Changes to the Code
S. 3222 · Stop Shut-Offs During Shutdowns Act · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
16 U.S.C. § 2625 Special rules for standards
13 changes the bill asks for here, 6 carried out
- Not carried out:
by striking
such service may not be terminated.
in the undesignated matter following subparagraph (B);We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: striking QTEXT in the undesignated matter following subparagraph (X); - Carried out:
by striking the comma at the end and inserting
; and
; and - Not carried out:
by striking (B) he is and inserting the following:(ii) is;
The bill puts these words in a provision numbered (ii), which can't be the first one in § 2625(g)(2)(B), so we couldn't tell where it goes.
Technical detail
(ii) can't be the first provision of /us/usc/t16/s2625/g/2/B - Carried out:
by striking
, or
at the end and inserting; or
; and - Not carried out:
by striking (A) he is and inserting the following:(i) is; and
The bill turns “(A) he is” into a provision of its own, but in § 2625(g)(2)(A) the text doesn't begin with those words. The law may have changed since the bill was drafted.
Technical detail
“(A) he is” does not open the text of /us/usc/t16/s2625/g/2/A - Carried out:
by striking
and such consumer establishes that
and insertingif the consumer establishes that the consumer
; and - Not carried out:
by striking (2) during any period when termination of service to an electric consumer and inserting the following:(B) no electric service to an electric consumer may be terminated during any period in which such termination;
The bill puts these words in a provision numbered (B), which can't be the first one in § 2625(g)(2), so we couldn't tell where it goes.
Technical detail
(B) can't be the first provision of /us/usc/t16/s2625/g/2 - Carried out:
by striking
, and
at the end and inserting a semicolon;
and - Not carried out:
by striking (1) no and inserting the following:(A) no;
The bill turns “(1) no” into a provision of its own, but in § 2625(g)(1) the text doesn't begin with those words. The law may have changed since the bill was drafted.
Technical detail
“(1) no” does not open the text of /us/usc/t16/s2625/g/1 - Not carried out:
in the matter preceding subparagraph (A) (as so redesignated), by striking The procedures and inserting the following:(1) Procedures.— The procedures;
§ 2625(g) already has provisions of its own, so its opening words can't simply become the first of them.
Technical detail
/us/usc/t16/s2625/g has provisions already, so its words can't become the first - Not carried out:
in the undesignated matter following paragraph (1)(B)(ii) (as so redesignated), by striking Such procedures and inserting the following:
(2) Requirement.— The procedures under paragraph (1);
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: in the undesignated matter following paragraph (X) (X) (X) (as so redesignated), by striking QTEXT and inserting the following: QCONTENT; - Carried out:
in paragraph (1) (as so redesignated), by adding at the end the following:
(C) no electric service to an electric consumer may be terminated during any period in which interim continuing appropriations or full-year appropriations are not in effect for the Department of Health and Human Services.; and
- Carried out:
by adding at the end the following:
(3) Recovery of certain costs.— Costs incurred by an electric utility to comply with paragraph (1)(C) may not be retroactively assessed on electric consumers for whom electric service would have been terminated if not for the requirements of that paragraph, but a State …
§ 2625(g)–(h)
Start of § 2625 to (f)(3) unchanged ·
(g) Procedures for termination of electric service The procedures for termination of service referred to in section 2623(b)(4) of this title are procedures prescribed by the State regulatory authority (with respect to electric utilities for which it has ratemaking authority) or by the nonregulated electric utility which provide that—
(1) no electric service to an electric consumer may be terminated unless reasonable prior notice (including notice of rights and remedies) is given to such consumer and such consumer has a reasonable opportunity to dispute the reasons for such termination[struck: , and][inserted: ;]
(C) [inserted: no electric service to an electric consumer may be terminated during any period in which interim continuing appropriations or full-year appropriations are not in effect for the Department of Health and Human Services.]
(2) during any period when termination of service to an electric consumer would be especially dangerous to health, as determined by the State regulatory authority (with respect to an electric utility for which it has ratemaking authority) or nonregulated electric utility, [struck: and][inserted: if] [struck: such][inserted: the] consumer establishes that[inserted: the consumer]—
(A) he is unable to pay for such service in accordance with the requirements of the utility’s billing[struck: ,][inserted: ;] or
(B) he is able to pay for such service but only in installments[struck: ,][inserted: ; and]
such service may not be terminated.
(3) [inserted: Recovery of certain costs.—] [inserted: Costs incurred by an electric utility to comply with paragraph (1)(C) may not be retroactively assessed on electric consumers for whom electric service would have been terminated if not for the requirements of that paragraph, but a State regulatory authority, after notice and an opportunity for comment, may establish an alternative mechanism that permits an electric utility to recover those costs if the State regulatory authority determines that the costs—]
(A) [inserted: are substantial;]
(B) [inserted: were prudently incurred; and]
(C) [inserted: cannot reasonably be recovered through—]
(i) [inserted: regulated rates or market prices for the electric energy or any services sold by the electric utility; or]
(ii) [inserted: any supplemental funding received by the State or electric utility for the purpose of responding to the applicable lapse in appropriations.]
Such procedures shall take into account the need to include reasonable provisions for elderly and handicapped consumers.
(h) Advertising
(1) For purposes of this section and section 2623(b)(5) of this title—
Rest of § 2625 unchanged ·