Title 16 · ConservationParks and public lands
Changes to 16 U.S.C. § 2621
S. 3682 · Power for the People Act of 2026 · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
16 U.S.C. § 2621 Consideration and determination respecting certain ratemaking standards
+21 −0Shown
1 change the bill asks for here, 1 carried out
- Carried out:
Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following:
(22) Data centers.— (A) Definitions.— In this paragraph, the terms “data center”, “data center owner or operator”, and “load interconnection request” have the meanings given those terms in section 3 of the Power for the People Act of 2026. (B) Standard.— Each State in which at …
§ 2621(d)Establishment(21)–(22)
Start of § 2621 to (d)(21)(B) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (21)(C) | (C) | (C) | ||
| accelerate third-party investment in electric vehicle charging for light-, medium-, and heavy-duty vehicles; and | accelerate third-party investment in electric vehicle charging for light-, medium-, and heavy-duty vehicles; and | |||
| (21)(D) | (D) | (D) | ||
| appropriately recover the marginal costs of delivering electricity to electric vehicles and electric vehicle charging infrastructure. | appropriately recover the marginal costs of delivering electricity to electric vehicles and electric vehicle charging infrastructure. | |||
| (22) | (22) [inserted: Data centers.—] | |||
| (22)(A) | (A) [inserted: Definitions.—] | |||
| [inserted: In this paragraph, the terms “data center”, “data center owner or operator”, and “load interconnection request” have the meanings given those terms in section 3 of the Power for the People Act of 2026.] | ||||
| (22)(B) | (B) [inserted: Standard.—] | |||
| [inserted: Each State in which at least 1 data center is located or has been proposed via load interconnection request, legal filing, or public announcement shall consider—] | ||||
| (22)(B)(i) | (i) [inserted: ] | |||
| [inserted: establishing a rate class specific to data centers to ensure that data center owners and operators are covering the full cost of the generation, transmission, and distribution upgrades necessary to serve data centers; and] | ||||
| (22)(B)(ii) | (ii) [inserted: ] | |||
| [inserted: including as requirements for the data center rate class, in addition to any other potential requirements the State chooses to examine—] | ||||
| (22)(B)(ii)(I) | (I) [inserted: ] | |||
| [inserted: minimum demand charges for data center owners and operators based on requested peak electricity demand if the monthly usage of a data center is less than its requested demand to ensure that ratepayers are not paying increased costs for generation and transmission built to serve data centers;] | ||||
| (22)(B)(ii)(II) | (II) [inserted: ] | |||
| [inserted: an extension of minimum utility contract lengths for data center customers to ensure that data center load does not leave utilities and ratepayers with stranded costs;] | ||||
| (22)(B)(ii)(III) | (III) [inserted: ] | |||
| [inserted: an increase in up-front interconnection study costs, deposit amounts, or collateral requirements for data center projects to ensure that the interconnection queue is not slowed down by projects that are unlikely to come to fruition;] | ||||
| (22)(B)(ii)(IV) | (IV) [inserted: ] | |||
| [inserted: permissible “load ramp” periods for data centers that allow data center customers to start service with a lower-than-requested capacity and gradually increase their power demand over a period of multiple years to reach their full requested capacity, subject to the condition that flexible load interconnection pursuant to this subclause does not undermine grid reliability;] | ||||
| (22)(B)(ii)(V) | (V) [inserted: ] | |||
| [inserted: a “clean transition tariff” that allows data center customers to financially support novel zero-emissions energy technologies to meet their electricity demand in cooperation with intermediaries, such as a utility company; and] | ||||
| (22)(B)(ii)(VI) | (VI) [inserted: ] | |||
| [inserted: the use of contribution in aid of construction (commonly referred to as “CIAC”) as a tool to have the data center customer pay upfront for the utility investment determined to be the responsibility of that data center.] | ||||