16 U.S.C. § 824o Electric reliability
4 changes the bill asks for here, 4 carried out
- Carried out:
by striking The ERO and inserting the following:(1) In general.— The ERO; and
- Carried out:
by adding at the end the following:
(2) Annual long-term assessment.— The assessments under paragraph (1) shall include an annual long-term assessment, which shall include— (A) an analysis of the ability of the bulk-power system to supply sufficient electric energy to maintain an adequate level of reliability, …
- Carried out:
by redesignating subsections (h) through (k) as subsections (i) through (l), respectively; and
- Carried out:
by inserting after subsection (g) the following:
(h) Commission review and comment for covered agency actions.— (1) Definitions.— In this subsection: (A) Covered agency action.— The term “covered agency action” means a regulation that— (i) relates to, or otherwise directly affects, any generation resource in the bulk-power …
§ 824o(f)–(iv)
Start of § 824o to (e)(6) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (f) | (f) Changes in Electric Reliability Organization rules | (f) Changes in Electric Reliability Organization rules | ||
| The Electric Reliability Organization shall file with the Commission for approval any proposed rule or proposed rule change, accompanied by an explanation of its basis and purpose. The Commission, upon its own motion or complaint, may propose a change to the rules of the ERO. A proposed rule or proposed rule change shall take effect upon a finding by the Commission, after notice and opportunity for comment, that the change is just, reasonable, not unduly discriminatory or preferential, is in the public interest, and satisfies the requirements of subsection (c). | The Electric Reliability Organization shall file with the Commission for approval any proposed rule or proposed rule change, accompanied by an explanation of its basis and purpose. The Commission, upon its own motion or complaint, may propose a change to the rules of the ERO. A proposed rule or proposed rule change shall take effect upon a finding by the Commission, after notice and opportunity for comment, that the change is just, reasonable, not unduly discriminatory or preferential, is in the public interest, and satisfies the requirements of subsection (c). | |||
| (g) | (g) Reliability reports | (g) Reliability reports | ||
| (g)(1) | (1) [inserted: In general.—] | |||
| [inserted: The ERO shall conduct periodic assessments of the reliability and adequacy of the bulk-power system in North America.] | ||||
| (g)(2) | (2) [inserted: Annual long-term assessment.—] | |||
| [inserted: The assessments under paragraph (1) shall include an annual long-term assessment, which shall include—] | ||||
| (g)(2)(A) | (A) [inserted: ] | |||
| [inserted: an analysis of the ability of the bulk-power system to supply sufficient electric energy to maintain an adequate level of reliability, taking into account—] | ||||
| (g)(2)(A)(i) | (i) [inserted: ] | |||
| [inserted: generation resource mix;] | ||||
| (g)(2)(A)(ii) | (ii) [inserted: ] | |||
| [inserted: transmission development; and] | ||||
| (g)(2)(A)(iii) | (iii) [inserted: ] | |||
| [inserted: electric energy demand trends;] | ||||
| (g)(2)(B) | (B) [inserted: ] | |||
| [inserted: an analysis of—] | ||||
| (g)(2)(B)(i) | (i) [inserted: ] | |||
| [inserted: the risk of future electric energy supply shortfalls under normal and extreme weather conditions; and] | ||||
| (g)(2)(B)(ii) | (ii) [inserted: ] | |||
| [inserted: the risk of any such shortfalls within each region of the bulk-power system; and] | ||||
| (g)(2)(C) | (C) [inserted: ] | |||
| [inserted: a determination of whether additional generation resources are necessary to supply sufficient electric energy to maintain an adequate level of reliability during the assessment period.] | ||||
| (g)(3) | (3) [inserted: Notice of generation inadequacy.—] | |||
| [inserted: In conducting a long-term assessment under paragraph (2), if the ERO determines that the bulk-power system is at risk of not having adequate generation resources to supply sufficient electric energy to maintain an adequate level of reliability, the ERO shall publicly notify the Commission that the bulk-power system is in a state of generation inadequacy.] | ||||
| (g)(4) | (4) [inserted: Data collection.—] | |||
| [inserted: To conduct a long-term assessment under paragraph (2), the ERO may collect information and data from users, owners, and operators of the bulk-power system.] | ||||
| (h) | (h) [inserted: Commission review and comment for covered agency actions.—] | |||
| (h)(1) | (1) [inserted: Definitions.—] | |||
| [inserted: In this subsection:] | ||||
| (h)(1)(A) | (A) [inserted: Covered agency action.—] | |||
| [inserted: The term “covered agency action” means a regulation that—] | ||||
| (h)(1)(A)(i) | (i) [inserted: ] | |||
| [inserted: relates to, or otherwise directly affects, any generation resource in the bulk-power system; and] | ||||
| (h)(1)(A)(ii) | (ii) [inserted: ] | |||
| [inserted: on the date on which the applicable Federal agency receives notice from the Commission under paragraph (2)—] | ||||
| (h)(1)(A)(ii)(I) | (I) [inserted: ] | |||
| [inserted: is under development to be proposed; or] | ||||
| (h)(1)(A)(ii)(II) | (II) [inserted: ] | |||
| [inserted: is otherwise under consideration in a rulemaking proceeding.] | ||||
| (h)(1)(B) | (B) [inserted: Federal agency.—] | |||
| [inserted: The term “Federal agency” means an Executive department (as defined in section 101 of title 5, United States Code) or any other Executive agency the head of which holds a Cabinet-level position.] | ||||
| (h)(2) | (2) [inserted: Notice to Federal agencies.—] | |||
| [inserted: If the ERO notifies the Commission under subsection (g)(3) that the bulk-power system is in a state of generation inadequacy, the Commission shall promptly notify the Department of Energy, the Environmental Protection Agency, and any other Federal agency the Commission determines appropriate of that state of generation inadequacy.] | ||||
| (h)(3) | (3) [inserted: Submission of covered agency actions to the Commission.—] | |||
| (h)(3)(A) | (A) [inserted: In general.—] | |||
| [inserted: Not later than the applicable date described in subparagraph (B), the head of each Federal agency that receives a notification under paragraph (2) shall submit to the Commission for review and comment any covered agency action of the Federal agency.] | ||||
| (h)(3)(B) | (B) [inserted: Date described.—] | |||
| [inserted: The date referred to in subparagraph (A) is—] | ||||
| (h)(3)(B)(i) | (i) [inserted: ] | |||
| [inserted: the first date on which the applicable covered agency action is provided to the Office of Management and Budget or any other Federal agency for review and comment;] | ||||
| (h)(3)(B)(ii) | (ii) [inserted: ] | |||
| [inserted: if the applicable covered agency action is not provided to the Office of Management and Budget or any other Federal agency for review and comment, the date that is 90 days before the date on which the covered agency action is published in the Federal Register or otherwise made available for public inspection or comment; or] | ||||
| (h)(3)(B)(iii) | (iii) [inserted: ] | |||
| [inserted: if, as of the date on which the Federal agency receives the applicable notification under paragraph (2), the covered agency action has already been provided to the Office of Management and Budget or any other Federal agency for review and comment, or has already been published in the Federal Register or otherwise made available for public inspection or comment, the date that is 60 days after the date on which the Federal agency received the notification.] | ||||
| (h)(4) | (4) [inserted: Commission comments.—] | |||
| [inserted: The Commission, in consultation with the ERO and transmission organizations, shall, by order, provide to the Federal agency head that submitted to the Commission a covered agency action under paragraph (3)—] | ||||
| (h)(4)(A) | (A) [inserted: ] | |||
| [inserted: comments on the covered agency action, which may include an assessment of the effect of the covered agency action on rates, terms, and conditions for services pursuant to the authority of the Commission under sections 201 and 206; and] | ||||
| (h)(4)(B) | (B) [inserted: ] | |||
| [inserted: if applicable, recommendations for modifications to the covered agency action to prevent a significant negative impact on the ability of the bulk-power system to supply sufficient electric energy to maintain an adequate level of reliability.] | ||||
| (h)(5) | (5) [inserted: Agency response.—] | |||
| [inserted: The head of a Federal agency may not finalize a covered agency action that is submitted to the Commission under paragraph (3) until—] | ||||
| (h)(5)(A) | (A) [inserted: ] | |||
| [inserted: the agency head responds in writing to the Commission with an explanation of how the agency head modified, or why the agency head determined not to modify, the covered agency action in response to any comments and recommendations provided by the Commission under paragraph (4); and] | ||||
| (h)(5)(B) | (B) [inserted: ] | |||
| [inserted: the Commission determines that the covered agency action is not likely to have a significant negative impact on the ability of the bulk-power system to supply sufficient electric energy to maintain an adequate level of reliability.] | ||||
| (h)(6) | (6) [inserted: Public availability of comments and responses.—] | |||
| [inserted: A Federal agency head shall include any comments, recommendations, and responses relating to the covered agency action under paragraphs (4) and (5) in—] | ||||
| (h)(6)(A) | (A) [inserted: ] | |||
| [inserted: any submission of the covered agency action to the Federal Register for publication; and] | ||||
| (h)(6)(B) | (B) [inserted: ] | |||
| [inserted: any other place in which the covered agency action is otherwise made available for public inspection or comment.] | ||||
| (g) | ||||
| (i) | [inserted: (i)] Coordination with Canada and Mexico | |||
| The President is urged to negotiate international agreements with the governments of Canada and Mexico to provide for effective compliance with reliability standards and the effectiveness of the ERO in the United States and Canada or Mexico. | The President is urged to negotiate international agreements with the governments of Canada and Mexico to provide for effective compliance with reliability standards and the effectiveness of the ERO in the United States and Canada or Mexico. | |||
| (ii) | [inserted: (ii)] Savings provisions | |||
| (ii)(1) | (1) | (1) | ||
| The ERO shall have authority to develop and enforce compliance with reliability standards for only the bulk-power system. | The ERO shall have authority to develop and enforce compliance with reliability standards for only the bulk-power system. | |||
| (ii)(2) | (2) | (2) | ||
| This section does not authorize the ERO or the Commission to order the construction of additional generation or transmission capacity or to set and enforce compliance with standards for adequacy or safety of electric facilities or services. | This section does not authorize the ERO or the Commission to order the construction of additional generation or transmission capacity or to set and enforce compliance with standards for adequacy or safety of electric facilities or services. | |||
| (ii)(3) | (3) | (3) | ||
| Nothing in this section shall be construed to preempt any authority of any State to take action to ensure the safety, adequacy, and reliability of electric service within that State, as long as such action is not inconsistent with any reliability standard, except that the State of New York may establish rules that result in greater reliability within that State, as long as such action does not result in lesser reliability outside the State than that provided by the reliability standards. | Nothing in this section shall be construed to preempt any authority of any State to take action to ensure the safety, adequacy, and reliability of electric service within that State, as long as such action is not inconsistent with any reliability standard, except that the State of New York may establish rules that result in greater reliability within that State, as long as such action does not result in lesser reliability outside the State than that provided by the reliability standards. | |||
| (ii)(4) | (4) | (4) | ||
| Within 90 days of the application of the Electric Reliability Organization or other affected party, and after notice and opportunity for comment, the Commission shall issue a final order determining whether a State action is inconsistent with a reliability standard, taking into consideration any recommendation of the ERO. | Within 90 days of the application of the Electric Reliability Organization or other affected party, and after notice and opportunity for comment, the Commission shall issue a final order determining whether a State action is inconsistent with a reliability standard, taking into consideration any recommendation of the ERO. | |||
| (ii)(5) | (5) | (5) | ||
| The Commission, after consultation with the ERO and the State taking action, may stay the effectiveness of any State action, pending the Commission’s issuance of a final order. | The Commission, after consultation with the ERO and the State taking action, may stay the effectiveness of any State action, pending the Commission’s issuance of a final order. | |||
| (iii) | [inserted: (iii)] Regional advisory bodies | |||
| The Commission shall establish a regional advisory body on the petition of at least two-thirds of the States within a region that have more than one-half of their electric load served within the region. A regional advisory body shall be composed of one member from each participating State in the region, appointed by the Governor of each State, and may include representatives of agencies, States, and provinces outside the United States. A regional advisory body may provide advice to the Electric Reliability Organization, a regional entity, or the Commission regarding the governance of an existing or proposed regional entity within the same region, whether a standard proposed to apply within the region is just, reasonable, not unduly discriminatory or preferential, and in the public interest, whether fees proposed to be assessed within the region are just, reasonable, not unduly discriminatory or preferential, and in the public interest and any other responsibilities requested by the Commission. The Commission may give deference to the advice of any such regional advisory body if that body is organized on an Interconnection-wide basis. | The Commission shall establish a regional advisory body on the petition of at least two-thirds of the States within a region that have more than one-half of their electric load served within the region. A regional advisory body shall be composed of one member from each participating State in the region, appointed by the Governor of each State, and may include representatives of agencies, States, and provinces outside the United States. A regional advisory body may provide advice to the Electric Reliability Organization, a regional entity, or the Commission regarding the governance of an existing or proposed regional entity within the same region, whether a standard proposed to apply within the region is just, reasonable, not unduly discriminatory or preferential, and in the public interest, whether fees proposed to be assessed within the region are just, reasonable, not unduly discriminatory or preferential, and in the public interest and any other responsibilities requested by the Commission. The Commission may give deference to the advice of any such regional advisory body if that body is organized on an Interconnection-wide basis. | |||
| (iv) | [inserted: (iv)] Alaska and Hawaii | |||
| The provisions of this section do not apply to Alaska or Hawaii. | The provisions of this section do not apply to Alaska or Hawaii. | |||