16 U.S.C. § 824a Interconnection and coordination of facilities; emergencies; transmission to foreign countries
13 changes the bill asks for here, 7 carried out
- Carried out:
by striking
or other causes,
; and - Carried out:
by striking
with or without notice, hearing, or report,
; - Carried out:
in paragraph (2), by adding at the end the following:
Before issuing such an order, the Commission, to the maximum extent practicable, shall consider alternatives to meet the emergency, including alternatives that both meet the emergency and minimize adverse environmental impacts.
; - Carried out:
in subparagraph (A), in the first sentence, by striking
that may result in a conflict with a requirement of any Federal, State, or local environmental law or regulation
; - Carried out:
by inserting
advance of
beforerenewing or reissuing
; - Not carried out:
by striking shall consult with the and inserting the following:
“shall—(i) hold a hearing open to the public on the proposed order; (ii) determine— (I) whether and the extent to which the order will raise rates for ratepayers; and (II) whether the order may result in a conflict with a requirement of any Federal, State, or local environmental …
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: striking QTEXT and inserting the following: “ shall — QCONTENT; and - Not carried out:
in clause (iii)(II) (as so designated), in the first sentence, by striking such law or regulation, and shall and inserting the following:
“each environmental law or regulation with respect to which the order may result in a conflict described in clause (ii)(II).(C) The Commission shall;
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: striking QTEXT and inserting the following: “ each environmental law or regulation with respect to which the order may result in a conflict described in clause (X) (X). QCONTENT; - Not carried out:
by striking
such Federal agency determines
and inserting1 or more Federal or relevant non-Federal agencies consulted under subparagraph (B)(iii) determine
; andThe bill points to subparagraph (C) of § 824a(c)(4), which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.
Technical detail
target not found: no subparagraph (C) in /us/usc/t16/s824a/c/4 - Not carried out:
by inserting
rate or
afteradverse
; andThe bill points to subparagraph (C) of § 824a(c)(4), which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.
Technical detail
target not found: no subparagraph (C) in /us/usc/t16/s824a/c/4 - Not carried out:
by striking
The conditions
and insertingThe cost estimates and conditions
; andThe bill points to subparagraph (C) of § 824a(c)(4), which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.
Technical detail
target not found: no subparagraph (C) in /us/usc/t16/s824a/c/4 - Not carried out:
by striking
such Federal agency
and insertingany 1 or more Federal or relevant non-Federal agencies
; andThe bill points to subparagraph (C) of § 824a(c)(4), which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.
Technical detail
target not found: no subparagraph (C) in /us/usc/t16/s824a/c/4 - Carried out:
by adding at the end the following:
(D) An order issued under this subsection shall be considered to be a renewed or reissued order subject to the requirements of this paragraph and all other requirements relating to a renewed or reissued order if the order relates to the same facility and a substantially similar …
- Carried out:
by adding at the end the following:
(6) (A) Except as provided in subparagraph (B), the Commission may not issue an order under this subsection that would— (i) prevent or delay the retirement or other permanent closure of a facility for the generation of electric energy; or (ii) require the generation of electric …
§ 824a(a)–(e)
§ 824a. Interconnection and coordination of facilities; emergencies; transmission to foreign countries
(a) Regional districts; establishment; notice to State commissions For the purpose of assuring an abundant supply of electric energy throughout the United States with the greatest possible economy and with regard to the proper utilization and conservation of natural resources, the Commission is empowered and directed to divide the country into regional districts for the voluntary interconnection and coordination of facilities for the generation, transmission, and sale of electric energy, and it may at any time thereafter, upon its own motion or upon application, make such modifications thereof as in its judgment will promote the public interest. Each such district shall embrace an area which, in the judgment of the Commission, can economically be served by such interconnection and coordinated electric facilities. It shall be the duty of the Commission to promote and encourage such interconnection and coordination within each such district and between such districts. Before establishing any such district and fixing or modifying the boundaries thereof the Commission shall give notice to the State commission of each State situated wholly or in part within such district, and shall afford each such State commission reasonable opportunity to present its views and recommendations, and shall receive and consider such views and recommendations.
(b) Sale or exchange of energy; establishing physical connections Whenever the Commission, upon application of any State commission or of any person engaged in the transmission or sale of electric energy, and after notice to each State commission and public utility affected and after opportunity for hearing, finds such action necessary or appropriate in the public interest it may by order direct a public utility (if the Commission finds that no undue burden will be placed upon such public utility thereby) to establish physical connection of its transmission facilities with the facilities of one or more other persons engaged in the transmission or sale of electric energy, to sell energy to or exchange energy with such persons: Provided, That the Commission shall have no authority to compel the enlargement of generating facilities for such purposes, nor to compel such public utility to sell or exchange energy when to do so would impair its ability to render adequate service to its customers. The Commission may prescribe the terms and conditions of the arrangement to be made between the persons affected by any such order, including the apportionment of cost between them and the compensation or reimbursement reasonably due to any of them.
(c) Temporary connection and exchange of facilities during emergency
(1) During the continuance of any war in which the United States is engaged, or whenever the Commission determines that an emergency exists by reason of a sudden increase in the demand for electric energy, or a shortage of electric energy or of facilities for the generation or transmission of electric energy, or of fuel or water for generating facilities, [struck: or other causes, ]the Commission shall have authority, either upon its own motion or upon complaint, [struck: with or without notice, hearing, or report, ]to require by order such temporary connections of facilities and such generation, delivery, interchange, or transmission of electric energy as in its judgment will best meet the emergency and serve the public interest. If the parties affected by such order fail to agree upon the terms of any arrangement between them in carrying out such order, the Commission, after hearing held either before or after such order takes effect, may prescribe by supplemental order such terms as it finds to be just and reasonable, including the compensation or reimbursement which should be paid to or by any such party.
(2) With respect to an order issued under this subsection that may result in a conflict with a requirement of any Federal, State, or local environmental law or regulation, the Commission shall ensure that such order requires generation, delivery, interchange, or transmission of electric energy only during hours necessary to meet the emergency and serve the public interest, and, to the maximum extent practicable, is consistent with any applicable Federal, State, or local environmental law or regulation and minimizes any adverse environmental impacts.[inserted: Before issuing such an order, the Commission, to the maximum extent practicable, shall consider alternatives to meet the emergency, including alternatives that both meet the emergency and minimize adverse environmental impacts.]
(3) To the extent any omission or action taken by a party, that is necessary to comply with an order issued under this subsection, including any omission or action taken to voluntarily comply with such order, results in noncompliance with, or causes such party to not comply with, any Federal, State, or local environmental law or regulation, such omission or action shall not be considered a violation of such environmental law or regulation, or subject such party to any requirement, civil or criminal liability, or a citizen suit under such environmental law or regulation.
(4)
(A) An order issued under this subsection [struck: that may result in a conflict with a requirement of any Federal, State, or local environmental law or regulation ]shall expire not later than 90 days after it is issued. The Commission may renew or reissue such order pursuant to paragraphs (1) and (2) for subsequent periods, not to exceed 90 days for each period, as the Commission determines necessary to meet the emergency and serve the public interest.
(B) In [inserted: advance of ]renewing or reissuing an order under subparagraph (A), the Commission shall consult with the primary Federal agency with expertise in the environmental interest protected by such law or regulation, and shall include in any such renewed or reissued order such conditions as such Federal agency determines necessary to minimize any adverse environmental impacts to the extent practicable. The conditions, if any, submitted by such Federal agency shall be made available to the public. The Commission may exclude such a condition from the renewed or reissued order if it determines that such condition would prevent the order from adequately addressing the emergency necessitating such order and provides in the order, or otherwise makes publicly available, an explanation of such determination.
(D) [inserted: An order issued under this subsection shall be considered to be a renewed or reissued order subject to the requirements of this paragraph and all other requirements relating to a renewed or reissued order if the order relates to the same facility and a substantially similar emergency as a previous order issued under this subsection.]
(5) If an order issued under this subsection is subsequently stayed, modified, or set aside by a court pursuant to section 825l of this title or any other provision of law, any omission or action previously taken by a party that was necessary to comply with the order while the order was in effect, including any omission or action taken to voluntarily comply with the order, shall remain subject to paragraph (3).
(6)
(A) [inserted: Except as provided in subparagraph (B), the Commission may not issue an order under this subsection that would—]
(i) [inserted: prevent or delay the retirement or other permanent closure of a facility for the generation of electric energy; or]
(ii) [inserted: require the generation of electric energy at a facility that has retired or otherwise permanently closed.]
(B) [inserted: Subparagraph (A) shall not apply to a particular facility if—]
(i) [inserted: an emergency exists that cannot be met in any manner other than delay of the retirement or other permanent closure of the facility; and]
(ii) [inserted: the applicable Transmission Organization requests in writing to delay the retirement or other permanent closure of the facility.]
(7)
(A) [inserted: Before issuing an order under paragraph (1), the Commission shall—]
(i) [inserted: create a public online docket for matters pertaining to the order; and]
(ii) [inserted: publish on a publicly available website—]
(I) [inserted: notice of the proposed order, including a link to the docket created under clause (i); and]
(II) [inserted: any request submitted pursuant to paragraph (6)(B)(ii).]
(B) [inserted: An order issued under paragraph (1) (including any renewed or reissued order under paragraph (4)) shall be—]
(i) [inserted: published on the publicly available docket created under subparagraph (A)(ii); and]
(ii) [inserted: accompanied by a report that includes—]
(I) [inserted: an analysis of the causes of the emergency;]
(II) [inserted: an analysis of the alternatives considered to meet the emergency, including alternatives that both meet the emergency and minimize adverse environmental impacts; and]
(III) [inserted: estimates of the additional electrical system costs that are expected to be incurred by any electric utility and any customers of an electric utility as a result of the order, including the costs of additional fuel, maintenance, capital, or labor.]
(C) [inserted: The Commission shall comply with subclauses (II) and (III) of subparagraph (B)(ii) to the maximum extent practicable, in light of the circumstances, in the case of an initial order issued under paragraph (1) to address a particular emergency, but shall fully comply with those subclauses with respect to any renewed or reissued order issued to address that emergency.]
(D) [inserted: Not later than 60 days after the date on which an order is issued under paragraph (1), each electric utility that is, or expects to be, impacted by the order (including each electric utility identified by the Commission under subparagraph (B)(ii)(III)) shall provide to customers of the electric utility written notice that includes—]
(i) [inserted: an identification of the order, including a link to, or instructions for accessing, the order as published under subparagraph (B)(i);]
(ii) [inserted: a description of the impacts and expected impacts of the order, including any costs of additional fuel, maintenance, capital, or labor that have occurred or are expected to occur as a result of the order; and]
(iii) [inserted: any other information relevant to the electric utility or customers of the electric utility.]
(d) Temporary connection during emergency by persons without jurisdiction of Commission During the continuance of any emergency requiring immediate action, any person or municipality engaged in the transmission or sale of electric energy and not otherwise subject to the jurisdiction of the Commission may make such temporary connections with any public utility subject to the jurisdiction of the Commission or may construct such temporary facilities for the transmission of electric energy in interstate commerce as may be necessary or appropriate to meet such emergency, and shall not become subject to the jurisdiction of the Commission by reason of such temporary connection or temporary construction: Provided, That such temporary connection shall be discontinued or such temporary construction removed or otherwise disposed of upon the termination of such emergency: Provided further, That upon approval of the Commission permanent connections for emergency use only may be made hereunder.
(e) Transmission of electric energy to foreign country After six months from August 26, 1935, no person shall transmit any electric energy from the United States to a foreign country without first having secured an order of the Commission authorizing it to do so. The Commission shall issue such order upon application unless, after opportunity for hearing, it finds that the proposed transmission would impair the sufficiency of electric supply within the United States or would impede or tend to impede the coordination in the public interest of facilities subject to the jurisdiction of the Commission. The Commission may by its order grant such application in whole or in part, with such modifications and upon such terms and conditions as the Commission may find necessary or appropriate, and may from time to time, after opportunity for hearing and for good cause shown, make such supplemental orders in the premises as it may find necessary or appropriate.
Rest of § 824a unchanged ·