Changes to the Code
S. 4248 · Enhancing Long-Term, Efficient, and Viable Alternatives to Empower Flood-Prone Communities Act of 2026 · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
33 U.S.C. § 2213 Flood control and other purposes
6 changes the bill asks for here, 6 carried out
- Carried out:
in paragraph (1), in the first sentence, by striking
The non-Federal share
and insertingExcept as provided in paragraph (2), the non-Federal share
; - Carried out:
in the paragraph heading, by striking
35 percent
and insertingthe non-Federal share
; - Carried out:
by striking
35 percent
and insertingthe non-Federal share
; and - Carried out:
by striking
65 percent
and insertingthe Federal share
; - Carried out:
by redesignating paragraph (2) as paragraph (3); and
- Carried out:
by inserting after paragraph (1) the following:
(2) Cost sharing for certain measures using nonstructural features.— The Federal share of the cost of a flood risk management or hurricane and storm damage risk reduction measure using a nonstructural feature shall be— (A) 90 percent, if the measure benefits an economically …
§ 2213(a)–(c)
Start of § 2213 to (a)(3) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (a)(4) | (4) Deferred payment of amount exceeding 30 percent | (4) Deferred payment of amount exceeding 30 percent | ||
| If the total amount of the contribution required under paragraph (1) of this subsection exceeds 30 percent of the cost of the project assigned to flood control, the non-Federal interests may pay the amount of the excess to the Secretary over a 15-year period (or such shorter period as may be agreed to by the Secretary and the non-Federal interests) beginning on the date construction of the project or separable element is completed, at an interest rate determined pursuant to section 2216 of this title. The preceding sentence does not modify the requirement of paragraph (1)(A) of this subsection. | If the total amount of the contribution required under paragraph (1) of this subsection exceeds 30 percent of the cost of the project assigned to flood control, the non-Federal interests may pay the amount of the excess to the Secretary over a 15-year period (or such shorter period as may be agreed to by the Secretary and the non-Federal interests) beginning on the date construction of the project or separable element is completed, at an interest rate determined pursuant to section 2216 of this title. The preceding sentence does not modify the requirement of paragraph (1)(A) of this subsection. | |||
| (b) | (b) Projects using nonstructural, natural, or nature-based features | (b) Projects using nonstructural, natural, or nature-based features | ||
| (b)(1) | (1) In general | (1) In general | ||
| [inserted: Except] [inserted: as provided in paragraph (2), the ]non-Federal share of the cost of a flood risk management or hurricane and storm damage risk reduction measure using a nonstructural feature, or a natural feature or nature-based feature (as those terms are defined in section 2289a(a) of this title), shall be 35 percent of the cost of such measures. The non-Federal interests for any such measures shall be required to provide all lands, easements, rights-of-way, dredged material disposal areas, and relocations necessary for the project, but shall not be required to contribute any amount in cash during construction for a nonstructural feature if the costs of land, easements, rights-of-way, dredged material disposal areas, and relocations for such feature are estimated to exceed 35 percent. | ||||
| (b)(2) | (2) [inserted: Cost sharing for certain measures using nonstructural features.—] | |||
| [inserted: The Federal share of the cost of a flood risk management or hurricane and storm damage risk reduction measure using a nonstructural feature shall be—] | ||||
| (b)(2)(A) | (A) [inserted: ] | |||
| [inserted: 90 percent, if the measure benefits an economically disadvantaged community (as defined pursuant to section 160 of the Water Resources Development Act of 2020 (33 U.S.C. 2201 note; Public Law 116–260));] | ||||
| (b)(2)(B) | (B) [inserted: ] | |||
| [inserted: 90 percent, if the measure is for a repetitive loss structure (as defined in section 1370 of the National Flood Insurance Act of 1968 (42 U.S.C. 4121));] | ||||
| (b)(2)(C) | (C) [inserted: ] | |||
| [inserted: 100 percent, if the measure is for a severe repetitive loss structure (as defined in section 1366(h) of the National Flood Insurance Act of 1968 (42 U.S.C. 4104c(h))); and] | ||||
| (b)(2)(D) | (D) [inserted: ] | |||
| [inserted: 75 percent, in the case of any measure not described in subparagraphs (A) through (C).] | ||||
| (b)(3) | [inserted: (3)] Non-Federal contribution in excess of [inserted: the] [inserted: non-Federal share] | |||
| At any time during construction of a project, if the Secretary determines that the costs of land, easements, rights-of-way, dredged material disposal areas, and relocations for the project, in combination with other costs contributed by the non-Federal interests, will exceed | At any time during construction of a project, if the Secretary determines that the costs of land, easements, rights-of-way, dredged material disposal areas, and relocations for the project, in combination with other costs contributed by the non-Federal interests, will exceed [inserted: the] [inserted: non-Federal share], any additional costs for the project (not to exceed [inserted: the] [inserted: Federal] [inserted: share ]of the total costs of the project) shall be a Federal responsibility and shall be contributed during construction as part of the Federal share. | |||
| (c) | (c) Other purposes | (c) Other purposes | ||
| The non-Federal share of the cost assigned to other project purposes shall be as follows: | The non-Federal share of the cost assigned to other project purposes shall be as follows: | |||
| (c)(1) | (1) | (1) | ||
| hydroelectric power: 100 percent, except that the marketing of such power and the recovery of costs of constructing, operating, maintaining, and rehabilitating such projects shall be in accordance with existing law: Provided, That after November 17, 1986, the Secretary shall not submit to Congress any proposal for the authorization of any water resources project that has a hydroelectric power component unless such proposal contains the comments of the appropriate Power Marketing Administrator designated pursuant to section 7152 of title 42 concerning the appropriate Power Marketing Administration’s ability to market the hydroelectric power expected to be generated and not required in the operation of the project under the applicable Federal power marketing law, so that, 100 percent of operation, maintenance and replacement costs, 100 percent of the capital investment allocated to the purpose of hydroelectric power (with interest at rates established pursuant to or prescribed by applicable law), and any other costs assigned in accordance with law for return from power revenues can be returned within the period set for the return of such costs by or pursuant to such applicable Federal power marketing law; | hydroelectric power: 100 percent, except that the marketing of such power and the recovery of costs of constructing, operating, maintaining, and rehabilitating such projects shall be in accordance with existing law: Provided, That after November 17, 1986, the Secretary shall not submit to Congress any proposal for the authorization of any water resources project that has a hydroelectric power component unless such proposal contains the comments of the appropriate Power Marketing Administrator designated pursuant to section 7152 of title 42 concerning the appropriate Power Marketing Administration’s ability to market the hydroelectric power expected to be generated and not required in the operation of the project under the applicable Federal power marketing law, so that, 100 percent of operation, maintenance and replacement costs, 100 percent of the capital investment allocated to the purpose of hydroelectric power (with interest at rates established pursuant to or prescribed by applicable law), and any other costs assigned in accordance with law for return from power revenues can be returned within the period set for the return of such costs by or pursuant to such applicable Federal power marketing law; | |||
Rest of § 2213 unchanged