Title 23 · HighwaysTransportation

Changes to 23 U.S.C. § 129

S. 3694 · Maximizing Transportation Efficiency Act ·

In committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

23 U.S.C. § 129 Toll roads, bridges, tunnels, and ferries

+12 −3Shown
More for 23 U.S.C. § 129
Read § 129
4 changes the bill asks for here, 4 carried out
  1. Carried out:

    in clause (i), by striking with a population of more than 1,000,000; and

  2. Carried out:

    in clause (ii), by striking with a population of more than 1,000,000;

  3. Carried out:

    in paragraph (5)(D), by striking A grant and inserting Except as provided in paragraph (8), a grant; and

  4. Carried out:

    by adding at the end the following:(8) Small project set-aside.— (A) In general.— Of the amounts made available for the program for each fiscal year, the Secretary shall use $20,000,000 to make grants to eligible entities for projects under the program with an estimated cost that is— (i) not less than $500,000; …

§ 129(d)(1)Definitions.—(A)–(C)

Start of § 129 to (d)(1) unchanged ·

(A) Eligible entity.— The term “eligible entity” means any of the following:

(i) A State, for the purpose of carrying out a project in an urbanized area[struck: with a population of more than 1,000,000].

(ii) A metropolitan planning organization, city, or municipality, for the purpose of carrying out a project in an urbanized area[struck: with a population of more than 1,000,000].

(B) Integrated congestion management system.— The term “integrated congestion management system” means a system for the integration of management and operations of a regional transportation system that includes, at a minimum, traffic incident management, work zone management, traffic signal timing, managed lanes, real-time traveler information, and active traffic management, in order to maximize the capacity of all facilities and modes across the applicable region.

(C) Program.— The term “program” means the congestion relief program established under paragraph (2).

§ 129(d)Congestion Relief Program.—(5)–(6)

(d)(2)–(5) unchanged ·

(C) Federal share.— The Federal share of the cost of a project carried out with a grant under the program shall not exceed 80 percent of the total project cost.

(D) Minimum award.— [struck: A][inserted: Except] [inserted: as provided in paragraph (8), a ]grant provided under the program shall be not less than $10,000,000.

(6) Use of tolling.—

(A) In general.— Notwithstanding subsection (a)(1) and section 301 and subject to subparagraphs (B) and (C), the Secretary shall allow the use of tolls on the Interstate System as part of a project carried out with a grant under the program.

§ 129(d)Congestion Relief Program.—(7)–(8)

(d)(6)(B)–(7) unchanged ·

(A) shall include, if appropriate, an analysis of the potential effects of the project on low-income drivers; and

(B) may include mitigation measures to deal with any potential adverse financial effects on low-income drivers.

(8) [inserted: Small project set-aside.—]

(A) [inserted: In general.—] [inserted: Of the amounts made available for the program for each fiscal year, the Secretary shall use $20,000,000 to make grants to eligible entities for projects under the program with an estimated cost that is—]

(i) [inserted: not less than $500,000; and]

(ii) [inserted: not more than $10,000,000.]

(B) [inserted: Unutilized funds.—] [inserted: For any fiscal year, if the Secretary determines that the amount set aside under subparagraph (A) will not be fully utilized for grants described in that subparagraph, the Secretary shall use the unutilized amounts to provide grants for other projects under the program.]

Step through the changes