42 U.S.C. § 8253 Energy and water management requirements
3 changes the bill asks for here, 3 carried out
- Carried out:
by redesignating subparagraphs (E) through (H) as subparagraphs (F) through (I), respectively; and
- Carried out:
by inserting after subparagraph (D) the following:
(E) Mechanical insulation property.— The term “mechanical insulation property” means insulation material, facing, or accessory product that— (i) is placed into service— (I) in connection with a mechanical system; and (II) in a manner that meets or exceeds the minimum …
- Carried out:
in paragraph (3)(A), by inserting
, including identification of energy- and water-saving measures (including the installation of mechanical insulation property, if applicable),
aftera comprehensive energy and water evaluation
.
§ 8253(f)Use of energy and water efficiency measures in Federal buildings(1)–(2)
Start of § 8253 to (f)(1)(C)(ii)(II) unchanged ·
(iii) Exclusions The term “facility” does not include any land or site for which the cost of utilities is not paid by the Federal Government.
(D) Life cycle cost-effective The term “life cycle cost-effective”, with respect to a measure, means a measure, the estimated savings of which exceed the estimated costs over the lifespan of the measure, as determined in accordance with section 8254 of this title.
(E) [inserted: Mechanical insulation property.—] [inserted: The term “mechanical insulation property” means insulation material, facing, or accessory product that—]
(i) [inserted: is placed into service—]
(I) [inserted: in connection with a mechanical system; and]
(II) [inserted: in a manner that meets or exceeds the minimum requirements of Standard 90.1 of the American Society of Heating, Refrigerating and Air-Conditioning Engineers (as in effect on the date of enactment of the Federal Mechanical Insulation Act of 2026); and]
(ii) [inserted: results in a reduction in energy loss from the mechanical system.]
[struck: (E)] [inserted: (F)] Ongoing commissioning The term “ongoing commissioning” means an ongoing process of commissioning using monitored data, the primary goal of which is to ensure continuous optimum performance of a facility, in accordance with design or operating needs, over the useful life of the facility, while meeting facility occupancy requirements.
[struck: (F)] [inserted: (G)] Payback period
(i) In general Subject to clause (ii), the term “payback period”, with respect to a measure, means a value equal to the quotient obtained by dividing—
(I) the estimated initial implementation cost of the measure (other than financing costs); by
(II) the annual cost savings resulting from the measure, including—
(aa) net savings in estimated energy and water costs; and
(bb) operations, maintenance, repair, replacement, and other direct costs.
(ii) Modifications and exceptions The Secretary, in guidelines issued pursuant to paragraph (6), may make such modifications and provide such exceptions to the calculation of the payback period of a measure as the Secretary determines to be appropriate to achieve the purposes of this chapter.
[struck: (G)] [inserted: (H)] Recommissioning The term “recommissioning” means a process—
(i) of commissioning a facility or system beyond the project development and warranty phases of the facility or system; and
(ii) the primary goal of which is to ensure optimum performance of a facility, in accordance with design or current operating needs, over the useful life of the facility, while meeting building occupancy requirements.
[struck: (H)] [inserted: (I)] Retrocommissioning The term “retrocommissioning” means a process of commissioning a facility or system that was not commissioned at the time of construction of the facility or system.
(2) Facility energy managers
(A) In general Each Federal agency shall designate an energy manager responsible for implementing this subsection and reducing energy and water use at each facility that meets criteria under subparagraph (B).
§ 8253(f)Use of energy and water efficiency measures in Federal buildings(2)–(3)
(f)(2)(B)–(C) unchanged ·
(ii) the applicability of the certification of the facility in accordance with the International Organization for Standardization standard numbered 50001 and entitled “Energy Management Systems”.
(3) Energy and water evaluations and commissioning
(A) Evaluations Except as provided in subparagraph (B), not later than the date that is 180 days after December 27, 2020, and annually thereafter, each energy manager shall complete, for the preceding calendar year, a comprehensive energy and water evaluation[inserted: ,] [inserted: including identification of energy- ]and [inserted: water-saving measures (including the installation of mechanical insulation property, if applicable), and ]recommissioning or retrocommissioning for approximately 25 percent of the facilities of the applicable agency that meet the criteria under paragraph (2)(B) in a manner that ensures that an evaluation of each facility is completed not less frequently than once every 4 years.
(B) Exceptions An evaluation and recommissioning or retrocommissioning shall not be required under subparagraph (A) with respect to a facility that, as of the date on which the evaluation and recommissioning or retrocommissioning would occur—
(i) has had a comprehensive energy and water evaluation during the preceding 8-year period;
Rest of § 8253 unchanged ·