Skip to content
The People's CodeSearch
Menu

Title 42 · The Public Health and Welfare

Changes to 42 U.S.C. § 7412

S. 4404 · No Passes for Polluters Act of 2026 ·

In committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

42 U.S.C. § 7412 Hazardous air pollutants

+57 −59Shown
More for 42 U.S.C. § 7412
Read § 7412
6 changes the bill asks for here, 6 carried out
  1. Carried out:

    in paragraph (3)(A), by striking paragraphs (4) through (8) and inserting paragraphs (4) through (7);

  2. Carried out:

    by striking paragraph (4); and

  3. Carried out:

    by redesignating paragraphs (5) through (8) as paragraphs (4) through (7), respectively.

  4. Carried out:

    in subsection (d)(8)(C), in the first sentence, by striking subsection (i)(8) and inserting subsection (i)(7); and

  5. Carried out:

    in the second sentence, by striking subsection (i)(5) and inserting subsection (i)(4); and

  6. Carried out:

    in the third sentence, by striking subsection (i)(5)(A) and inserting subsection (i)(4)(A).

§ 7412(d)Emission standards(8)–(10)

Start of § 7412 to (d)(8)(B)(i) unchanged ·

(ii) door and jam cleaning practices.

Notwithstanding subsection (i), the compliance date for such work practice regulations for coke oven batteries shall be not later than the date 3 years after November 15, 1990.

(C) For coke oven batteries electing to qualify for an extension of the compliance date for standards promulgated under subsection (f) in accordance with subsection (i)([struck: 8][inserted: 7]), the emission standards under this subsection for coke oven batteries shall require that coke oven batteries not exceed 8 per centum leaking doors, 1 per centum leaking lids, 5 per centum leaking offtakes, and 16 seconds visible emissions per charge, with no exclusion for emissions during the period after the closing of self-sealing doors. Notwithstanding subsection (i), the compliance date for such emission standards for existing coke oven batteries seeking an extension shall be not later than the date 3 years after November 15, 1990.

(9) Sources licensed by the Nuclear Regulatory Commission No standard for radionuclide emissions from any category or subcategory of facilities licensed by the Nuclear Regulatory Commission (or an Agreement State) is required to be promulgated under this section if the Administrator determines, by rule, and after consultation with the Nuclear Regulatory Commission, that the regulatory program established by the Nuclear Regulatory Commission pursuant to the Atomic Energy Act [42 U.S.C. 2011 et seq.] for such category or subcategory provides an ample margin of safety to protect the public health. Nothing in this subsection shall preclude or deny the right of any State or political subdivision thereof to adopt or enforce any standard or limitation respecting emissions of radionuclides which is more stringent than the standard or limitation in effect under section 7411 of this title or this section.

(10) Effective date Emission standards or other regulations promulgated under this subsection shall be effective upon promulgation.

§ 7412(i)–(j)

(e)–(i) unchanged ·

(B) the source complies with the standard, limitation, or regulation as proposed during the 3-year period immediately after promulgation.

(3) Compliance schedule for existing sources

(A) After the effective date of any emissions standard, limitation or regulation promulgated under this section and applicable to a source, no person may operate such source in violation of such standard, limitation or regulation except, in the case of an existing source, the Administrator shall establish a compliance date or dates for each category or subcategory of existing sources, which shall provide for compliance as expeditiously as practicable, but in no event later than 3 years after the effective date of such standard, except as provided in subparagraph (B) and paragraphs (4) through ([struck: 8][inserted: 7]).

(B) The Administrator (or a State with a program approved under subchapter V) may issue a permit that grants an extension permitting an existing source up to 1 additional year to comply with standards under subsection (d) if such additional period is necessary for the installation of controls. An additional extension of up to 3 years may be added for mining waste operations, if the 4-year compliance time is insufficient to dry and cover mining waste in order to reduce emissions of any pollutant listed under subsection (b).

[struck: (4)] [struck: Presidential exemption] [struck: The President may exempt any stationary source from compliance with any standard or limitation under this section for a period of not more than 2 years if the President determines that the technology to implement such standard is not available and that it is in the national security interests of the United States to do so. An exemption under this paragraph may be extended for 1 or more additional periods, each period not to exceed 2 years. The President shall report to Congress with respect to each exemption (or extension thereof) made under this paragraph.]

[struck: (5)] [inserted: (4)] Early reduction

(A) The Administrator (or a State acting pursuant to a permit program approved under subchapter V) shall issue a permit allowing an existing source, for which the owner or operator demonstrates that the source has achieved a reduction of 90 per centum or more in emissions of hazardous air pollutants (95 per centum in the case of hazardous air pollutants which are particulates) from the source, to meet an alternative emission limitation reflecting such reduction in lieu of an emission limitation promulgated under subsection (d) for a period of 6 years from the compliance date for the otherwise applicable standard, provided that such reduction is achieved before the otherwise applicable standard under subsection (d) is first proposed. Nothing in this paragraph shall preclude a State from requiring reductions in excess of those specified in this subparagraph as a condition of granting the extension authorized by the previous sentence.

(B) An existing source which achieves the reduction referred to in subparagraph (A) after the proposal of an applicable standard but before January 1, 1994, may qualify under subparagraph (A), if the source makes an enforceable commitment to achieve such reduction before the proposal of the standard. Such commitment shall be enforceable to the same extent as a regulation under this section.

(C) The reduction shall be determined with respect to verifiable and actual emissions in a base year not earlier than calendar year 1987, provided that, there is no evidence that emissions in the base year are artificially or substantially greater than emissions in other years prior to implementation of emissions reduction measures. The Administrator may allow a source to use a baseline year of 1985 or 1986 provided that the source can demonstrate to the satisfaction of the Administrator that emissions data for the source reflects verifiable data based on information for such source, received by the Administrator prior to November 15, 1990, pursuant to an information request issued under section 7414 of this title.

(D) For each source granted an alternative emission limitation under this paragraph there shall be established by a permit issued pursuant to subchapter V an enforceable emission limitation for hazardous air pollutants reflecting the reduction which qualifies the source for an alternative emission limitation under this paragraph. An alternative emission limitation under this paragraph shall not be available with respect to standards or requirements promulgated pursuant to subsection (f) and the Administrator shall, for the purpose of determining whether a standard under subsection (f) is necessary, review emissions from sources granted an alternative emission limitation under this paragraph at the same time that other sources in the category or subcategory are reviewed.

(E) With respect to pollutants for which high risks of adverse public health effects may be associated with exposure to small quantities including, but not limited to, chlorinated dioxins and furans, the Administrator shall by regulation limit the use of offsetting reductions in emissions of other hazardous air pollutants from the source as counting toward the 90 per centum reduction in such high-risk pollutants qualifying for an alternative emissions limitation under this paragraph.

[struck: (6)] [inserted: (5)] Other reductions Notwithstanding the requirements of this section, no existing source that has installed—

(A) best available control technology (as defined in section 7479(3) of this title), or

(B) technology required to meet a lowest achievable emission rate (as defined in section 7501 of this title),

prior to the promulgation of a standard under this section applicable to such source and the same pollutant (or stream of pollutants) controlled pursuant to an action described in subparagraph (A) or (B) shall be required to comply with such standard under this section until the date 5 years after the date on which such installation or reduction has been achieved, as determined by the Administrator. The Administrator may issue such rules and guidance as are necessary to implement this paragraph.

[struck: (7)] [inserted: (6)] Extension for new sources A source for which construction or reconstruction is commenced after the date an emission standard applicable to such source is proposed pursuant to subsection (d) but before the date an emission standard applicable to such source is proposed pursuant to subsection (f) shall not be required to comply with the emission standard under subsection (f) until the date 10 years after the date construction or reconstruction is commenced.

[struck: (8)] [inserted: (7)] Coke ovens

(A) Any coke oven battery that complies with the emission limitations established under subsection (d)(8)(C), subparagraph (B), and subparagraph (C), and complies with the provisions of subparagraph (E), shall not be required to achieve emission limitations promulgated under subsection (f) until January 1, 2020.

(B)

(i) Not later than December 31, 1992, the Administrator shall promulgate emission limitations for coke oven emissions from coke oven batteries. Notwithstanding paragraph (3) of this subsection, the compliance date for such emission limitations for existing coke oven batteries shall be January 1, 1998. Such emission limitations shall reflect the lowest achievable emission rate as defined in section 7501 of this title for a coke oven battery that is rebuilt or a replacement at a coke oven plant for an existing battery. Such emission limitations shall be no less stringent than—

(I) 3 per centum leaking doors (5 per centum leaking doors for six meter batteries);

(II) 1 per centum leaking lids;

(III) 4 per centum leaking offtakes; and

(IV) 16 seconds visible emissions per charge,

with an exclusion for emissions during the period after the closing of self-sealing oven doors (or the total mass emissions equivalent). The rulemaking in which such emission limitations are promulgated shall also establish an appropriate measurement methodology for determining compliance with such emission limitations, and shall establish such emission limitations in terms of an equivalent level of mass emissions reduction from a coke oven battery, unless the Administrator finds that such a mass emissions standard would not be practicable or enforceable. Such measurement methodology, to the extent it measures leaking doors, shall take into consideration alternative test methods that reflect the best technology and practices actually applied in the affected industries, and shall assure that the final test methods are consistent with the performance of such best technology and practices.

(ii) If the Administrator fails to promulgate such emission limitations under this subparagraph prior to the effective date of such emission limitations, the emission limitations applicable to coke oven batteries under this subparagraph shall be—

(I) 3 per centum leaking doors (5 per centum leaking doors for six meter batteries);

(II) 1 per centum leaking lids;

(III) 4 per centum leaking offtakes; and

(IV) 16 seconds visible emissions per charge,

or the total mass emissions equivalent (if the total mass emissions equivalent is determined to be practicable and enforceable), with no exclusion for emissions during the period after the closing of self-sealing oven doors.

(C) Not later than January 1, 2007, the Administrator shall review the emission limitations promulgated under subparagraph (B) and revise, as necessary, such emission limitations to reflect the lowest achievable emission rate as defined in section 7501 of this title at the time for a coke oven battery that is rebuilt or a replacement at a coke oven plant for an existing battery. Such emission limitations shall be no less stringent than the emission limitation promulgated under subparagraph (B). Notwithstanding paragraph (2) of this subsection, the compliance date for such emission limitations for existing coke oven batteries shall be January 1, 2010.

(D) At any time prior to January 1, 1998, the owner or operator of any coke oven battery may elect to comply with emission limitations promulgated under subsection (f) by the date such emission limitations would otherwise apply to such coke oven battery, in lieu of the emission limitations and the compliance dates provided under subparagraphs (B) and (C) of this paragraph. Any such owner or operator shall be legally bound to comply with such emission limitations promulgated under subsection (f) with respect to such coke oven battery as of January 1, 2003. If no such emission limitations have been promulgated for such coke oven battery, the Administrator shall promulgate such emission limitations in accordance with subsection (f) for such coke oven battery.

(E) Coke oven batteries qualifying for an extension under subparagraph (A) shall make available not later than January 1, 2000, to the surrounding communities the results of any risk assessment performed by the Administrator to determine the appropriate level of any emission standard established by the Administrator pursuant to subsection (f).

(F) Notwithstanding the provisions of this section, reconstruction of any source of coke oven emissions qualifying for an extension under this paragraph shall not subject such source to emission limitations under subsection (f) more stringent than those established under subparagraphs (B) and (C) until January 1, 2020. For the purposes of this subparagraph, the term “reconstruction” includes the replacement of existing coke oven battery capacity with new coke oven batteries of comparable or lower capacity and lower potential emissions.

(j) Equivalent emission limitation by permit

(1) Effective date The requirements of this subsection shall apply in each State beginning on the effective date of a permit program established pursuant to subchapter V in such State, but not prior to the date 42 months after November 15, 1990.

§ 7412(j)–(k)

(j)(2)–(3) unchanged ·

(4) Review and approval Permit applications submitted under this subsection shall be reviewed and approved or disapproved according to the provisions of section 7661d of this title. In the event that the Administrator (or the State) disapproves a permit application submitted under this subsection or determines that the application is incomplete, the applicant shall have up to 6 months to revise the application to meet the objections of the Administrator (or the State).

(5) Emission limitation The permit shall be issued pursuant to subchapter V and shall contain emission limitations for the hazardous air pollutants subject to regulation under this section and emitted by the source that the Administrator (or the State) determines, on a case-by-case basis, to be equivalent to the limitation that would apply to such source if an emission standard had been promulgated in a timely manner under subsection (d). In the alternative, if the applicable criteria are met, the permit may contain an emissions limitation established according to the provisions of subsection (i)([struck: 5][inserted: 4]). For purposes of the preceding sentence, the reduction required by subsection (i)([struck: 5][inserted: 4])(A) shall be achieved by the date on which the relevant standard should have been promulgated under subsection (d). No such pollutant may be emitted in amounts exceeding an emission limitation contained in a permit immediately for new sources and, as expeditiously as practicable, but not later than the date 3 years after the permit is issued for existing sources or such other compliance date as would apply under subsection (i).

(6) Applicability of subsequent standards If the Administrator promulgates an emission standard that is applicable to the major source prior to the date on which a permit application is approved, the emission limitation in the permit shall reflect the promulgated standard rather than the emission limitation determined pursuant to paragraph (5), provided that the source shall have the compliance period provided under subsection (i). If the Administrator promulgates a standard under subsection (d) that would be applicable to the source in lieu of the emission limitation established by permit under this subsection after the date on which the permit has been issued, the Administrator (or the State) shall revise such permit upon the next renewal to reflect the standard promulgated by the Administrator providing such source a reasonable time to comply, but no longer than 8 years after such standard is promulgated or 8 years after the date on which the source is first required to comply with the emissions limitation established by paragraph (5), whichever is earlier.

(k) Area source program

Rest of § 7412 unchanged ·

Step through the changes