Title 16 · ConservationParks and public lands
Changes to 16 U.S.C. § 3839aa–2
S. 3498 · EQIP Improvement Act of 2025 · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
16 U.S.C. § 3839aa–2 Establishment and administration
3 changes the bill asks for here, 2 carried out
- Carried out:
in subsection (d), by striking paragraph (2) and inserting the following:
(2) Limitation on payments.— A payment to a producer for performing a practice may not exceed, as determined by the Secretary— (A) except as provided in subparagraphs (B) through (D), 75 percent of the costs associated with planning, design, materials, equipment, installation, …
- Not carried out:
in subsection (f), by striking the subsection designation and heading and all that follows through For each in paragraph (2)(B) and inserting the following:
(f) Allocation of funding for wildlife habitat.— For each.
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: striking the subsection designation and heading and all that follows through QTEXT in paragraph (X) (X) and inserting the following: QCONTENT. - Carried out:
Section 1240B of the Food Security Act of 1985 (16 U.S.C. 3839aa–2) is amended by adding at the end the following:
(k) Annual report to Congress.— Not less frequently than once each year, the Secretary shall submit to Congress a report describing— (1) the amount obligated under the program with respect to each category of practice, with information categorized by fiscal year and State; and …
§ 3839aa–2(d)Payments(1)–(3)
Start of § 3839aa–2 to (c) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (d) | (d) Payments | (d) Payments | ||
| (1) | (1) Availability of payments | (1) Availability of payments | ||
| Payments are provided to a producer to implement one or more practices under the program. | Payments are provided to a producer to implement one or more practices under the program. | |||
| (2) | (2) Limitation on | (2) Limitation on [inserted: payments.—] | ||
| A payment to a producer for performing a practice may not exceed, as determined by the Secretary— | A payment to a producer for performing a practice may not exceed, as determined by the Secretary— | |||
| (2)(A) | (A) | (A) | ||
| 75 percent of the costs associated with planning, design, materials, equipment, installation, labor, management, maintenance, or training; | [inserted: except as provided in subparagraphs (B) through (D), ]75 percent of the costs associated with planning, design, materials, equipment, installation, labor, management, maintenance, or training; | |||
| (2)(B) | (B) | (B) | ||
| [inserted: 40 percent of the costs associated with planning, design, materials, equipment, installation, labor, management, maintenance, or training for—] | ||||
| (2)(B)(i) | (i) [inserted: ] | |||
| [inserted: an access road;] | ||||
| (2)(B)(ii) | (ii) [inserted: ] | |||
| [inserted: an animal mortality facility;] | ||||
| (2)(B)(iii) | (iii) [inserted: ] | |||
| [inserted: an aquaculture pond;] | ||||
| (2)(B)(iv) | (iv) [inserted: ] | |||
| [inserted: clearing and snagging;] | ||||
| (2)(B)(v) | (v) [inserted: ] | |||
| [inserted: a dam;] | ||||
| (2)(B)(vi) | (vi) [inserted: ] | |||
| [inserted: a dam using a diversion;] | ||||
| (2)(B)(vii) | (vii) [inserted: ] | |||
| [inserted: a dike;] | ||||
| (2)(B)(viii) | (viii) [inserted: ] | |||
| [inserted: a diversion;] | ||||
| (2)(B)(ix) | (ix) [inserted: ] | |||
| [inserted: a fish raceway or tank;] | ||||
| (2)(B)(x) | (x) [inserted: ] | |||
| [inserted: an irrigation pipeline;] | ||||
| (2)(B)(xi) | (xi) [inserted: ] | |||
| [inserted: an irrigation reservoir;] | ||||
| (2)(B)(xii) | (xii) [inserted: ] | |||
| [inserted: land clearing;] | ||||
| (2)(B)(xiii) | (xiii) [inserted: ] | |||
| [inserted: land smoothing;] | ||||
| (2)(B)(xiv) | (xiv) [inserted: ] | |||
| [inserted: a livestock pipeline;] | ||||
| (2)(B)(xv) | (xv) [inserted: ] | |||
| [inserted: obstruction removal;] | ||||
| (2)(B)(xvi) | (xvi) [inserted: ] | |||
| [inserted: a pond;] | ||||
| (2)(B)(xvii) | (xvii) [inserted: ] | |||
| [inserted: a pumping plant;] | ||||
| (2)(B)(xviii) | (xviii) [inserted: ] | |||
| [inserted: spoil spreading;] | ||||
| (2)(B)(xix) | (xix) [inserted: ] | |||
| [inserted: a surface drain using a field ditch;] | ||||
| (2)(B)(xx) | (xx) [inserted: ] | |||
| [inserted: a main or lateral surface drain;] | ||||
| (2)(B)(xxi) | (xxi) [inserted: ] | |||
| [inserted: a vertical drain;] | ||||
| (2)(B)(xxii) | (xxii) [inserted: ] | |||
| [inserted: a waste facility closure;] | ||||
| (2)(B)(xxiii) | (xxiii) [inserted: ] | |||
| [inserted: a waste storage facility;] | ||||
| (2)(B)(xxiv) | (xxiv) [inserted: ] | |||
| [inserted: waste transfer; or] | ||||
| (2)(B)(xxv) | (xxv) [inserted: ] | |||
| [inserted: a waste treatment lagoon;] | ||||
| (2)(B) | ||||
| (2)(C) | (C) | (C) | ||
| [inserted: 100 percent of income foregone by the producer; or] | ||||
| (2)(D) | (D) [inserted: ] | |||
| [inserted: in the case of a practice that includes 1 or more elements described in subparagraphs (A) through (C)—] | ||||
| (2)(D)(i) | (i) [inserted: ] | |||
| [inserted: 75 percent of the costs incurred with respect to any elements described in subparagraph (A);] | ||||
| (2)(D)(ii) | (ii) [inserted: ] | |||
| [inserted: 40 percent of the costs incurred with respect to any elements described in subparagraph (B); and] | ||||
| (2)(D)(iii) | (iii) [inserted: ] | |||
| [inserted: 100 percent of the income forgone with respect to any elements described in subparagraph (C).] | ||||
| (2)(C) | ||||
| (2)(C)(i) | (i) | |||
| (2)(C)(ii) | (ii) | |||
| (3) | (3) Special rule involving payments for foregone income | (3) Special rule involving payments for foregone income | ||
| In determining the amount and rate of payments under paragraph (2)(B), the Secretary may accord great significance to a practice that, as determined by the Secretary, promotes— | In determining the amount and rate of payments under paragraph (2)(B), the Secretary may accord great significance to a practice that, as determined by the Secretary, promotes— | |||
| (3)(A) | (A) | (A) | ||
| soil health; | soil health; | |||
§ 3839aa–2(j)–(k)
(d)(3)(B)–(j)(3)(C) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (j)(3)(C)(i) | (i) | (i) | ||
| in the case of annual payments under paragraph (2)(A)(ii)(I), make those payments as soon as practicable after October 1 of each fiscal year for which increased levels of conservation are maintained during the term of the contract; and | in the case of annual payments under paragraph (2)(A)(ii)(I), make those payments as soon as practicable after October 1 of each fiscal year for which increased levels of conservation are maintained during the term of the contract; and | |||
| (j)(3)(C)(ii) | (ii) | (ii) | ||
| in the case of practice payments under paragraph (2)(A)(ii)(II), make those payments as soon as practicable on the implementation of an incentive practice. | in the case of practice payments under paragraph (2)(A)(ii)(II), make those payments as soon as practicable on the implementation of an incentive practice. | |||
| (k) | (k) [inserted: Annual report to Congress.—] | |||
| [inserted: Not less frequently than once each year, the Secretary shall submit to Congress a report describing—] | ||||
| (k)(1) | (1) [inserted: ] | |||
| [inserted: the amount obligated under the program with respect to each category of practice, with information categorized by fiscal year and State; and] | ||||
| (k)(2) | (2) [inserted: ] | |||
| [inserted: the amount obligated under the program in each State, with information categorized by fiscal year and the size of the operation of each producer.] | ||||