Changes to 16 U.S.C. § 824q

S. 3976 · Connect the Grid Act of 2026 ·

In committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

16 U.S.C. § 824q Native load service obligation

+11 −13Shown
More for 16 U.S.C. § 824q
Read § 824q
2 changes the bill asks for here, 2 carried out
  1. Carried out:

    by striking subsection (h); and

  2. Carried out:

    by redesignating subsections (i) through (k) as subsections (h) through (j), respectively.

§ 824q(f)–(j)

Start of § 824q to (e) unchanged ·

(f) Contracts Nothing in this section shall provide a basis for abrogating any contract or service agreement for firm transmission service or rights in effect as of August 8, 2005. If an ISO in the Western Interconnection had allocated financial transmission rights prior to August 8, 2005, but had not done so with respect to one or more load-serving entities’ firm transmission rights held under contracts to which the preceding sentence applies (or held by reason of ownership or future ownership of transmission facilities), such load-serving entities may not be required, without their consent, to convert such firm transmission rights to tradable or financial rights, except where the load-serving entity has voluntarily joined the ISO as a participating transmission owner (or its successor) in accordance with the ISO tariff.

(g) Water pumping facilities The Commission shall ensure that any entity described in section 824(f) of this title that owns transmission facilities used predominately to support its own water pumping facilities shall have, with respect to the facilities, protections for transmission service comparable to those provided to load-serving entities pursuant to this section.

[struck: (h)] [struck: ERCOT] [struck: This section shall not apply within the area referred to in section 824k(k)(2)(A) of this title.]

[struck: (i)] [inserted: (h)] Jurisdiction This section does not authorize the Commission to take any action not otherwise within the jurisdiction of the Commission.

[struck: (j)] [inserted: (i)] TVA area

(1) Subject to paragraphs (2) and (3), for purposes of subsection (b)(1)(B), a load-serving entity that is located within the service area of the Tennessee Valley Authority and that has a firm wholesale power supply contract with the Tennessee Valley Authority shall be considered to hold firm transmission rights for the transmission of the power provided.

(2) Nothing in this subsection affects the requirements of section 824k(j) of this title.

(3) The Commission shall not issue an order on the basis of this subsection that is contrary to the purposes of section 824k(j) of this title.

[struck: (k)] [inserted: (j)] Effect of exercising rights An entity that to the extent required to meet its service obligations exercises rights described in subsection (b) shall not be considered by such action as engaging in undue discrimination or preference under this chapter.