Skip to content
The People's CodeSearch
Menu

Title 49 · TransportationTransportation

Changes to 49 U.S.C. § 60101

S. 2979 · PHMSA Voluntary Information Sharing Act ·

In committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

49 U.S.C. § 60101 Definitions

+72 −5210 of 23 shown
More for 49 U.S.C. § 60101
Read § 60101
23 changes the bill asks for here, 10 carried out
  1. Carried out:

    by redesignating paragraphs (17) through (26) as paragraphs (18), (19), (20), (25), (26), (27), (22), (23), (24), and (28), respectively, and moving the paragraphs so as to appear in numerical order;

  2. Not carried out:

    by redesignating paragraphs (17) through (26) as paragraphs (18), (19), (20), (25), (26), (27), (22), (23), (24), and (28), respectively, and moving the paragraphs so as to appear in numerical order;

    We can't read how this instruction is worded yet, so it isn't shown in the text.

    Technical detailno-pattern: moving the paragraphs so as to appear in numerical order;
  3. Carried out:

    by inserting after paragraph (16) the following:(17) Nonpublic information.— The term “nonpublic information” means any pipeline safety data or information, regardless of form or format, that— (A) a company does not disclose, disseminate, or make available to the public; or (B) is not otherwise in the public domain.; and

  4. Carried out:

    by inserting after paragraph (20) (as so redesignated) the following:(21) Public information.— The term “public information” means any data or information, regardless of form or format, that— (A) a company discloses, disseminates, or makes available to the public; or (B) is otherwise in the public domain..

  5. Carried out:

    in the matter preceding paragraph (1), by striking chapter— and inserting chapter:;

  6. Not carried out:

    in each of paragraphs (1) through (16), (18), (19), (20), (22) (23), (25), and (27), by striking the semicolon at the end of the paragraph and inserting a period;

    We can't read how this instruction is worded yet, so it isn't shown in the text.

    Technical detailno-pattern: (X), (X), (X), (X) (X), (X), and (X), by striking the semicolon at the end of the paragraph and inserting a period;
  7. Not carried out:

    by striking the paragraph designation and all that follows through (A) means in subparagraph (A) and inserting the following:(1) Existing liquefied natural gas facility.— (A) In general.— The term “existing liquefied natural gas facility” means;

    We can't read how this instruction is worded yet, so it isn't shown in the text.

    Technical detailno-pattern: striking the paragraph designation and all that follows through QTEXT in subparagraph (X) and inserting the following: QCONTENT;
  8. Carried out:

    in subparagraph (A)(ii), by striking ; but and inserting a period; and

  9. Not carried out:

    by striking (B) does not and inserting the following:(B) Exclusions.— The term existing liquefied natural gas facility does not; and

    The bill gives this provision a heading and rewords it at the same time, a kind of change we can't show yet.

    Technical detailthe provision inserted says more than a heading and the words struck
  10. Carried out:

    by inserting described in subparagraph (A) after approval;

  11. Not carried out:

    by striking the paragraph designation and all that follows through (A) means in subparagraph (A) and inserting the following:(14) Liquefied natural gas pipeline facility.— (A) In general.— The term “liquefied natural gas pipeline facility” means;

    We can't read how this instruction is worded yet, so it isn't shown in the text.

    Technical detailno-pattern: striking the paragraph designation and all that follows through QTEXT in subparagraph (X) and inserting the following: QCONTENT;
  12. Carried out:

    in subparagraph (A), by striking ; but and inserting a period; and

  13. Not carried out:

    in subparagraph (B), by striking (B) does not and inserting the following:(B) Exclusions.— The term liquefied natural gas pipeline facility does not;

    The bill gives this provision a heading and rewords it at the same time, a kind of change we can't show yet.

    Technical detailthe provision inserted says more than a heading and the words struck
  14. Not carried out:

    in paragraph (24) (relating to the term Secretary), by striking ; and and inserting a period;

    We can't read how this instruction is worded yet, so it isn't shown in the text.

    Technical detailno-pattern: (relating to the term secretary), by striking QTEXT and inserting a period;
  15. Not carried out:

    by striking the paragraph designation and all that follows through (A) means in subparagraph (A) and inserting the following:(26) Transporting gas.— (A) In general.— The term “transporting gas” means;

    We can't read how this instruction is worded yet, so it isn't shown in the text.

    Technical detailno-pattern: striking the paragraph designation and all that follows through QTEXT in subparagraph (X) and inserting the following: QCONTENT;
  16. Carried out:

    in subparagraph (A)(ii), by striking ; but and inserting a period; and

  17. Carried out:

    by striking subparagraph (B) and inserting the following:(B) Exclusions.— The term “transporting gas” does not include— (i) gathering gas (except through regulated gathering lines) in a rural area outside a populated area designated by the Secretary as a nonrural area; or (ii) the movement of gas by the owner or operator of a plant …

  18. Not carried out:

    by striking the paragraph designation and all that follows through (A) means in subparagraph (A) and inserting the following:(27) Transporting hazardous liquid.— (A) In general.— The term “transporting hazardous liquid” means;

    We can't read how this instruction is worded yet, so it isn't shown in the text.

    Technical detailno-pattern: striking the paragraph designation and all that follows through QTEXT in subparagraph (X) and inserting the following: QCONTENT;
  19. Carried out:

    in subparagraph (A)(ii), by striking ; but and inserting a period; and

  20. Not carried out:

    in subparagraph (B), by striking (B) does not and inserting the following:(B) Exclusions.— The term transporting hazardous liquid does not; and

    The bill gives this provision a heading and rewords it at the same time, a kind of change we can't show yet.

    Technical detailthe provision inserted says more than a heading and the words struck
  21. Not carried out:

    in each of paragraphs (2) through (13), (15), (16), (18), (19), (20), (22) through (25), and (28)—

    We can't read how this instruction is worded yet, so it isn't shown in the text.

    Technical detailno-pattern: (X), (X), (X), (X), (X), (X) through (X), and (X) —
  22. Not carried out:

    by inserting The term after the paragraph designation; and

    We can't read how this instruction is worded yet, so it isn't shown in the text.

    Technical detailno-pattern: inserting QTEXT after the paragraph designation; and
  23. Not carried out:

    by inserting a paragraph heading, the text of which comprises the term defined in the paragraph.

    We can't read how this instruction is worded yet, so it isn't shown in the text.

    Technical detailno-pattern: inserting a paragraph heading, the text of which comprises the term defined in the paragraph.

§ 60101(a)

§ 60101. Definitions

(a) General.— In this chapter[struck: —][inserted: :]

(1) “existing liquefied natural gas facility”—

(A) means a liquefied natural gas facility for which an application to approve the site, construction, or operation of the facility was filed before March 1, 1978, with—

(i) the Federal Energy Regulatory Commission (or any predecessor); or

(ii) the appropriate State or local authority, if the facility is not subject to the jurisdiction of the Commission under the Natural Gas Act (15 U.S.C. 717 et seq.)[struck: ; but][inserted: .]

(B) does not include a facility on which construction is begun after November 29, 1979, without the approval[inserted: described in subparagraph (A)];

(2) “gas” means natural gas, flammable gas, or toxic or corrosive gas;

(3) “gas pipeline facility” includes a pipeline, a right of way, a facility, a building, or equipment used in transporting gas or treating gas during its transportation;

§ 60101(a)–(b)

(a)(4)–(13) unchanged ·

(14) “liquefied natural gas pipeline facility”—

(A) means a gas pipeline facility used for transporting or storing liquefied natural gas, or for liquefied natural gas conversion, in interstate or foreign commerce[struck: ; but][inserted: .]

(B) does not include any part of a structure or equipment located in navigable waters (as defined in section 3 of the Federal Power Act (16 U.S.C. 796));

(15) “municipality” means a political subdivision of a State;

(16) “new liquefied natural gas pipeline facility” means a liquefied natural gas pipeline facility except an existing liquefied natural gas pipeline facility;

(17) [inserted: Nonpublic information.—] [inserted: The term “nonpublic information” means any pipeline safety data or information, regardless of form or format, that—]

(A) [inserted: a company does not disclose, disseminate, or make available to the public; or]

(B) [inserted: is not otherwise in the public domain.]

[struck: (17)] [inserted: (18)] “person”, in addition to its meaning under section 1 of title 1 (except as to societies), includes a State, a municipality, and a trustee, receiver, assignee, or personal representative of a person;

[struck: (18)] [inserted: (19)] “pipeline facility” means a gas pipeline facility and a hazardous liquid pipeline facility;

[struck: (19)] [inserted: (20)] “pipeline transportation” means transporting gas and transporting hazardous liquid;

(21) [inserted: Public information.—] [inserted: The term “public information” means any data or information, regardless of form or format, that—]

(A) [inserted: a company discloses, disseminates, or makes available to the public; or]

(B) [inserted: is otherwise in the public domain.]

[struck: (20)] [inserted: (25)] “State” means a State of the United States, the District of Columbia, and Puerto Rico;

[struck: (21)] [inserted: (26)] “transporting gas”—

(A) means—

(i) the gathering, transmission, or distribution of gas by pipeline, or the storage of gas, in interstate or foreign commerce; and

(ii) the movement of gas through regulated gathering lines[struck: ; but][inserted: .]

(B) [inserted: Exclusions.—] [inserted: The term “transporting gas” does not include—]

(i) [inserted: gathering gas (except through regulated gathering lines) in a rural area outside a populated area designated by the Secretary as a nonrural area; or]

(ii) [inserted: the movement of gas by the owner or operator of a plant for use as a fuel, a feedstock, or for any other purpose that directly supports plant operations through—]

(I) [inserted: in-plant piping systems that are located entirely on the grounds of the plant; or]

(II) [inserted: transfer piping systems that extend less than 1 mile in length outside the grounds of the plant.]

[struck: does not include gathering gas (except through regulated gathering lines) in a rural area outside a populated area designated by the Secretary as a nonrural area;]

[struck: (22)] [inserted: (27)] “transporting hazardous liquid”—

(A) means—

(i) the movement of hazardous liquid by pipeline, or the storage of hazardous liquid incidental to the movement of hazardous liquid by pipeline, in or affecting interstate or foreign commerce; and

(ii) the movement of hazardous liquid through regulated gathering lines[struck: ; but][inserted: .]

(B) does not include moving hazardous liquid through—

(i) gathering lines (except regulated gathering lines) in a rural area;

(ii) onshore production, refining, or manufacturing facilities; or

(iii) storage or in-plant piping systems associated with onshore production, refining, or manufacturing facilities;

[struck: (23)] [inserted: (22)] “risk management” means the systematic application, by the owner or operator of a pipeline facility, of management policies, procedures, finite resources, and practices to the tasks of identifying, analyzing, assessing, reducing, and controlling risk in order to protect employees, the general public, the environment, and pipeline facilities;

[struck: (24)] [inserted: (23)] “risk management plan” means a management plan utilized by a gas or hazardous liquid pipeline facility owner or operator that encompasses risk management;

[struck: (25)] [inserted: (24)] “Secretary” means the Secretary of Transportation; and

[struck: (26)] [inserted: (28)] “underground natural gas storage facility” means a gas pipeline facility that stores natural gas in an underground facility, including—

(A) a depleted hydrocarbon reservoir;

(B) an aquifer reservoir; or

(C) a solution-mined salt cavern reservoir.

(b) Gathering Lines.—

(1)

(A) Not later than October 24, 1994, the Secretary shall prescribe standards defining the term “gathering line”.

Rest of § 60101 unchanged ·

Step through the changes