Title 33 · Navigation and Navigable Waters
Changes to 33 U.S.C. § 1344
S. 4475 · Unlock American Energy and Jobs Act of 2026 · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
33 U.S.C. § 1344 Permits for dredged or fill material
20 changes the bill asks for here, 9 carried out
- Not carried out:
by striking the heading and section designation and all that follows through (a) The Secretary and inserting the following:
404. Permits for dredged or fill material (a) Discharge into navigable waters at specified disposal sites.— (1) In general.— The Secretary;
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: striking the heading and section designation and all that follows through QTEXT and inserting the following: QCONTENT; - Not carried out:
by striking
this subsection
each place it appears and insertingparagraph (1)
; andThe bill points to (1) in § 1344(a), which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.
Technical detail
target not found: no level (1) under /us/usc/t33/s1344/a - Not carried out:
by striking Not later than the fifteenth day and inserting the following:(2) Notice.— Not later than the 15th day;
The bill points to (1) in § 1344(a), which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.
Technical detail
target not found: no level (1) under /us/usc/t33/s1344/a - Not carried out:
by striking
his finding and his reasons
and insertingthe findings and reasons of the Administrator
; and“his finding and his reasons” isn't in § 1344(c) in the Code as we have it. The law may have changed since the bill was drafted.
Technical detail
“his finding and his reasons” not found in /us/usc/t33/s1344/c - Carried out:
by striking The Administrator and inserting the following:(4) Findings and reasoning.— The Administrator;
- Not carried out:
in the second sentence, by striking Before making such determination and inserting the following:(3) Consultation.— Before making a determination under paragraph (1);
The bill puts these words in a provision numbered (3), which can't be the first one in § 1344(c), so we couldn't tell where it goes.
Technical detail
(3) can't be the first provision of /us/usc/t33/s1344/c - Not carried out:
by striking (c) The Administrator and inserting the following:(c) Prohibition of specification of areas as disposal sites.— (1) In general.— Subject to paragraph (2), the Administrator; and
The bill gives this provision a heading and rewords it at the same time, a kind of change we can't show yet.
Technical detail
the provision inserted says more than a heading and the words struck - Not carried out:
by inserting after paragraph (1) (as so designated) the following:
(2) Limitation.— The Administrator may not prohibit the specification of a defined area as a disposal site, or otherwise deny or restrict the use of a defined area as a disposal site after a permit under this section for the area has been issued by the Secretary.;
The bill points to paragraph (1) of § 1344(c), which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.
Technical detail
no paragraph (1) in /us/usc/t33/s1344/c - Not carried out:
by striking subsection (b)(1) of this section, and (B) set forth and inserting the following:(ii) set forth subsection (b)(1); and;
The bill puts these words in a provision numbered (ii), which can't be the first one in § 1344(e)(1), so we couldn't tell where it goes.
Technical detail
(ii) can't be the first provision of /us/usc/t33/s1344/e/1 - Carried out:
by striking shall (A) be based and inserting the following:(i) be based shall—; and
- Not carried out:
by striking Any general and inserting the following:(B) Requirements for issuance.— Any general;
§ 1344(e)(1) already has provisions of its own, so its opening words can't simply become the first of them.
Technical detail
/us/usc/t33/s1344/e/1 has provisions already, so its words can't become the first - Not carried out:
by striking (e)(1) In carrying and inserting the following:(e) General permits on State, regional, or nationwide basis.— (1) Permits authorized.— (A) In general.— In carrying;
The bill gives this provision a heading and rewords it at the same time, a kind of change we can't show yet.
Technical detail
the provision inserted says more than a heading and the words struck - Carried out:
by striking (2) No general and inserting the following:(2) Term.— No general; and
- Carried out:
by striking
five years
and inserting10 years
; and - Carried out:
by adding at the end the following:
(3) Considerations.— In determining the environmental effects of an activity under paragraph (1) or (2), the Secretary— (A) shall consider only the effects of any discharge of dredged or fill material resulting from the activity; (B) shall consider any effects of a discharge of …
- Carried out:
in paragraph (1), by adding at the end the following:
(I) To issue permits not later than the date that is 1 year after the date on which the State receives an application for the permit, which may not be paused or tolled for any reason. (J) To ensure that, if the State does not issue a final action with respect to an application …
- Carried out:
by adding at the end the following:
(6) Action required.— (A) In general.— A State with a permit program approved under this subsection shall issue a final action with respect to an application for a permit described in subsection (g)(1) not later than 1 year after the date of receipt of the application. (B) …
- Carried out:
in subsection (s)(3), in the third sentence, by striking
acton
and insertingaction
; - Not carried out:
in subsection (t), by striking (t) Nothing and inserting the following:(u) Savings provision.— Nothing; and
The bill puts these words in a provision numbered (u), which can't be the first one in § 1344(t), so we couldn't tell where it goes.
Technical detail
(u) can't be the first provision of /us/usc/t33/s1344/t - Carried out:
by inserting after subsection (s) the following:
(t) Judicial review.— (1) Statute of limitations.— (A) In general.— Notwithstanding any other provision of law, an action seeking judicial review of an individual or general permit issued under this section shall be filed not later than the date that is 60 days after the date on …
The section already has a provision under this letter or number, so it would have two.
This bill puts a provision under a letter or number this section already uses, so the section would have two. The law has probably changed since the bill was written.
§ 1344(a)–(f)
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| § 1344. Permits for dredged or fill material | § 1344. Permits for dredged or fill material | |||
| (a) | (a) Discharge into navigable waters at specified disposal sites | (a) Discharge into navigable waters at specified disposal sites | ||
| The Secretary may issue permits, after notice and opportunity for public hearings for the discharge of dredged or fill material into the navigable waters at specified disposal sites. Not later than the fifteenth day after the date an applicant submits all the information required to complete an application for a permit under this subsection, the Secretary shall publish the notice required by this subsection. | The Secretary may issue permits, after notice and opportunity for public hearings for the discharge of dredged or fill material into the navigable waters at specified disposal sites. Not later than the fifteenth day after the date an applicant submits all the information required to complete an application for a permit under this subsection, the Secretary shall publish the notice required by this subsection. | |||
| (b) | (b) Specification for disposal sites | (b) Specification for disposal sites | ||
| Subject to subsection (c) of this section, each such disposal site shall be specified for each such permit by the Secretary (1) through the application of guidelines developed by the Administrator, in conjunction with the Secretary, which guidelines shall be based upon criteria comparable to the criteria applicable to the territorial seas, the contiguous zone, and the ocean under section 1343(c) of this title, and (2) in any case where such guidelines under clause (1) alone would prohibit the specification of a site, through the application additionally of the economic impact of the site on navigation and anchorage. | Subject to subsection (c) of this section, each such disposal site shall be specified for each such permit by the Secretary (1) through the application of guidelines developed by the Administrator, in conjunction with the Secretary, which guidelines shall be based upon criteria comparable to the criteria applicable to the territorial seas, the contiguous zone, and the ocean under section 1343(c) of this title, and (2) in any case where such guidelines under clause (1) alone would prohibit the specification of a site, through the application additionally of the economic impact of the site on navigation and anchorage. | |||
| (c) | (c) Denial or restriction of use of defined areas as disposal sites | (c) Denial or restriction of use of defined areas as disposal sites | ||
| (c)(4) | (4) [inserted: Findings and reasoning.—] | |||
| [inserted: The Administrator is authorized to prohibit the specification (including the withdrawal of specification) of any defined area as a disposal site, and he is authorized to deny or restrict the use of any defined area for specification (including the withdrawal of specification) as a disposal site, whenever he determines, after notice and opportunity for public hearings, that the discharge of such materials into such area will have an unacceptable adverse effect on municipal water supplies, shellfish beds and fishery areas (including spawning and breeding areas), wildlife, or recreational areas. Before making such determination, the Administrator shall consult with the Secretary. The Administrator shall set forth in writing and make public his findings and his reasons for making any determination under this subsection.] | ||||
| (c) | ||||
| (d) | (d) “Secretary” defined | (d) “Secretary” defined | ||
| The term “Secretary” as used in this section means the Secretary of the Army, acting through the Chief of Engineers. | The term “Secretary” as used in this section means the Secretary of the Army, acting through the Chief of Engineers. | |||
| (e) | (e) General permits on State, regional, or nationwide basis | (e) General permits on State, regional, or nationwide basis | ||
| (e)(1) | (1) | (1) | ||
| [inserted: In carrying out his functions relating to the discharge of dredged or fill material under this section, the Secretary may, after notice and opportunity for public hearing, issue general permits on a State, regional, or nationwide basis for any category of activities involving discharges of dredged or fill material if the Secretary determines that the activities in such category are similar in nature, will cause only minimal adverse environmental effects when performed separately, and will have only minimal cumulative adverse effect on the environment. Any general permit issued under this subsection shall—] | ||||
| (e)(1)(i) | (i) [inserted: ] | |||
| [inserted: be based on the guidelines described in subsection (b)(1) of this section, and (B) set forth the requirements and standards which shall apply to any activity authorized by such general permit.] | ||||
| (e)(1) | ||||
| (e)(2) | (2) | (2) [inserted: Term.—] | ||
| No general permit issued under this subsection shall be for a period of more than | No general permit issued under this subsection shall be for a period of more than [inserted: 10] years after the date of its issuance and such general permit may be revoked or modified by the Secretary if, after opportunity for public hearing, the Secretary determines that the activities authorized by such general permit have an adverse impact on the environment or such activities are more appropriately authorized by individual permits. | |||
| (e)(3) | (3) [inserted: Considerations.—] | |||
| [inserted: In determining the environmental effects of an activity under paragraph (1) or (2), the Secretary—] | ||||
| (e)(3)(A) | (A) [inserted: ] | |||
| [inserted: shall consider only the effects of any discharge of dredged or fill material resulting from the activity;] | ||||
| (e)(3)(B) | (B) [inserted: ] | |||
| [inserted: shall consider any effects of a discharge of dredged or fill material into fewer than 3 acres of navigable waters to be a minimal adverse environmental effect; and] | ||||
| (e)(3)(C) | (C) [inserted: ] | |||
| [inserted: may consider any effects of a discharge of dredged or fill material into 3 acres or more of navigable waters to be a minimal adverse environmental effect.] | ||||
| (e)(4) | (4) [inserted: Single and complete projects.—] | |||
| (e)(4)(A) | (A) [inserted: Definition of single and complete project.—] | |||
| (e)(4)(A)(i) | (i) [inserted: In general.—] | |||
| [inserted: In this paragraph, the term “single and complete project”, with respect to a project for which the Secretary is determining whether a general permit issued under this subsection applies, means that portion of the total project proposed or accomplished by—] | ||||
| (e)(4)(A)(i)(I) | (I) [inserted: ] | |||
| [inserted: a single owner or developer;] | ||||
| (e)(4)(A)(i)(II) | (II) [inserted: ] | |||
| [inserted: a partnership of 1 or more owners or developers; or] | ||||
| (e)(4)(A)(i)(III) | (III) [inserted: ] | |||
| [inserted: an association of owners or developers.] | ||||
| (e)(4)(A)(ii) | (ii) [inserted: Linear projects.—] | |||
| (e)(4)(A)(ii)(I) | (I) [inserted: Definition.—] | |||
| [inserted: In this clause, the term “linear project” means a project constructed for the purpose of getting people, goods, energy, or services from a point of origin to a terminal point, which may involve multiple crossings of 1 or more waters of the United States at separate and distant locations.] | ||||
| (e)(4)(A)(ii)(II) | (II) [inserted: General rule.—] | |||
| [inserted: For purposes of this paragraph, with respect to projects described in clause (i) that are linear projects—] | ||||
| (e)(4)(A)(ii)(II)(aa) | (aa) [inserted: ] | |||
| [inserted: the crossings of separate waters of the United States at a specific location shall be considered 1 single and complete project; but] | ||||
| (e)(4)(A)(ii)(II)(bb) | (bb) [inserted: ] | |||
| [inserted: each crossing of a single water of the United States shall be considered a separate single and complete project if those crossings are at separate and distant locations.] | ||||
| (e)(4)(A)(ii)(III) | (III) [inserted: Additional exclusions.—] | |||
| [inserted: For purposes of subclause (II), individual channels in a braided stream or river, individual arms of a large, irregularly-shaped wetland or lake, and other, similar bodies of water shall not be considered to be separate waters of the United States.] | ||||
| (e)(4)(B) | (B) [inserted: Requirement.—] | |||
| [inserted: In determining whether a general permit issued under this subsection applies to an activity, the Secretary shall consider the estimated total of all losses of waters of the United States expected to result from the single and complete project.] | ||||
| (e)(4)(C) | (C) [inserted: Use of multiple permits.—] | |||
| [inserted: The Secretary may combine 2 or more general permits issued under this subsection to authorize a single and complete project, but the same general permit issued under this subsection may not be used more than once for a single and complete project.] | ||||
| (e)(5) | (5) [inserted: Reissuance of nationwide permits.—] | |||
| [inserted: In determining whether to reissue a general permit issued under this subsection on a nationwide basis—] | ||||
| (e)(5)(A) | (A) [inserted: ] | |||
| [inserted: no consultation with an applicable State pursuant to section 6(a) of the Endangered Species Act of 1973 (16 U.S.C. 1535(a)) is required;] | ||||
| (e)(5)(B) | (B) [inserted: ] | |||
| [inserted: no consultation with a Federal agency pursuant to section 7(a)(2) of that Act (16 U.S.C. 1536(a)(2)) is required; and] | ||||
| (e)(5)(C) | (C) [inserted: ] | |||
| [inserted: for purposes of carrying out the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to that reissuance, conducting an environmental assessment on a nationwide basis is sufficient for purposes of compliance with that Act.] | ||||
| (e)(6) | (6) [inserted: Nationwide permit for oil and natural gas pipelines.—] | |||
| [inserted: Notwithstanding any other provision of this section, the Secretary shall maintain a nationwide permit for the activities required for the construction, maintenance, repair, operation, and removal of oil and natural gas pipelines and associated facilities that result in the loss of, with respect to waters of the United States, an area of fewer than 3 acres for each single and complete project (as defined in paragraph (4)(A)), which shall be known as “nationwide permit 12”.] | ||||
| (f) | (f) Non-prohibited discharge of dredged or fill material | (f) Non-prohibited discharge of dredged or fill material | ||
| (f)(1) | (1) | (1) | ||
| Except as provided in paragraph (2) of this subsection, the discharge of dredged or fill material— | Except as provided in paragraph (2) of this subsection, the discharge of dredged or fill material— | |||
§ 1344(h)Determination of State’s authority to issue permits under State program; approval; notification; transfers to State program(1)–(2)
(f)(1)(A)–(h)(1)(F) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (1)(G) | (G) | (G) | ||
| To abate violations of the permit or the permit program, including civil and criminal penalties and other ways and means of enforcement. | To abate violations of the permit or the permit program, including civil and criminal penalties and other ways and means of enforcement. | |||
| (1)(H) | (H) | (H) | ||
| To assure continued coordination with Federal and Federal-State water-related planning and review processes. | To assure continued coordination with Federal and Federal-State water-related planning and review processes. | |||
| (1)(I) | (I) [inserted: ] | |||
| [inserted: To issue permits not later than the date that is 1 year after the date on which the State receives an application for the permit, which may not be paused or tolled for any reason.] | ||||
| (1)(J) | (J) [inserted: ] | |||
| [inserted: To ensure that, if the State does not issue a final action with respect to an application for a permit within the 1-year period described in subparagraph (I), the application is considered to be approved.] | ||||
| (1)(K) | (K) [inserted: ] | |||
| [inserted: To carry out a programmatic review of the program annually to ensure that the program does not exceed the authority granted to the State under this section.] | ||||
| (2) | (2) | (2) | ||
| If, with respect to a State program submitted under subsection (g)(1) of this section, the Administrator determines that such State— | If, with respect to a State program submitted under subsection (g)(1) of this section, the Administrator determines that such State— | |||
| (2)(A) | (A) | (A) | ||
| has the authority set forth in paragraph (1) of this subsection, the Administrator shall approve the program and so notify (i) such State and (ii) the Secretary, who upon subsequent notification from such State that it is administering such program, shall suspend the issuance of permits under subsections (a) and (e) of this section for activities with respect to which a permit may be issued pursuant to such State program; or | has the authority set forth in paragraph (1) of this subsection, the Administrator shall approve the program and so notify (i) such State and (ii) the Secretary, who upon subsequent notification from such State that it is administering such program, shall suspend the issuance of permits under subsections (a) and (e) of this section for activities with respect to which a permit may be issued pursuant to such State program; or | |||
§ 1344(h)–(j)
(h)(2)(B)–(3) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (h)(4) | (4) | (4) | ||
| After the Secretary receives notification from the Administrator under paragraph (2) or (3) of this subsection that a State permit program has been approved, the Secretary shall transfer any applications for permits pending before the Secretary for activities with respect to which a permit may be issued pursuant to such State program to such State for appropriate action. | After the Secretary receives notification from the Administrator under paragraph (2) or (3) of this subsection that a State permit program has been approved, the Secretary shall transfer any applications for permits pending before the Secretary for activities with respect to which a permit may be issued pursuant to such State program to such State for appropriate action. | |||
| (h)(5) | (5) | (5) | ||
| Upon notification from a State with a permit program approved under this subsection that such State intends to administer and enforce the terms and conditions of a general permit issued by the Secretary under subsection (e) of this section with respect to activities in such State to which such general permit applies, the Secretary shall suspend the administration and enforcement of such general permit with respect to such activities. | Upon notification from a State with a permit program approved under this subsection that such State intends to administer and enforce the terms and conditions of a general permit issued by the Secretary under subsection (e) of this section with respect to activities in such State to which such general permit applies, the Secretary shall suspend the administration and enforcement of such general permit with respect to such activities. | |||
| (h)(6) | (6) [inserted: Action required.—] | |||
| (h)(6)(A) | (A) [inserted: In general.—] | |||
| [inserted: A State with a permit program approved under this subsection shall issue a final action with respect to an application for a permit described in subsection (g)(1) not later than 1 year after the date of receipt of the application.] | ||||
| (h)(6)(B) | (B) [inserted: Failure to act.—] | |||
| [inserted: An application for a permit described in subsection (g)(1) submitted to a State with a permit program approved under this subsection shall be considered to be approved if the State fails to issue a final action with respect to the application by the end of the 1-year period described in subparagraph (A).] | ||||
| (h)(6)(C) | (C) [inserted: No pausing or tolling.—] | |||
| [inserted: The 1-year period described in subparagraph (A) may not be paused or tolled for any reason.] | ||||
| (i) | (i) Withdrawal of approval | (i) Withdrawal of approval | ||
| Whenever the Administrator determines after public hearing that a State is not administering a program approved under subsection (h)(2)(A) of this section, in accordance with this section, including, but not limited to, the guidelines established under subsection (b)(1) of this section, the Administrator shall so notify the State, and, if appropriate corrective action is not taken within a reasonable time, not to exceed ninety days after the date of the receipt of such notification, the Administrator shall (1) withdraw approval of such program until the Administrator determines such corrective action has been taken, and (2) notify the Secretary that the Secretary shall resume the program for the issuance of permits under subsections (a) and (e) of this section for activities with respect to which the State was issuing permits and that such authority of the Secretary shall continue in effect until such time as the Administrator makes the determination described in clause (1) of this subsection and such State again has an approved program. | Whenever the Administrator determines after public hearing that a State is not administering a program approved under subsection (h)(2)(A) of this section, in accordance with this section, including, but not limited to, the guidelines established under subsection (b)(1) of this section, the Administrator shall so notify the State, and, if appropriate corrective action is not taken within a reasonable time, not to exceed ninety days after the date of the receipt of such notification, the Administrator shall (1) withdraw approval of such program until the Administrator determines such corrective action has been taken, and (2) notify the Secretary that the Secretary shall resume the program for the issuance of permits under subsections (a) and (e) of this section for activities with respect to which the State was issuing permits and that such authority of the Secretary shall continue in effect until such time as the Administrator makes the determination described in clause (1) of this subsection and such State again has an approved program. | |||
| (j) | (j) Copies of applications for State permits and proposed general permits to be transmitted to Administrator | (j) Copies of applications for State permits and proposed general permits to be transmitted to Administrator | ||
| Each State which is administering a permit program pursuant to this section shall transmit to the Administrator (1) a copy of each permit application received by such State and provide notice to the Administrator of every action related to the consideration of such permit application, including each permit proposed to be issued by such State, and (2) a copy of each proposed general permit which such State intends to issue. Not later than the tenth day after the date of the receipt of such permit application or such proposed general permit, the Administrator shall provide copies of such permit application or such proposed general permit to the Secretary and the Secretary of the Interior, acting through the Director of the United States Fish and Wildlife Service. If the Administrator intends to provide written comments to such State with respect to such permit application or such proposed general permit, he shall so notify such State not later than the thirtieth day after the date of the receipt of such application or such proposed general permit and provide such written comments to such State, after consideration of any comments made in writing with respect to such application or such proposed general permit by the Secretary and the Secretary of the Interior, acting through the Director of the United States Fish and Wildlife Service, not later than the ninetieth day after the date of such receipt. If such State is so notified by the Administrator, it shall not issue the proposed permit until after the receipt of such comments from the Administrator, or after such ninetieth day, whichever first occurs. Such State shall not issue such proposed permit after such ninetieth day if it has received such written comments in which the Administrator objects (A) to the issuance of such proposed permit and such proposed permit is one that has been submitted to the Administrator pursuant to subsection (h)(1)(E), or (B) to the issuance of such proposed permit as being outside the requirements of this section, including, but not limited to, the guidelines developed under subsection (b)(1) of this section unless it modifies such proposed permit in accordance with such comments. Whenever the Administrator objects to the issuance of a permit under the preceding sentence such written objection shall contain a statement of the reasons for such objection and the conditions which such permit would include if it were issued by the Administrator. In any case where the Administrator objects to the issuance of a permit, on request of the State, a public hearing shall be held by the Administrator on such objection. If the State does not resubmit such permit revised to meet such objection within 30 days after completion of the hearing or, if no hearing is requested within 90 days after the date of such objection, the Secretary may issue the permit pursuant to subsection (a) or (e) of this section, as the case may be, for such source in accordance with the guidelines and requirements of this chapter. | Each State which is administering a permit program pursuant to this section shall transmit to the Administrator (1) a copy of each permit application received by such State and provide notice to the Administrator of every action related to the consideration of such permit application, including each permit proposed to be issued by such State, and (2) a copy of each proposed general permit which such State intends to issue. Not later than the tenth day after the date of the receipt of such permit application or such proposed general permit, the Administrator shall provide copies of such permit application or such proposed general permit to the Secretary and the Secretary of the Interior, acting through the Director of the United States Fish and Wildlife Service. If the Administrator intends to provide written comments to such State with respect to such permit application or such proposed general permit, he shall so notify such State not later than the thirtieth day after the date of the receipt of such application or such proposed general permit and provide such written comments to such State, after consideration of any comments made in writing with respect to such application or such proposed general permit by the Secretary and the Secretary of the Interior, acting through the Director of the United States Fish and Wildlife Service, not later than the ninetieth day after the date of such receipt. If such State is so notified by the Administrator, it shall not issue the proposed permit until after the receipt of such comments from the Administrator, or after such ninetieth day, whichever first occurs. Such State shall not issue such proposed permit after such ninetieth day if it has received such written comments in which the Administrator objects (A) to the issuance of such proposed permit and such proposed permit is one that has been submitted to the Administrator pursuant to subsection (h)(1)(E), or (B) to the issuance of such proposed permit as being outside the requirements of this section, including, but not limited to, the guidelines developed under subsection (b)(1) of this section unless it modifies such proposed permit in accordance with such comments. Whenever the Administrator objects to the issuance of a permit under the preceding sentence such written objection shall contain a statement of the reasons for such objection and the conditions which such permit would include if it were issued by the Administrator. In any case where the Administrator objects to the issuance of a permit, on request of the State, a public hearing shall be held by the Administrator on such objection. If the State does not resubmit such permit revised to meet such objection within 30 days after completion of the hearing or, if no hearing is requested within 90 days after the date of such objection, the Secretary may issue the permit pursuant to subsection (a) or (e) of this section, as the case may be, for such source in accordance with the guidelines and requirements of this chapter. | |||
§ 1344(s)–(t)
(k)–(s) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (s)(2) | (2) | (2) | ||
| A copy of any order issued under this subsection shall be sent immediately by the Secretary to the State in which the violation occurs and other affected States. Any order issued under this subsection shall be by personal service and shall state with reasonable specificity the nature of the violation, specify a time for compliance, not to exceed thirty days, which the Secretary determines is reasonable, taking into account the seriousness of the violation and any good faith efforts to comply with applicable requirements. In any case in which an order under this subsection is issued to a corporation, a copy of such order shall be served on any appropriate corporate officers. | A copy of any order issued under this subsection shall be sent immediately by the Secretary to the State in which the violation occurs and other affected States. Any order issued under this subsection shall be by personal service and shall state with reasonable specificity the nature of the violation, specify a time for compliance, not to exceed thirty days, which the Secretary determines is reasonable, taking into account the seriousness of the violation and any good faith efforts to comply with applicable requirements. In any case in which an order under this subsection is issued to a corporation, a copy of such order shall be served on any appropriate corporate officers. | |||
| (s)(3) | (3) | (3) | ||
| The Secretary is authorized to commence a civil action for appropriate relief, including a permanent or temporary injunction for any violation for which he is authorized to issue a compliance order under paragraph (1) of this subsection. Any action under this paragraph may be brought in the district court of the United States for the district in which the defendant is located or resides or is doing business, and such court shall have jurisdiction to restrain such violation and to require compliance. Notice of the commencement of such | The Secretary is authorized to commence a civil action for appropriate relief, including a permanent or temporary injunction for any violation for which he is authorized to issue a compliance order under paragraph (1) of this subsection. Any action under this paragraph may be brought in the district court of the United States for the district in which the defendant is located or resides or is doing business, and such court shall have jurisdiction to restrain such violation and to require compliance. Notice of the commencement of such [inserted: action] shall be given immediately to the appropriate State. | |||
| (s)(4) | (4) | (4) | ||
| Any person who violates any condition or limitation in a permit issued by the Secretary under this section, and any person who violates any order issued by the Secretary under paragraph (1) of this subsection, shall be subject to a civil penalty not to exceed $25,000 per day for each violation. In determining the amount of a civil penalty the court shall consider the seriousness of the violation or violations, the economic benefit (if any) resulting from the violation, any history of such violations, any good-faith efforts to comply with the applicable requirements, the economic impact of the penalty on the violator, and such other matters as justice may require. | Any person who violates any condition or limitation in a permit issued by the Secretary under this section, and any person who violates any order issued by the Secretary under paragraph (1) of this subsection, shall be subject to a civil penalty not to exceed $25,000 per day for each violation. In determining the amount of a civil penalty the court shall consider the seriousness of the violation or violations, the economic benefit (if any) resulting from the violation, any history of such violations, any good-faith efforts to comply with the applicable requirements, the economic impact of the penalty on the violator, and such other matters as justice may require. | |||
| (t) | (t) [inserted: Judicial review.—] | |||
| (t)(1) | (1) [inserted: Statute of limitations.—] | |||
| (t)(1)(A) | (A) [inserted: In general.—] | |||
| [inserted: Notwithstanding any other provision of law, an action seeking judicial review of an individual or general permit issued under this section shall be filed not later than the date that is 60 days after the date on which the permit was issued.] | ||||
| (t)(1)(B) | (B) [inserted: Savings provision.—] | |||
| [inserted: Nothing in subparagraph (A) authorizes an action seeking judicial review of the structure of or authorization for a State permit program approved pursuant to this section.] | ||||
| (t)(2) | (2) [inserted: Timeline to act on remand.—] | |||
| [inserted: If a Federal court remands a permit under this section, the Federal court shall set and enforce a reasonable schedule and deadline, which may not exceed 180 days from the date on which the Federal court remands the permit, for the issuer of the permit to act on that remand.] | ||||
| (t) | (t) Navigable waters within State jurisdiction | (t) Navigable waters within State jurisdiction | ||
| Nothing in this section shall preclude or deny the right of any State or interstate agency to control the discharge of dredged or fill material in any portion of the navigable waters within the jurisdiction of such State, including any activity of any Federal agency, and each such agency shall comply with such State or interstate requirements both substantive and procedural to control the discharge of dredged or fill material to the same extent that any person is subject to such requirements. This section shall not be construed as affecting or impairing the authority of the Secretary to maintain navigation. | Nothing in this section shall preclude or deny the right of any State or interstate agency to control the discharge of dredged or fill material in any portion of the navigable waters within the jurisdiction of such State, including any activity of any Federal agency, and each such agency shall comply with such State or interstate requirements both substantive and procedural to control the discharge of dredged or fill material to the same extent that any person is subject to such requirements. This section shall not be construed as affecting or impairing the authority of the Secretary to maintain navigation. | |||