damage Prevention Program Elements.—
(1) [inserted: In general.—] [inserted: An effective damage prevention program includes the following elements:]
[struck: An effective damage prevention program includes the following elements:]
[struck: (1)] [inserted: (A)] Participation by operators, excavators, and other stakeholders in the development and implementation of methods for establishing and maintaining effective communications between stakeholders from receipt of an excavation notification until successful completion of the excavation, as appropriate.
[struck: (2)] [inserted: (B)] A process for fostering and ensuring the support and partnership of stakeholders, including excavators, operators, locators, designers, and local government in all phases of the program.
[struck: (3)] [inserted: (C)] A process for reviewing the adequacy of a pipeline operator’s internal performance measures regarding persons performing locating services and quality assurance programs.
[struck: (4)] [inserted: (D)] Participation by operators, excavators, and other stakeholders in the development and implementation of effective employee training programs to ensure that operators, the one-call center, the enforcing agency, and the excavators have partnered to design and implement training for the employees of operators, excavators, and locators.
[struck: (5)] [inserted: (E)] A process for fostering and ensuring active participation by all stakeholders in public education for damage prevention activities.
[struck: (6)] [inserted: (F)] A process for resolving disputes that defines the State authority’s role as a partner and facilitator to resolve issues.
[struck: (7)] [inserted: (G)] Enforcement of State damage prevention laws and regulations for all aspects of the damage prevention process, including public education, and the use of civil penalties for violations assessable by the appropriate State authority.
[struck: (8)] [inserted: (H)] A process for fostering and promoting the use, by all appropriate stakeholders, of improving technologies that may enhance communications, underground pipeline locating capability, and gathering and analyzing information about the accuracy and effectiveness of locating programs.
[struck: (9)] [inserted: (I)] A process for review and analysis of the effectiveness of each program element, including a means for implementing improvements identified by such program reviews.
(J) [inserted: A State one-call program that includes, or is making substantial progress toward including, the one-call leading practices described in paragraph (2).]
(2) [inserted: One-call leading practices.—] [inserted: The one-call leading practices referred to in paragraph (1)(J) are the following:]
(A) [inserted: Restricting the size or scope of a one-call ticket for standard locate requests (which may include process exceptions for special large project tickets).]
(B) [inserted: Restricting the longevity of a one-call ticket for standard locate requests (which may include process exceptions for special large project tickets).]
(C) [inserted: Specifying tolerance (soft-dig only) zone horizontal dimensions.]
(D) [inserted: Specifying tolerance zone requirements.]
(E) [inserted: Specifying emergency excavation notification requirements.]
(F) [inserted: Specifying the responsibilities of excavators, including the reporting of damages or suspected damages.]
(G) [inserted: Defining who is an excavator and what is considered excavation.]
(H) [inserted: Requiring the use of white-lining.]
(I) [inserted: Requiring a positive response before excavation begins, such as a utility, municipality, or other entity that places the relevant marks positively responding to the notification center, and the excavator checking for that positive response before beginning excavation.]
(J) [inserted: Requiring that newly installed underground facilities be locatable with commercially available technology.]
(K) [inserted: Requiring the marking of sewer lines and laterals.]
(L) [inserted: Specifying the qualifications of, and requirements for, those excavators performing trenchless excavation activities that are not subject to pipeline construction requirements under part 192 or 195 of title 49, Code of Federal Regulations (or successor regulations).]
(c) Factors to Consider.—
(1) [inserted: In general.—] [inserted: In making grants under this section, the Secretary shall take into consideration the commitment of each State to ensuring the effectiveness of its damage prevention program, including legislative and regulatory actions taken by the State.]
(2) [inserted: Evaluation criteria.—] [inserted: The evaluation criteria used by the Secretary for determining the effectiveness of a State damage prevention program shall include consideration of whether the State, at a minimum—]
(A) [inserted: engages in effective, active, and meaningful enforcement of State one-call laws, including the efficacy of fines and penalties;]
(B) [inserted: requires reporting to the local one-call center of excavation damage events that affect pipelines and other underground facilities that are not privately owned, including (to the extent available at the time of the reporting)—]
(i) [inserted: information about the nature of the incident, including its apparent cause;]
(ii) [inserted: the organizations involved;]
(iii) [inserted: the impact to public safety, utility operations, and customer service; and]
(iv) [inserted: the impact to the environment; and]
(C) [inserted: limits exemptions to State damage prevention laws.]
[struck: In making grants under this section, the Secretary shall take into consideration the commitment of each State to ensuring the effectiveness of its damage prevention program, including legislative and regulatory actions taken by the State.]
(d) Application.— If a State authority files an application for a grant under this section not later than September 30 of a calendar year and demonstrates that the Governor (or chief executive) of the State has designated it as the appropriate State authority to receive the grant, the Secretary shall review the State’s damage prevention program to determine its effectiveness.
(e) Use of Funds.— A grant under this section to a State authority may only be used to pay the cost of the personnel, equipment, and activities that the State authority reasonably requires for the calendar year covered by the grant to develop or carry out its damage prevention program in accordance with subsection (b).
§ 60134(h)–(i)
(f)–(g) unchanged ·
(h) Damage Prevention Process Defined.— In this section, the term “damage prevention process” means a process that incorporates the principles described in sections 60114(b), 60114(d), and 60114(e).
(i) Authorization of Appropriations.— There is authorized to be appropriated to the Secretary to provide grants under this section $[struck: 1][inserted: 3],[struck: 500][inserted: 000],000 for each of fiscal years [struck: 2021][inserted: 2026] through [struck: 2023.][inserted: 2030,] [struck: Such][inserted: to] [struck: funds shall ]remain available until expended.