Changes to the Code
S. 4765 · Let America Build Act of 2026 · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
15 U.S.C. § 717b Exportation or importation of natural gas; LNG terminals
1 change the bill asks for here, 1 carried out
- Carried out:
Section 3 of the Natural Gas Act (15 U.S.C. 717b) is amended by striking subsection (c) and inserting the following:
(c) Expedited application and approval process.— (1) In general.— For purposes of subsection (a), the following actions shall be considered to be consistent with the public interest, and applications for each of the following actions shall be granted without modification or …
§ 717b(b)–(d)
Start of § 717b to (b) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (b)(1) | (1) | (1) | ||
| the importation of such natural gas shall be treated as a “first sale” within the meaning of section 3301(21) of this title; and | the importation of such natural gas shall be treated as a “first sale” within the meaning of section 3301(21) of this title; and | |||
| (b)(2) | (2) | (2) | ||
| the Commission shall not, on the basis of national origin, treat any such imported natural gas on an unjust, unreasonable, unduly discriminatory, or preferential basis. | the Commission shall not, on the basis of national origin, treat any such imported natural gas on an unjust, unreasonable, unduly discriminatory, or preferential basis. | |||
| (c) | (c) Expedited application and approval process | (c) Expedited application and approval process[inserted: .—] | ||
| (c)(1) | (1) [inserted: In general.—] | |||
| [inserted: For purposes of subsection (a), the following actions shall be considered to be consistent with the public interest, and applications for each of the following actions shall be granted without modification or delay:] | ||||
| (c)(1)(A) | (A) [inserted: ] | |||
| [inserted: The importation of natural gas referred to in subsection (b).] | ||||
| (c)(1)(B) | (B) [inserted: ] | |||
| [inserted: The exportation of natural gas in a volume of not more than 51,750,000,000 cubic feet per year, subject to the last sentence of subsection (a).] | ||||
| (c)(1)(C) | (C) [inserted: ] | |||
| [inserted: The exportation of natural gas to a nation with which there is in effect a free trade agreement requiring national treatment for trade in natural gas.] | ||||
| (c)(2) | (2) [inserted: Exclusion.—] | |||
| [inserted: Subparagraphs (B) and (C) of paragraph (1) shall not apply to any nation subject to sanctions imposed by the United States.] | ||||
| (c) | ||||
| (d) | (d) Construction with other laws | (d) Construction with other laws | ||
| Except as specifically provided in this chapter, nothing in this chapter affects the rights of States under— | Except as specifically provided in this chapter, nothing in this chapter affects the rights of States under— | |||
| (d)(1) | (1) | (1) | ||
| the Coastal Zone Management Act of 1972 (16 U.S.C. 1451 et seq.); | the Coastal Zone Management Act of 1972 (16 U.S.C. 1451 et seq.); | |||
Rest of § 717b unchanged
15 U.S.C. § 717n Process coordination; hearings; rules of procedure
6 changes the bill asks for here, 2 carried out
- Carried out:
in subsection (a), by striking (a) In this section, and inserting the following:(a) Definition of Federal authorization.— In this section,;
- Not carried out:
in the second sentence, by striking In any proceeding and inserting the following:(2) Proceedings.— In any proceeding; and
The bill turns “In any proceeding” into a provision of its own, but in § 717n(e) the text doesn't begin with those words. The law may have changed since the bill was drafted.
Technical detail
“In any proceeding” does not open the text of /us/usc/t15/s717n/e - Not carried out:
by striking (e) Hearings under this act and inserting the following:(e) Hearings and proceedings.— (1) Hearings.— Hearings under this Act;
The bill gives this provision a heading and rewords it at the same time, a kind of change we can't show yet.
Technical detail
the provision inserted says more than a heading and the words struck - Not carried out:
in the second sentence, by striking No informality and inserting the following:(2) Informalities.— No informality; and
The bill turns “No informality” into a provision of its own, but in § 717n(f) the text doesn't begin with those words. The law may have changed since the bill was drafted.
Technical detail
“No informality” does not open the text of /us/usc/t15/s717n/f - Not carried out:
by striking (f) All hearings, and inserting the following:(f) Governing rules.— (1) In general.— All hearings,; and
The bill gives this provision a heading and rewords it at the same time, a kind of change we can't show yet.
Technical detail
the provision inserted says more than a heading and the words struck - Carried out:
by inserting after subsection (f) the following:
(g) Additional requirements.— (1) Definition of Effects.— In conducting a review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) relating to any Federal authorization (or to any other decision relating to the issuance of an order or certificate, or …
§ 717n(a)
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| § 717n. Process coordination; hearings; rules of procedure | § 717n. Process coordination; hearings; rules of procedure | |||
| (a) | (a) Definition | (a) Definition[inserted: of Federal authorization.—] | ||
| In this section, the term “Federal authorization”— | In this section, the term “Federal authorization”— | |||
| (a)(1) | (1) | (1) | ||
| means any authorization required under Federal law with respect to an application for authorization under section 717b of this title or a certificate of public convenience and necessity under section 717f of this title; and | means any authorization required under Federal law with respect to an application for authorization under section 717b of this title or a certificate of public convenience and necessity under section 717f of this title; and |
§ 717n(e)–(g)
(a)(2)–(d)(2) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (e) | (e) Hearings; parties | (e) Hearings; parties | ||
| Hearings under this chapter may be held before the Commission, any member or members thereof, or any representative of the Commission designated by it, and appropriate records thereof shall be kept. In any proceeding before it, the Commission in accordance with such rules and regulations as it may prescribe, may admit as a party any interested State, State commission, municipality or any representative of interested consumers or security holders, or any competitor of a party to such proceeding, or any other person whose participation in the proceeding may be in the public interest. | Hearings under this chapter may be held before the Commission, any member or members thereof, or any representative of the Commission designated by it, and appropriate records thereof shall be kept. In any proceeding before it, the Commission in accordance with such rules and regulations as it may prescribe, may admit as a party any interested State, State commission, municipality or any representative of interested consumers or security holders, or any competitor of a party to such proceeding, or any other person whose participation in the proceeding may be in the public interest. | |||
| (f) | (f) Procedure | (f) Procedure | ||
| All hearings, investigations, and proceedings under this chapter shall be governed by rules of practice and procedure to be adopted by the Commission, and in the conduct thereof the technical rules of evidence need not be applied. No informality in any hearing, investigation, or proceeding or in the manner of taking testimony shall invalidate any order, decision, rule, or regulation issued under the authority of this chapter. | All hearings, investigations, and proceedings under this chapter shall be governed by rules of practice and procedure to be adopted by the Commission, and in the conduct thereof the technical rules of evidence need not be applied. No informality in any hearing, investigation, or proceeding or in the manner of taking testimony shall invalidate any order, decision, rule, or regulation issued under the authority of this chapter. | |||
| (g) | (g) [inserted: Additional requirements.—] | |||
| (g)(1) | (1) [inserted: Definition of Effects.—] | |||
| [inserted: In conducting a review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) relating to any Federal authorization (or to any other decision relating to the issuance of an order or certificate, or the approval or denial of an application, under section 3 or 7), the Commission shall consider the term “effects”, as used in that Act with respect to impacts and effects, to mean physical changes to the human environment as a result of a proposed action or alternative action to be carried out by a Federal agency that—] | ||||
| (g)(1)(A) | (A) [inserted: ] | |||
| [inserted: are reasonably foreseeable, not speculative, and not remote in time or geographically remote;] | ||||
| (g)(1)(B) | (B) [inserted: ] | |||
| [inserted: have a reasonably close causal relationship that is not the product of a lengthy causal chain to the proposed action or alternative action, respectively, as determined by the Commission;] | ||||
| (g)(1)(C) | (C) [inserted: ] | |||
| [inserted: the Commission has the ability to prevent and that would not occur absent the proposed action or alternative action; and] | ||||
| (g)(1)(D) | (D) [inserted: ] | |||
| [inserted: do not constitute potential effects from emissions upstream or downstream of the facility that is the subject of the application under section 3 or 7.] | ||||
| (g)(2) | (2) [inserted: Requirement.—] | |||
| [inserted: For purposes of paragraph (1)(B), a “but for” causal relationship is insufficient to establish a reasonably close causal relationship.] | ||||
| (g)(3) | (3) [inserted: Alternatives.—] | |||
| [inserted: In conducting a review described in paragraph (1), any alternatives required to be analyzed under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) by the Commission shall—] | ||||
| (g)(3)(A) | (A) [inserted: ] | |||
| [inserted: meet the purpose and need for the proposed action;] | ||||
| (g)(3)(B) | (B) [inserted: ] | |||
| [inserted: where applicable, meet the goals of the applicant; and] | ||||
| (g)(3)(C) | (C) [inserted: ] | |||
| [inserted: be within the authority of the Federal agency to control.] | ||||
| (g)(4) | (4) [inserted: No use of social cost metrics.—] | |||
| [inserted: In conducting a review described in paragraph (1), the Commission shall not consider or apply any metric that purports to estimate the monetized damages or benefits associated with incremental increases or decreases in greenhouse gas emissions.] | ||||
15 U.S.C. § 717r Rehearing and review
2 changes the bill asks for here, 2 carried out
- Carried out:
Section 19(a) of the Natural Gas Act (15 U.S.C. 717r(a)) is amended, in the fourth sentence, by striking
thirty
and inserting60
. - Carried out:
Section 19(d)(3) of the Natural Gas Act (15 U.S.C. 717r(d)(3)) is amended, in the first sentence, by inserting
, is not supported by clear and convincing evidence,
aftersuch permit
.
§ 717r(a)–(d)
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| § 717r. Rehearing and review | § 717r. Rehearing and review | |||
| (a) | (a) Application for rehearing; time | (a) Application for rehearing; time | ||
| Any person, State, municipality, or State commission aggrieved by an order issued by the Commission in a proceeding under this chapter to which such person, State, municipality, or State commission is a party may apply for a rehearing within | Any person, State, municipality, or State commission aggrieved by an order issued by the Commission in a proceeding under this chapter to which such person, State, municipality, or State commission is a party may apply for a rehearing within [inserted: 60] days after the issuance of such order. The application for rehearing shall set forth specifically the ground or grounds upon which such application is based. Upon such application the Commission shall have power to grant or deny rehearing or to abrogate or modify its order without further hearing. Unless the Commission acts upon the application for rehearing within thirty days after it is filed, such application may be deemed to have been denied. No proceeding to review any order of the Commission shall be brought by any person unless such person shall have made application to the Commission for a rehearing thereon. Until the record in a proceeding shall have been filed in a court of appeals, as provided in subsection (b), the Commission may at any time, upon reasonable notice and in such manner as it shall deem proper, modify or set aside, in whole or in part, any finding or order made or issued by it under the provisions of this chapter. | |||
| (b) | (b) Review of Commission order | (b) Review of Commission order | ||
| Any party to a proceeding under this chapter aggrieved by an order issued by the Commission in such proceeding may obtain a review of such order in the court of appeals of the United States for any circuit wherein the natural-gas company to which the order relates is located or has its principal place of business, or in the United States Court of Appeals for the District of Columbia, by filing in such court, within sixty days after the order of the Commission upon the application for rehearing, a written petition praying that the order of the Commission be modified or set aside in whole or in part. A copy of such petition shall forthwith be transmitted by the clerk of the court to any member of the Commission and thereupon the Commission shall file with the court the record upon which the order complained of was entered, as provided in section 2112 of title 28. Upon the filing of such petition such court shall have jurisdiction, which upon the filing of the record with it shall be exclusive, to affirm, modify, or set aside such order in whole or in part. No objection to the order of the Commission shall be considered by the court unless such objection shall have been urged before the Commission in the application for rehearing unless there is reasonable ground for failure so to do. The finding of the Commission as to the facts, if supported by substantial evidence, shall be conclusive. If any party shall apply to the court for leave to adduce additional evidence, and shall show to the satisfaction of the court that such additional evidence is material and that there were reasonable grounds for failure to adduce such evidence in the proceedings before the Commission, the court may order such additional evidence to be taken before the Commission and to be adduced upon the hearing in such manner and upon such terms and conditions as to the court may seem proper. The Commission may modify its findings as to the facts by reason of the additional evidence so taken, and it shall file with the court such modified or new findings, which is supported by substantial evidence, shall be conclusive, and its recommendation, if any, for the modification or setting aside of the original order. The judgment and decree of the court, affirming, modifying, or setting aside, in whole or in part, any such order of the Commission, shall be final, subject to review by the Supreme Court of the United States upon certiorari or certification as provided in section 1254 of title 28. | Any party to a proceeding under this chapter aggrieved by an order issued by the Commission in such proceeding may obtain a review of such order in the court of appeals of the United States for any circuit wherein the natural-gas company to which the order relates is located or has its principal place of business, or in the United States Court of Appeals for the District of Columbia, by filing in such court, within sixty days after the order of the Commission upon the application for rehearing, a written petition praying that the order of the Commission be modified or set aside in whole or in part. A copy of such petition shall forthwith be transmitted by the clerk of the court to any member of the Commission and thereupon the Commission shall file with the court the record upon which the order complained of was entered, as provided in section 2112 of title 28. Upon the filing of such petition such court shall have jurisdiction, which upon the filing of the record with it shall be exclusive, to affirm, modify, or set aside such order in whole or in part. No objection to the order of the Commission shall be considered by the court unless such objection shall have been urged before the Commission in the application for rehearing unless there is reasonable ground for failure so to do. The finding of the Commission as to the facts, if supported by substantial evidence, shall be conclusive. If any party shall apply to the court for leave to adduce additional evidence, and shall show to the satisfaction of the court that such additional evidence is material and that there were reasonable grounds for failure to adduce such evidence in the proceedings before the Commission, the court may order such additional evidence to be taken before the Commission and to be adduced upon the hearing in such manner and upon such terms and conditions as to the court may seem proper. The Commission may modify its findings as to the facts by reason of the additional evidence so taken, and it shall file with the court such modified or new findings, which is supported by substantial evidence, shall be conclusive, and its recommendation, if any, for the modification or setting aside of the original order. The judgment and decree of the court, affirming, modifying, or setting aside, in whole or in part, any such order of the Commission, shall be final, subject to review by the Supreme Court of the United States upon certiorari or certification as provided in section 1254 of title 28. | |||
| (c) | (c) Stay of Commission order | (c) Stay of Commission order | ||
| The filing of an application for rehearing under subsection (a) shall not, unless specifically ordered by the Commission, operate as a stay of the Commission’s order. The commencement of proceedings under subsection (b) of this section shall not, unless specifically ordered by the court, operate as a stay of the Commission’s order. | The filing of an application for rehearing under subsection (a) shall not, unless specifically ordered by the Commission, operate as a stay of the Commission’s order. The commencement of proceedings under subsection (b) of this section shall not, unless specifically ordered by the court, operate as a stay of the Commission’s order. | |||
| (d) | (d) Judicial review | (d) Judicial review | ||
| (d)(1) | (1) In general | (1) In general | ||
| The United States Court of Appeals for the circuit in which a facility subject to section 717b of this title or section 717f of this title is proposed to be constructed, expanded, or operated shall have original and exclusive jurisdiction over any civil action for the review of an order or action of a Federal agency (other than the Commission) or State administrative agency acting pursuant to Federal law to issue, condition, or deny any permit, license, concurrence, or approval (hereinafter collectively referred to as “permit”) required under Federal law, other than the Coastal Zone Management Act of 1972 (16 U.S.C. 1451 et seq.). | The United States Court of Appeals for the circuit in which a facility subject to section 717b of this title or section 717f of this title is proposed to be constructed, expanded, or operated shall have original and exclusive jurisdiction over any civil action for the review of an order or action of a Federal agency (other than the Commission) or State administrative agency acting pursuant to Federal law to issue, condition, or deny any permit, license, concurrence, or approval (hereinafter collectively referred to as “permit”) required under Federal law, other than the Coastal Zone Management Act of 1972 (16 U.S.C. 1451 et seq.). | |||
| (d)(2) | (2) Agency delay | (2) Agency delay | ||
| The United States Court of Appeals for the District of Columbia shall have original and exclusive jurisdiction over any civil action for the review of an alleged failure to act by a Federal agency (other than the Commission) or State administrative agency acting pursuant to Federal law to issue, condition, or deny any permit required under Federal law, other than the Coastal Zone Management Act of 1972 (16 U.S.C. 1451 et seq.), for a facility subject to section 717b of this title or section 717f of this title. The failure of an agency to take action on a permit required under Federal law, other than the Coastal Zone Management Act of 1972, in accordance with the Commission schedule established pursuant to section 717n(c) of this title shall be considered inconsistent with Federal law for the purposes of paragraph (3). | The United States Court of Appeals for the District of Columbia shall have original and exclusive jurisdiction over any civil action for the review of an alleged failure to act by a Federal agency (other than the Commission) or State administrative agency acting pursuant to Federal law to issue, condition, or deny any permit required under Federal law, other than the Coastal Zone Management Act of 1972 (16 U.S.C. 1451 et seq.), for a facility subject to section 717b of this title or section 717f of this title. The failure of an agency to take action on a permit required under Federal law, other than the Coastal Zone Management Act of 1972, in accordance with the Commission schedule established pursuant to section 717n(c) of this title shall be considered inconsistent with Federal law for the purposes of paragraph (3). | |||
| (d)(3) | (3) Court action | (3) Court action | ||
| If the Court finds that such order or action is inconsistent with the Federal law governing such permit and would prevent the construction, expansion, or operation of the facility subject to section 717b of this title or section 717f of this title, the Court shall remand the proceeding to the agency to take appropriate action consistent with the order of the Court. If the Court remands the order or action to the Federal or State agency, the Court shall set a reasonable schedule and deadline for the agency to act on remand. | If the Court finds that such order or action is inconsistent with the Federal law governing such permit[inserted: ,] [inserted: is not supported by clear ]and [inserted: convincing evidence, and ]would prevent the construction, expansion, or operation of the facility subject to section 717b of this title or section 717f of this title, the Court shall remand the proceeding to the agency to take appropriate action consistent with the order of the Court. If the Court remands the order or action to the Federal or State agency, the Court shall set a reasonable schedule and deadline for the agency to act on remand. | |||
| (d)(4) | (4) Commission action | (4) Commission action | ||
| For any action described in this subsection, the Commission shall file with the Court the consolidated record of such order or action to which the appeal hereunder relates. | For any action described in this subsection, the Commission shall file with the Court the consolidated record of such order or action to which the appeal hereunder relates. | |||
| (d)(5) | (5) Expedited review | (5) Expedited review | ||
| The Court shall set any action brought under this subsection for expedited consideration. | The Court shall set any action brought under this subsection for expedited consideration. |
15 U.S.C. § 717t–1 Civil penalty authority
1 change the bill asks for here, 1 carried out
- Carried out:
Section 22(b) of the Natural Gas Act (15 U.S.C. 717t–1(b)) is amended by inserting before the period at the end the following:
, in accordance with the same provisions as are applicable under section 31(d) of the Federal Power Act (16 U.S.C. 823b(d)) in the case of civil penalties assessed under that section of that Act (16 U.S.C. 823b)
.
§ 717t–1(a)–(c)
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| § 717t–1. Civil penalty authority | § 717t–1. Civil penalty authority | |||
| (a) | (a) In general | (a) In general | ||
| Any person that violates this chapter, or any rule, regulation, restriction, condition, or order made or imposed by the Commission under authority of this chapter, shall be subject to a civil penalty of not more than $1,000,000 per day per violation for as long as the violation continues. | Any person that violates this chapter, or any rule, regulation, restriction, condition, or order made or imposed by the Commission under authority of this chapter, shall be subject to a civil penalty of not more than $1,000,000 per day per violation for as long as the violation continues. | |||
| (b) | (b) Notice | (b) Notice | ||
| The penalty shall be assessed by the Commission after notice and opportunity for public hearing. | The penalty shall be assessed by the Commission after notice and opportunity for public hearing[inserted: , in accordance with the same provisions as are applicable under section 31(d) of the Federal Power Act (16 U].[inserted: S.C. 823b(d)) in the case of civil penalties assessed under that section of that Act (16 U.S.C. 823b).] | |||
| (c) | (c) Amount | (c) Amount | ||
| In determining the amount of a proposed penalty, the Commission shall take into consideration the nature and seriousness of the violation and the efforts to remedy the violation. | In determining the amount of a proposed penalty, the Commission shall take into consideration the nature and seriousness of the violation and the efforts to remedy the violation. |
16 U.S.C. § 824p Siting of interstate electric transmission facilities
3 changes the bill asks for here, 1 carried out
- Not carried out:
in subparagraph (B), by striking (B) The term and inserting the following:(B) Inclusions.— In this subsection, the term; and
The bill gives this provision a heading and rewords it at the same time, a kind of change we can't show yet.
Technical detail
the provision inserted says more than a heading and the words struck - Not carried out:
by striking (1) In this subsection and all that follows through The term in subparagraph (A) and inserting the following:
(1) Definition of Federal authorization.— (A) In general.— In this subsection, the term; and
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: striking QTEXT and all that follows through QTEXT in subparagraph (X) and inserting the following: QCONTENT; and - Carried out:
by adding at the end the following:
(10) Additional requirements.— (A) Definition of effects.— In conducting a review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) relating to any Federal authorization (or to any other decision relating to the issuance of a Federal authorization, or …
§ 824p(h)–(i)
Start of § 824p to (h)(9)(A) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (h)(9)(B) | (B) | (B) | ||
| electric reliability organizations (including related regional entities) approved by the Commission; and | electric reliability organizations (including related regional entities) approved by the Commission; and | |||
| (h)(9)(C) | (C) | (C) | ||
| Transmission Organizations approved by the Commission. | Transmission Organizations approved by the Commission. | |||
| (h)(10) | (10) [inserted: Additional requirements.—] | |||
| (h)(10)(A) | (A) [inserted: Definition of effects.—] | |||
| [inserted: In conducting a review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) relating to any Federal authorization (or to any other decision relating to the issuance of a Federal authorization, or the approval or denial of an application, under this section), the Commission shall consider the term “effects”, as used in that Act with respect to impacts and effects, to mean physical changes to the human environment as a result of a proposed action or alternative action to be carried out by a Federal agency that—] | ||||
| (h)(10)(A)(i) | (i) [inserted: ] | |||
| [inserted: are reasonably foreseeable, not speculative, and not remote in time or geographically remote;] | ||||
| (h)(10)(A)(ii) | (ii) [inserted: ] | |||
| [inserted: have a reasonably close causal relationship that is not the product of a lengthy causal chain to the proposed action or alternative action, respectively, as determined by the Commission;] | ||||
| (h)(10)(A)(iii) | (iii) [inserted: ] | |||
| [inserted: the Commission has the ability to prevent and that would not occur absent the proposed action or alternative action; and] | ||||
| (h)(10)(A)(iv) | (iv) [inserted: ] | |||
| [inserted: do not constitute potential effects from emissions upstream or downstream of the facility that is the subject of the application under this section.] | ||||
| (h)(10)(B) | (B) [inserted: Requirement.—] | |||
| [inserted: For purposes of subparagraph (A)(ii), a “but for” causal relationship is insufficient to establish a reasonably close causal relationship.] | ||||
| (h)(10)(C) | (C) [inserted: Alternatives.—] | |||
| [inserted: In conducting a review described in subparagraph (A), any alternatives required to be analyzed under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) by the Commission shall—] | ||||
| (h)(10)(C)(i) | (i) [inserted: ] | |||
| [inserted: meet the purpose and need for the proposed action;] | ||||
| (h)(10)(C)(ii) | (ii) [inserted: ] | |||
| [inserted: where applicable, meet the goals of the applicant; and] | ||||
| (h)(10)(C)(iii) | (iii) [inserted: ] | |||
| [inserted: be within the authority of the Federal agency to control.] | ||||
| (h)(10)(D) | (D) [inserted: No use of social cost metrics.—] | |||
| [inserted: In conducting a review described in subparagraph (A), the Commission shall not consider or apply any metric that purports to estimate the monetized damages or benefits associated with incremental increases or decreases in greenhouse gas emissions.] | ||||
| (i) | (i) Interstate compacts | (i) Interstate compacts | ||
| (i)(1) | (1) | (1) | ||
| The consent of Congress is given for three or more contiguous States to enter into an interstate compact, subject to approval by Congress, establishing regional transmission siting agencies to— | The consent of Congress is given for three or more contiguous States to enter into an interstate compact, subject to approval by Congress, establishing regional transmission siting agencies to— | |||
Rest of § 824p unchanged
16 U.S.C. § 825l Review of orders
1 change the bill asks for here, 1 carried out
- Carried out:
Section 313(a) of the Federal Power Act (16 U.S.C. 825l(a)) is amended, in the fourth sentence, by striking
thirty
and inserting60
.
§ 825l(a)–(c)
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| § 825l. Review of orders | § 825l. Review of orders | |||
| (a) | (a) Application for rehearing; time periods; modification of order | (a) Application for rehearing; time periods; modification of order | ||
| Any person, electric utility, State, municipality, or State commission aggrieved by an order issued by the Commission in a proceeding under this chapter to which such person, electric utility, State, municipality, or State commission is a party may apply for a rehearing within | Any person, electric utility, State, municipality, or State commission aggrieved by an order issued by the Commission in a proceeding under this chapter to which such person, electric utility, State, municipality, or State commission is a party may apply for a rehearing within [inserted: 60] days after the issuance of such order. The application for rehearing shall set forth specifically the ground or grounds upon which such application is based. Upon such application the Commission shall have power to grant or deny rehearing or to abrogate or modify its order without further hearing. Unless the Commission acts upon the application for rehearing within thirty days after it is filed, such application may be deemed to have been denied. No proceeding to review any order of the Commission shall be brought by any entity unless such entity shall have made application to the Commission for a rehearing thereon. Until the record in a proceeding shall have been filed in a court of appeals, as provided in subsection (b), the Commission may at any time, upon reasonable notice and in such manner as it shall deem proper, modify or set aside, in whole or in part, any finding or order made or issued by it under the provisions of this chapter. | |||
| (b) | (b) Judicial review | (b) Judicial review | ||
| Any party to a proceeding under this chapter aggrieved by an order issued by the Commission in such proceeding may obtain a review of such order in the United States court of appeals for any circuit wherein the licensee or public utility to which the order relates is located or has its principal place of business, or in the United States Court of Appeals for the District of Columbia, by filing in such court, within sixty days after the order of the Commission upon the application for rehearing, a written petition praying that the order of the Commission be modified or set aside in whole or in part. A copy of such petition shall forthwith be transmitted by the clerk of the court to any member of the Commission and thereupon the Commission shall file with the court the record upon which the order complained of was entered, as provided in section 2112 of title 28. Upon the filing of such petition such court shall have jurisdiction, which upon the filing of the record with it shall be exclusive, to affirm, modify, or set aside such order in whole or in part. No objection to the order of the Commission shall be considered by the court unless such objection shall have been urged before the Commission in the application for rehearing unless there is reasonable ground for failure so to do. The finding of the Commission as to the facts, if supported by substantial evidence, shall be conclusive. If any party shall apply to the court for leave to adduce additional evidence, and shall show to the satisfaction of the court that such additional evidence is material and that there were reasonable grounds for failure to adduce such evidence in the proceedings before the Commission, the court may order such additional evidence to be taken before the Commission and to be adduced upon the hearing in such manner and upon such terms and conditions as to the court may seem proper. The Commission may modify its findings as to the facts by reason of the additional evidence so taken, and it shall file with the court such modified or new findings which, if supported by substantial evidence, shall be conclusive, and its recommendation, if any, for the modification or setting aside of the original order. The judgment and decree of the court, affirming, modifying, or setting aside, in whole or in part, any such order of the Commission, shall be final, subject to review by the Supreme Court of the United States upon certiorari or certification as provided in section 1254 of title 28. | Any party to a proceeding under this chapter aggrieved by an order issued by the Commission in such proceeding may obtain a review of such order in the United States court of appeals for any circuit wherein the licensee or public utility to which the order relates is located or has its principal place of business, or in the United States Court of Appeals for the District of Columbia, by filing in such court, within sixty days after the order of the Commission upon the application for rehearing, a written petition praying that the order of the Commission be modified or set aside in whole or in part. A copy of such petition shall forthwith be transmitted by the clerk of the court to any member of the Commission and thereupon the Commission shall file with the court the record upon which the order complained of was entered, as provided in section 2112 of title 28. Upon the filing of such petition such court shall have jurisdiction, which upon the filing of the record with it shall be exclusive, to affirm, modify, or set aside such order in whole or in part. No objection to the order of the Commission shall be considered by the court unless such objection shall have been urged before the Commission in the application for rehearing unless there is reasonable ground for failure so to do. The finding of the Commission as to the facts, if supported by substantial evidence, shall be conclusive. If any party shall apply to the court for leave to adduce additional evidence, and shall show to the satisfaction of the court that such additional evidence is material and that there were reasonable grounds for failure to adduce such evidence in the proceedings before the Commission, the court may order such additional evidence to be taken before the Commission and to be adduced upon the hearing in such manner and upon such terms and conditions as to the court may seem proper. The Commission may modify its findings as to the facts by reason of the additional evidence so taken, and it shall file with the court such modified or new findings which, if supported by substantial evidence, shall be conclusive, and its recommendation, if any, for the modification or setting aside of the original order. The judgment and decree of the court, affirming, modifying, or setting aside, in whole or in part, any such order of the Commission, shall be final, subject to review by the Supreme Court of the United States upon certiorari or certification as provided in section 1254 of title 28. | |||
| (c) | (c) Stay of Commission’s order | (c) Stay of Commission’s order | ||
| The filing of an application for rehearing under subsection (a) shall not, unless specifically ordered by the Commission, operate as a stay of the Commission’s order. The commencement of proceedings under subsection (b) of this section shall not, unless specifically ordered by the court, operate as a stay of the Commission’s order. | The filing of an application for rehearing under subsection (a) shall not, unless specifically ordered by the Commission, operate as a stay of the Commission’s order. The commencement of proceedings under subsection (b) of this section shall not, unless specifically ordered by the court, operate as a stay of the Commission’s order. |
30 U.S.C. § 28f Fee
8 changes the bill asks for here, 5 carried out
- Carried out:
by striking
the Mining Law of 1872 (30 U.S.C. 28–28e)
each place it appears and insertingsections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.)
; - Not carried out:
in the second sentence, by striking Such claim maintenance fee and inserting the following:(B) Fee.— The claim maintenance fee under subparagraph (A); and
The bill puts these words in a provision numbered (B), which can't be the first one in § 28f(a)(1), so we couldn't tell where it goes.
Technical detail
(B) can't be the first provision of /us/usc/t30/s28f/a/1 - Carried out:
in the first sentence, by striking The holder of and inserting the following:(A) In general.— The holder of; and
- Carried out:
by striking
the Mining Law of 1872 (30 U.S.C. 28 to 28e)
and insertingsections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.)
; and - Not carried out:
by striking Such claim maintenance fee and inserting the following:(B) Fee.— The claim maintenance fee under subparagraph (A); and
The bill puts these words in a provision numbered (B), which can't be the first one in § 28f(a)(2), so we couldn't tell where it goes.
Technical detail
(B) can't be the first provision of /us/usc/t30/s28f/a/2 - Carried out:
in the first sentence, by striking The holder of and inserting the following:(A) In general.— The holder of; and
- Not carried out:
in the second sentence, by striking The location fee and inserting the following:(2) Fee.— The location fee; and
The bill turns “The location fee” into a provision of its own, but in § 28f(b) the text doesn't begin with those words. The law may have changed since the bill was drafted.
Technical detail
“The location fee” does not open the text of /us/usc/t30/s28f/b - Carried out:
in the first sentence, by striking The claim main tenance fee and inserting the following:(1) In general.— The claim maintenance fee.
§ 28f(a)–(d)
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| § 28f. Fee | § 28f. Fee | |||
| (a) | (a) Claim maintenance fee | (a) Claim maintenance fee | ||
| (a)(1) | (1) Lode mining claims, mill sites, and tunnel sites | (1) Lode mining claims, mill sites, and tunnel sites | ||
| (a)(1)(A) | (A) [inserted: In general.—] | |||
| [inserted: The holder of each unpatented lode mining claim, mill site, or tunnel site, located pursuant to the mining laws of the United States before, on, or after August 10, 1993, shall pay to the Secretary of the Interior, on or before September 1 of each year, to the extent provided in advance in appropriations Acts, a claim maintenance fee of $100 per claim or site, respectively. Such claim maintenance fee shall be in lieu of the assessment work requirement contained in sections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.) and the related filing requirements contained in section 1744(a) and (c) of title 43.] | ||||
| (a)(1) | ||||
| (a)(2) | (2) Placer mining claims | (2) Placer mining claims | ||
| (a)(2)(A) | (A) [inserted: In general.—] | |||
| [inserted: The holder of each unpatented placer mining claim located pursuant to the mining laws of the United States before, on, or after August 10, 1993, shall pay to the Secretary of the Interior, on or before September 1 of each year, the claim maintenance fee described in subsection (a)(1), for each 20 acres of the placer claim or portion thereof. Such claim maintenance fee shall be in lieu of the assessment work requirement contained in sections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.) 1 and the related filing requirements contained in section 1744(a) and (c) of title 43.] | ||||
| (a)(2) | ||||
| (b) | (b) Time of payment | (b) Time of payment | ||
| (b)(1) | (1) [inserted: In general.—] | |||
| [inserted: The claim maintenance fee under subsection (a) shall be paid for the year in which the location is made, at the time the location notice is recorded with the Bureau of Land Management. The location fee imposed under section 28g of this title shall be payable not later than 90 days after the date of location.] | ||||
| (b) | ||||
| (c) | (c) Oil shale claims subject to claim maintenance fees under Energy Policy Act of 1992 | (c) Oil shale claims subject to claim maintenance fees under Energy Policy Act of 1992 | ||
| This section shall not apply to any oil shale claims for which a fee is required to be paid under section 2511(e)(2) of the Energy Policy Act of 1992 (Public Law 102–486; 106 Stat. 3111; 30 U.S.C. 242). | This section shall not apply to any oil shale claims for which a fee is required to be paid under section 2511(e)(2) of the Energy Policy Act of 1992 (Public Law 102–486; 106 Stat. 3111; 30 U.S.C. 242). | |||
| (d) | (d) Waiver | (d) Waiver | ||
| (d)(1) | (1) | (1) | ||
| The claim maintenance fee required under this section may be waived for a claimant who certifies in writing to the Secretary that on the date the payment was due, the claimant and all related parties— | The claim maintenance fee required under this section may be waived for a claimant who certifies in writing to the Secretary that on the date the payment was due, the claimant and all related parties— | |||
| (d)(1)(A) | (A) | (A) | ||
| held not more than 10 mining claims, mill sites, or tunnel sites, or any combination thereof, on public lands; and | held not more than 10 mining claims, mill sites, or tunnel sites, or any combination thereof, on public lands; and | |||
| (d)(1)(B) | (B) | (B) | ||
| have performed assessment work required under | have performed assessment work required under [inserted: sections] [inserted: 2319] [inserted: through] [inserted: 2344 ]of [inserted: the] [inserted: Revised Statutes ](30 U.S.C. [inserted: 22 et seq.]) 1 to maintain the mining claims held by the claimant and such related parties for the assessment year ending on noon of September 1 of the calendar year in which payment of the claim maintenance fee was due. | |||
| (d)(2) | (2) | (2) | ||
| For purposes of paragraph (1), with respect to any claimant, the term “related party” means— | For purposes of paragraph (1), with respect to any claimant, the term “related party” means— | |||
| (d)(2)(A) | (A) | (A) | ||
| the spouse and dependent children (as defined in section 152 of title 26), of the claimant; and | the spouse and dependent children (as defined in section 152 of title 26), of the claimant; and | |||
Rest of § 28f unchanged
30 U.S.C. § 42 Patents for nonmineral lands: application, survey, notice, acreage limitation, payment
1 change the bill asks for here, 1 carried out
- Carried out:
Section 2337 of the Revised Statutes (30 U.S.C. 42) is amended by adding at the end the following:
(c) Additional mill sites.— (1) Definitions.— In this subsection: (A) Mill site.— The term “mill site” means a location of public land that is reasonably necessary for waste rock or tailings disposal or other operations reasonably incident to mineral development on, or …
§ 42(a)–(c)
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| § 42. Patents for nonmineral lands: application, survey, notice, acreage limitation, payment | § 42. Patents for nonmineral lands: application, survey, notice, acreage limitation, payment | |||
| (a) | (a) Vein or lode and mill site owners eligible | (a) Vein or lode and mill site owners eligible | ||
| Where nonmineral land not contiguous to the vein or lode is used or occupied by the proprietor of such vein or lode for mining or milling purposes, such nonadjacent surface ground may be embraced and included in an application for a patent for such vein or lode, and the same may be patented therewith, subject to the same preliminary requirements as to survey and notice as are applicable to veins or lodes; but no location made on and after May 10, 1872, of such nonadjacent land shall exceed five acres, and payment for the same must be made at the same rate as fixed by sections 21, 22 to 24, 26 to 28, 29, 30, 33 to 48, 50 to 52, 71 to 76 of this title and section 661 of title 43 for the superficies of the lode. The owner of a quartz mill or reduction works, not owning a mine in connection therewith, may also receive a patent for his mill site, as provided in this section. | Where nonmineral land not contiguous to the vein or lode is used or occupied by the proprietor of such vein or lode for mining or milling purposes, such nonadjacent surface ground may be embraced and included in an application for a patent for such vein or lode, and the same may be patented therewith, subject to the same preliminary requirements as to survey and notice as are applicable to veins or lodes; but no location made on and after May 10, 1872, of such nonadjacent land shall exceed five acres, and payment for the same must be made at the same rate as fixed by sections 21, 22 to 24, 26 to 28, 29, 30, 33 to 48, 50 to 52, 71 to 76 of this title and section 661 of title 43 for the superficies of the lode. The owner of a quartz mill or reduction works, not owning a mine in connection therewith, may also receive a patent for his mill site, as provided in this section. | |||
| (b) | (b) Placer claim owners eligible | (b) Placer claim owners eligible | ||
| Where nonmineral land is needed by the proprietor of a placer claim for mining, milling, processing, beneficiation, or other operations in connection with such claim, and is used or occupied by the proprietor for such purposes, such land may be included in an application for a patent for such claim, and may be patented therewith subject to the same requirements as to survey and notice as are applicable to placers. No location made of such nonmineral land shall exceed five acres and payment for the same shall be made at the rate applicable to placer claims which do not include a vein or lode. | Where nonmineral land is needed by the proprietor of a placer claim for mining, milling, processing, beneficiation, or other operations in connection with such claim, and is used or occupied by the proprietor for such purposes, such land may be included in an application for a patent for such claim, and may be patented therewith subject to the same requirements as to survey and notice as are applicable to placers. No location made of such nonmineral land shall exceed five acres and payment for the same shall be made at the rate applicable to placer claims which do not include a vein or lode. | |||
| (c) | (c) [inserted: Additional mill sites.—] | |||
| (c)(1) | (1) [inserted: Definitions.—] | |||
| [inserted: In this subsection:] | ||||
| (c)(1)(A) | (A) [inserted: Mill site.—] | |||
| [inserted: The term “mill site” means a location of public land that is reasonably necessary for waste rock or tailings disposal or other operations reasonably incident to mineral development on, or production from land included in a plan of operations.] | ||||
| (c)(1)(B) | (B) [inserted: Operations; Operator.—] | |||
| [inserted: The terms “operations” and “operator” have the meanings given those terms in section 3809.5 of title 43, Code of Federal Regulations (as in effect on the date of enactment of this subsection).] | ||||
| (c)(1)(C) | (C) [inserted: Plan of operations.—] | |||
| [inserted: The term “plan of operations” means a plan of operations that an operator must submit and the Secretary of the Interior or the Secretary of Agriculture, as applicable, must approve before an operator may begin operations, in accordance with, as applicable—] | ||||
| (c)(1)(C)(i) | (i) [inserted: ] | |||
| [inserted: subpart 3809 of part 3800 of title 43, Code of Federal Regulations (or successor regulations establishing application and approval requirements); and] | ||||
| (c)(1)(C)(ii) | (ii) [inserted: ] | |||
| [inserted: part 228 of title 36, Code of Federal Regulations (or successor regulations establishing application and approval requirements).] | ||||
| (c)(1)(D) | (D) [inserted: Public land.—] | |||
| [inserted: The term “public land” means land owned by the United States that is open to location under sections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.), including—] | ||||
| (c)(1)(D)(i) | (i) [inserted: ] | |||
| [inserted: land that is mineral-in-character (as defined in section 3830.5 of title 43, Code of Federal Regulations (as in effect on the date of enactment of this subsection));] | ||||
| (c)(1)(D)(ii) | (ii) [inserted: ] | |||
| [inserted: nonmineral land (as defined in section 3830.5 of title 43, Code of Federal Regulations (as in effect on the date of enactment of this subsection)); and] | ||||
| (c)(1)(D)(iii) | (iii) [inserted: ] | |||
| [inserted: land where the mineral character has not been determined.] | ||||
| (c)(2) | (2) [inserted: Use of public land.—] | |||
| [inserted: Notwithstanding subsections (a) and (b), where public land is needed by the proprietor of a lode or placer claim for operations in connection with any lode or placer claim within the proposed plan of operations, the proprietor may—] | ||||
| (c)(2)(A) | (A) [inserted: ] | |||
| [inserted: locate and include within the plan of operations as many mill site claims under this subsection as are reasonably necessary for its operations; and] | ||||
| (c)(2)(B) | (B) [inserted: ] | |||
| [inserted: use or occupy public land in accordance with an approved plan of operations.] | ||||
| (c)(3) | (3) [inserted: Mill sites convey no mineral rights.—] | |||
| [inserted: A mill site under this subsection does not convey mineral rights to the locator.] | ||||
| (c)(4) | (4) [inserted: Size of mill sites.—] | |||
| [inserted: A location of a single mill site under this subsection shall not exceed 5 acres.] | ||||
| (c)(5) | (5) [inserted: Mill site and lode or placer claims on same tracts of public land.—] | |||
| [inserted: A mill site may be located under this subsection on a tract of public land on which the claimant or operator maintains a previously located lode or placer claim.] | ||||
| (c)(6) | (6) [inserted: Effect on mining claims.—] | |||
| [inserted: The location of a mill site under this subsection shall not affect the validity of any lode or placer claim, or any rights associated with such a claim.] | ||||
| (c)(7) | (7) [inserted: Patenting.—] | |||
| [inserted: A mill site under this subsection shall not be eligible for patenting.] | ||||
| (c)(8) | (8) [inserted: Savings provisions.—] | |||
| [inserted: Nothing in this subsection—] | ||||
| (c)(8)(A) | (A) [inserted: ] | |||
| [inserted: diminishes any right (including a right of entry, use, or occupancy) of a claimant;] | ||||
| (c)(8)(B) | (B) [inserted: ] | |||
| [inserted: creates or increases any right (including a right of exploration, entry, use, or occupancy) of a claimant on land that is not open to location under the general mining laws;] | ||||
| (c)(8)(C) | (C) [inserted: ] | |||
| [inserted: modifies any provision of law or any prior administrative action withdrawing land from location or entry;] | ||||
| (c)(8)(D) | (D) [inserted: ] | |||
| [inserted: limits the right of the Federal Government to regulate mining and mining-related activities (including requiring claim validity examinations to establish the discovery of a valuable mineral deposit) in areas withdrawn from mining, including under—] | ||||
| (c)(8)(D)(i) | (i) [inserted: ] | |||
| [inserted: the general mining laws;] | ||||
| (c)(8)(D)(ii) | (ii) [inserted: ] | |||
| [inserted: the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.);] | ||||
| (c)(8)(D)(iii) | (iii) [inserted: ] | |||
| [inserted: the Wilderness Act (16 U.S.C. 1131 et seq.);] | ||||
| (c)(8)(D)(iv) | (iv) [inserted: ] | |||
| [inserted: subchapter III of chapter 1007 of title 54, United States Code;] | ||||
| (c)(8)(D)(v) | (v) [inserted: ] | |||
| [inserted: the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.);] | ||||
| (c)(8)(D)(vi) | (vi) [inserted: ] | |||
| [inserted: division A of subtitle III of title 54, United States Code (commonly referred to as the ‘National Historic Preservation Act’); or] | ||||
| (c)(8)(D)(vii) | (vii) [inserted: ] | |||
| [inserted: section 4 of the Act of July 23, 1955 (commonly known as the “Surface Resources Act of 1955”) (69 Stat. 368, chapter 375; 30 U.S.C. 612);] | ||||
| (c)(8)(E) | (E) [inserted: ] | |||
| [inserted: restores any right (including a right of entry, use, or occupancy, or right to conduct operations) of a claimant that—] | ||||
| (c)(8)(E)(i) | (i) [inserted: ] | |||
| [inserted: existed prior to the date on which the land was closed to, or withdrawn from, location under the general mining laws; and] | ||||
| (c)(8)(E)(ii) | (ii) [inserted: ] | |||
| [inserted: that has been extinguished by such closure or withdrawal; or] | ||||
| (c)(8)(F) | (F) [inserted: ] | |||
| [inserted: modifies section 404 of division E of the Consolidated Appropriations Act, 2024 (Public Law 118–42; 138 Stat. 284).] | ||||
30 U.S.C. § 201 Leases and exploration
3 changes the bill asks for here, 3 carried out
- Carried out:
by striking
he finds
and insertingthe Secretary of the Interior finds
; and - Carried out:
by striking
he shall, in his discretion, upon the request of any qualified applicant or on his own motion, from time to time, offer
and insertingthe Secretary of the Interior, not later than 90 days after the date of receipt of the request of any qualified applicant, or on the motion of the Secretary of the Interior not fewer than 4 times each calendar year, shall offer
; and - Carried out:
in the fifth sentence, by striking
No bid shall be accepted which is less than the fair market value, as determined by the Secretary,
and insertingNo bid shall be accepted that is less than the fair market value, as determined by the Secretary of the Interior by the date that is 45 days after the date of receipt of the bid,
.
§ 201(a)
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| § 201. Leases and exploration | § 201. Leases and exploration | |||
| (a) | (a) Leases | (a) Leases | ||
| (a)(1) | (1) | (1) | ||
| The Secretary of the Interior is authorized to divide any lands subject to this chapter which have been classified for coal leasing into leasing tracts of such size as | The Secretary of the Interior is authorized to divide any lands subject to this chapter which have been classified for coal leasing into leasing tracts of such size as [inserted: the] [inserted: Secretary of the Interior ]finds appropriate and in the public interest and which will permit the mining of all coal which can be economically extracted in such tract and thereafter [inserted: the] [inserted: Secretary] [inserted: of] [inserted: the] [inserted: Interior], [inserted: not] [inserted: later than 90 days after ]the [inserted: date of receipt of the ]request of any qualified applicant[inserted: ,] or on [inserted: the] motion [inserted: of] [inserted: the] [inserted: Secretary] [inserted: of the Interior not fewer than 4 times each calendar year], [inserted: shall ]offer such lands for leasing and shall award leases thereon by competitive bidding: Provided, That notwithstanding the competitive bidding requirement of this section, the Secretary may, subject to such conditions which he deems appropriate, negotiate the sale at fair market value of coal the removal of which is necessary and incidental to the exercise of a right-of-way permit issued pursuant to title V of the Federal Land Policy and Management Act of 1976 [43 U.S.C. 1761 et seq.]. No less than 50 per centum of the total acreage offered for lease by the Secretary in any one year shall be leased under a system of deferred bonus payment. Upon default or cancellation of any coal lease for which bonus payments are due, any unpaid remainder of the bid shall be immediately payable to the United States. A reasonable number of leasing tracts shall be reserved and offered for lease in accordance with this section to public bodies, including Federal agencies, rural electric cooperatives, or nonprofit corporations controlled by any of such entities: Provided, That the coal so offered for lease shall be for use by such entity or entities in implementing a definite plan to produce energy for their own use or for sale to their members or customers (except for short-term sales to others). No bid shall be accepted [inserted: that] is less than the fair market value, as determined by the Secretary[inserted: of the Interior by the date that is 45 days after the date of receipt of the bid], of the coal subject to the lease. Prior to his determination of the fair market value of the coal subject to the lease, the Secretary shall give opportunity for and consideration to public comments on the fair market value. Nothing in this section shall be construed to require the Secretary to make public his judgment as to the fair market value of the coal to be leased, or the comments he receives thereon prior to the issuance of the lease. He is authorized, in awarding leases for coal lands improved and occupied or claimed in good faith, prior to February 25, 1920, to consider and recognize equitable rights of such occupants or claimants. | |||
| (a)(2) | (2) | (2) | ||
| (a)(2)(A) | (A) | (A) | ||
| The Secretary shall not issue a lease or leases under the terms of this chapter to any person, association, corporation, or any subsidiary, affiliate, or persons controlled by or under common control with such person, association, or corporation, where any such entity holds a lease or leases issued by the United States to coal deposits and has held such lease or leases for a period of ten years when such entity is not, except as provided for in section 207(b) of this title, producing coal from the lease deposits in commercial quantities. In computing the ten-year period referred to in the preceding sentence, periods of time prior to August 4, 1976, shall not be counted. | The Secretary shall not issue a lease or leases under the terms of this chapter to any person, association, corporation, or any subsidiary, affiliate, or persons controlled by or under common control with such person, association, or corporation, where any such entity holds a lease or leases issued by the United States to coal deposits and has held such lease or leases for a period of ten years when such entity is not, except as provided for in section 207(b) of this title, producing coal from the lease deposits in commercial quantities. In computing the ten-year period referred to in the preceding sentence, periods of time prior to August 4, 1976, shall not be counted. |
Rest of § 201 unchanged
30 U.S.C. § 226 Leasing of oil and gas parcels
5 changes the bill asks for here, 4 carried out
- Carried out:
Section 17(b)(1)(A) of the Mineral Leasing Act (30 U.S.C. 226(b)(1)(A)) is amended by inserting after the seventh sentence the following:
The Secretary of the Interior shall resolve any protest to a lease sale within 60 days following such payment. Notwithstanding any other provision of law, if the Secretary of the Interior denies a protest to a lease sale, any lease subject to the protest shall not be subject to further environmental review by the Secretary of the Interior pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
. - Carried out:
Section 17 of the Mineral Leasing Act (30 U.S.C. 226) is amended by adding at the end the following:
(r) Effect of litigation.— (1) In general.— A civil action relating to an environmental review under the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.), division A of subtitle III of title 54, United States Code (formerly known as the “National Historic …
- Carried out:
Section 17 of the Mineral Leasing Act (30 U.S.C. 226) (as amended by paragraph (2)) is amended by adding at the end the following:
(s) Lease cancellation.— A lease issued under this section shall be considered to be valid and not subject to cancellation by the Secretary of the Interior for any reason, except for— (1) the express written agreement to the cancellation by the lessee; or (2) a determination by …
- Not carried out:
by striking the subsection designation and all that follows through Secretary of the Interior, or in the first sentence and inserting the following:
(g) (1) The Secretary of the Interior, or; and
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: striking the subsection designation and all that follows through QTEXT in the first sentence and inserting the following: QCONTENT; and - Carried out:
by adding at the end the following:
(2) (A) In the case of an oil and gas lease under this Act on land described in subparagraph (B) located within an oil and gas drilling or spacing unit, nothing in this Act authorizes the Secretary of the Interior— (i) to require a bond to protect non-Federal land; (ii) to enter …
§ 226(b)Lands within known geologic structure of a producing oil or gas field; lands within special tar sand areas; competitive bidding; royalties(1)
Start of § 226 to (a)(2)(B) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (b) | (b) Lands within known geologic structure of a producing oil or gas field; lands within special tar sand areas; competitive bidding; royalties | (b) Lands within known geologic structure of a producing oil or gas field; lands within special tar sand areas; competitive bidding; royalties | ||
| (1) | (1) | (1) | ||
| (1)(A) | (A) | (A) | ||
| All lands to be leased which are not subject to leasing under paragraphs (2) and (3) of this subsection shall be leased as provided in this paragraph to the highest responsible qualified bidder by competitive bidding under general regulations in units of not more than 2,560 acres, except in Alaska, where units shall be not more than 5,760 acres. Such units shall be as nearly compact as possible. Lease sales shall be conducted by oral bidding, except as provided in subparagraph (C). Lease sales shall be held for each State where eligible lands are available at least quarterly and more frequently if the Secretary of the Interior determines such sales are necessary. For purposes of the previous sentence, the term “eligible lands” means all lands that are subject to leasing under this chapter and are not excluded from leasing by a statutory prohibition, and the term “available”, with respect to eligible lands, means those lands that have been designated as open for leasing under a land use plan developed under section 1712 of title 43 and that have been nominated for leasing through the submission of an expression of interest, are subject to drainage in the absence of leasing, or are otherwise designated as available pursuant to regulations adopted by the Secretary. A lease shall be conditioned upon the payment of a royalty at a rate of not less than 12.5 percent in amount or value of the production removed or sold from the lease. The Secretary shall accept the highest bid from a responsible qualified bidder which is equal to or greater than the national minimum acceptable bid, without evaluation of the value of the lands proposed for lease. Leases shall be issued within 60 days following payment by the successful bidder of the remainder of the bonus bid, if any, and the annual rental for the first lease year. All bids for less than the national minimum acceptable bid shall be rejected. Lands for which no bids are received or for which the highest bid is less than the national minimum acceptable bid shall be offered promptly within 30 days for leasing under subsection (c) of this section and shall remain available for leasing for a period of 2 years after the competitive lease sale. | All lands to be leased which are not subject to leasing under paragraphs (2) and (3) of this subsection shall be leased as provided in this paragraph to the highest responsible qualified bidder by competitive bidding under general regulations in units of not more than 2,560 acres, except in Alaska, where units shall be not more than 5,760 acres. Such units shall be as nearly compact as possible. Lease sales shall be conducted by oral bidding, except as provided in subparagraph (C). Lease sales shall be held for each State where eligible lands are available at least quarterly and more frequently if the Secretary of the Interior determines such sales are necessary. For purposes of the previous sentence, the term “eligible lands” means all lands that are subject to leasing under this chapter and are not excluded from leasing by a statutory prohibition, and the term “available”, with respect to eligible lands, means those lands that have been designated as open for leasing under a land use plan developed under section 1712 of title 43 and that have been nominated for leasing through the submission of an expression of interest, are subject to drainage in the absence of leasing, or are otherwise designated as available pursuant to regulations adopted by the Secretary. A lease shall be conditioned upon the payment of a royalty at a rate of not less than 12.5 percent in amount or value of the production removed or sold from the lease. The Secretary shall accept the highest bid from a responsible qualified bidder which is equal to or greater than the national minimum acceptable bid, without evaluation of the value of the lands proposed for lease. [inserted: The Secretary of the Interior shall resolve any protest to a lease sale within 60 days following such payment. Notwithstanding any other provision of law, if the Secretary of the Interior denies a protest to a lease sale, any lease subject to the protest shall not be subject to further environmental review by the Secretary of the Interior pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.). ]Leases shall be issued within 60 days following payment by the successful bidder of the remainder of the bonus bid, if any, and the annual rental for the first lease year. All bids for less than the national minimum acceptable bid shall be rejected. Lands for which no bids are received or for which the highest bid is less than the national minimum acceptable bid shall be offered promptly within 30 days for leasing under subsection (c) of this section and shall remain available for leasing for a period of 2 years after the competitive lease sale. | |||
| (1)(B) | (B) | (B) | ||
| The national minimum acceptable bid shall be $10 per acre during the 10-year period beginning on August 16, 2022. Thereafter, the Secretary, subject to paragraph (2)(B), may establish by regulation a higher national minimum acceptable bid for all leases based upon a finding that such action is necessary: (i) to enhance financial returns to the United States; and (ii) to promote more efficient management of oil and gas resources on Federal lands. Ninety days before the Secretary makes any change in the national minimum acceptable bid, the Secretary shall notify the Committee on Natural Resources of the United States House of Representatives and the Committee on Energy and Natural Resources of the United States Senate. The proposal or promulgation of any regulation to establish a national minimum acceptable bid shall not be considered a major Federal action subject to the requirements of section 4332(2)(C) of title 42. | The national minimum acceptable bid shall be $10 per acre during the 10-year period beginning on August 16, 2022. Thereafter, the Secretary, subject to paragraph (2)(B), may establish by regulation a higher national minimum acceptable bid for all leases based upon a finding that such action is necessary: (i) to enhance financial returns to the United States; and (ii) to promote more efficient management of oil and gas resources on Federal lands. Ninety days before the Secretary makes any change in the national minimum acceptable bid, the Secretary shall notify the Committee on Natural Resources of the United States House of Representatives and the Committee on Energy and Natural Resources of the United States Senate. The proposal or promulgation of any regulation to establish a national minimum acceptable bid shall not be considered a major Federal action subject to the requirements of section 4332(2)(C) of title 42. | |||
| (1)(C) | (C) | (C) | ||
| In order to diversify and expand the Nation’s onshore leasing program to ensure the best return to the Federal taxpayer, reduce fraud, and secure the leasing process, the Secretary may conduct onshore lease sales through Internet-based bidding methods. Each individual Internet-based lease sale shall conclude within 7 days. | In order to diversify and expand the Nation’s onshore leasing program to ensure the best return to the Federal taxpayer, reduce fraud, and secure the leasing process, the Secretary may conduct onshore lease sales through Internet-based bidding methods. Each individual Internet-based lease sale shall conclude within 7 days. |
§ 226(f)–(i)
(b)(2)–(e) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (f) | (f) Notice of proposed action; posting of notice; terms and maps | (f) Notice of proposed action; posting of notice; terms and maps | ||
| At least 45 days before offering lands for lease under this section, and at least 30 days before approving applications for permits to drill under the provisions of a lease or substantially modifying the terms of any lease issued under this section, the Secretary shall provide notice of the proposed action. Such notice shall be posted in the appropriate local office of the leasing and land management agencies. Such notice shall include the terms or modified lease terms and maps or a narrative description of the affected lands. Where the inclusion of maps in such notice is not practicable, maps of the affected lands shall be made available to the public for review. Such maps shall show the location of all tracts to be leased, and of all leases already issued in the general area. The requirements of this subsection are in addition to any public notice required by other law. | At least 45 days before offering lands for lease under this section, and at least 30 days before approving applications for permits to drill under the provisions of a lease or substantially modifying the terms of any lease issued under this section, the Secretary shall provide notice of the proposed action. Such notice shall be posted in the appropriate local office of the leasing and land management agencies. Such notice shall include the terms or modified lease terms and maps or a narrative description of the affected lands. Where the inclusion of maps in such notice is not practicable, maps of the affected lands shall be made available to the public for review. Such maps shall show the location of all tracts to be leased, and of all leases already issued in the general area. The requirements of this subsection are in addition to any public notice required by other law. | |||
| (g) | (g) Regulation of surface-disturbing activities; approval of plan of operations; bond or surety; failure to comply with reclamation requirements as barring lease; opportunity to comply with requirements | (g) Regulation of surface-disturbing activities; approval of plan of operations; bond or surety; failure to comply with reclamation requirements as barring lease; opportunity to comply with requirements | ||
| The Secretary of the Interior, or for National Forest lands, the Secretary of Agriculture, shall regulate all surface-disturbing activities conducted pursuant to any lease issued under this chapter, and shall determine reclamation and other actions as required in the interest of conservation of surface resources. No permit to drill on an oil and gas lease issued under this chapter may be granted without the analysis and approval by the Secretary concerned of a plan of operations covering proposed surface-disturbing activities within the lease area. The Secretary concerned shall, by rule or regulation, establish such standards as may be necessary to ensure that an adequate bond, surety, or other financial arrangement will be established prior to the commencement of surface-disturbing activities on any lease, to ensure the complete and timely reclamation of the lease tract, and the restoration of any lands or surface waters adversely affected by lease operations after the abandonment or cessation of oil and gas operations on the lease. The Secretary shall not issue a lease or leases or approve the assignment of any lease or leases under the terms of this section to any person, association, corporation, or any subsidiary, affiliate, or person controlled by or under common control with such person, association, or corporation, during any period in which, as determined by the Secretary of the Interior or Secretary of Agriculture, such entity has failed or refused to comply in any material respect with the reclamation requirements and other standards established under this section for any prior lease to which such requirements and standards applied. Prior to making such determination with respect to any such entity the concerned Secretary shall provide such entity with adequate notification and an opportunity to comply with such reclamation requirements and other standards and shall consider whether any administrative or judicial appeal is pending. Once the entity has complied with the reclamation requirement or other standard concerned an oil or gas lease may be issued to such entity under this chapter. | The Secretary of the Interior, or for National Forest lands, the Secretary of Agriculture, shall regulate all surface-disturbing activities conducted pursuant to any lease issued under this chapter, and shall determine reclamation and other actions as required in the interest of conservation of surface resources. No permit to drill on an oil and gas lease issued under this chapter may be granted without the analysis and approval by the Secretary concerned of a plan of operations covering proposed surface-disturbing activities within the lease area. The Secretary concerned shall, by rule or regulation, establish such standards as may be necessary to ensure that an adequate bond, surety, or other financial arrangement will be established prior to the commencement of surface-disturbing activities on any lease, to ensure the complete and timely reclamation of the lease tract, and the restoration of any lands or surface waters adversely affected by lease operations after the abandonment or cessation of oil and gas operations on the lease. The Secretary shall not issue a lease or leases or approve the assignment of any lease or leases under the terms of this section to any person, association, corporation, or any subsidiary, affiliate, or person controlled by or under common control with such person, association, or corporation, during any period in which, as determined by the Secretary of the Interior or Secretary of Agriculture, such entity has failed or refused to comply in any material respect with the reclamation requirements and other standards established under this section for any prior lease to which such requirements and standards applied. Prior to making such determination with respect to any such entity the concerned Secretary shall provide such entity with adequate notification and an opportunity to comply with such reclamation requirements and other standards and shall consider whether any administrative or judicial appeal is pending. Once the entity has complied with the reclamation requirement or other standard concerned an oil or gas lease may be issued to such entity under this chapter. | |||
| (g)(2) | (2) [inserted: ] | |||
| (g)(2)(A) | (A) [inserted: ] | |||
| [inserted: In the case of an oil and gas lease under this Act on land described in subparagraph (B) located within an oil and gas drilling or spacing unit, nothing in this Act authorizes the Secretary of the Interior—] | ||||
| (g)(2)(A)(i) | (i) [inserted: ] | |||
| [inserted: to require a bond to protect non-Federal land;] | ||||
| (g)(2)(A)(ii) | (ii) [inserted: ] | |||
| [inserted: to enter non-Federal land without the consent of the applicable landowner;] | ||||
| (g)(2)(A)(iii) | (iii) [inserted: ] | |||
| [inserted: to impose mitigation requirements; or] | ||||
| (g)(2)(A)(iv) | (iv) [inserted: ] | |||
| [inserted: to require approval for surface reclamation.] | ||||
| (g)(2)(B) | (B) [inserted: ] | |||
| [inserted: Land referred to in subparagraph (A) is—] | ||||
| (g)(2)(B)(i) | (i) [inserted: ] | |||
| [inserted: land with respect to which the Federal Government—] | ||||
| (g)(2)(B)(i)(I) | (I) [inserted: ] | |||
| [inserted: owns less than 50 percent of the minerals within the oil and gas drilling or spacing unit; and] | ||||
| (g)(2)(B)(i)(II) | (II) [inserted: ] | |||
| [inserted: does not own or lease the surface estate within the area directly impacted by the action;] | ||||
| (g)(2)(B)(ii) | (ii) [inserted: ] | |||
| [inserted: non-Federal land overlying a non-Federal mineral estate on which the applicable well is located, but some portion of the wellbore enters and produces from the Federal mineral estate subject to the lease; or] | ||||
| (g)(2)(B)(iii) | (iii) [inserted: ] | |||
| [inserted: non-Federal land overlying a non-Federal mineral estate on which the well is located, but some portion of the wellbore traverses but does not produce from the Federal mineral estate subject to the lease.] | ||||
| (h) | (h) National Forest System Lands | (h) National Forest System Lands | ||
| The Secretary of the Interior may not issue any lease on National Forest System Lands reserved from the public domain over the objection of the Secretary of Agriculture. | The Secretary of the Interior may not issue any lease on National Forest System Lands reserved from the public domain over the objection of the Secretary of Agriculture. | |||
| (i) | (i) Termination | (i) Termination | ||
| No lease issued under this section which is subject to termination because of cessation of production shall be terminated for this cause so long as reworking or drilling operations which were commenced on the land prior to or within sixty days after cessation of production are conducted thereon with reasonable diligence, or so long as oil or gas is produced in paying quantities as a result of such operations. No lease issued under this section shall expire because operations or production is suspended under any order, or with the consent, of the Secretary. No lease issued under this section covering lands on which there is a well capable of producing oil or gas in paying quantities shall expire because the lessee fails to produce the same unless the lessee is allowed a reasonable time, which shall be not less than sixty days after notice by registered or certified mail, within which to place such well in producing status or unless, after such status is established, production is discontinued on the leased premises without permission granted by the Secretary under the provisions of this chapter. | No lease issued under this section which is subject to termination because of cessation of production shall be terminated for this cause so long as reworking or drilling operations which were commenced on the land prior to or within sixty days after cessation of production are conducted thereon with reasonable diligence, or so long as oil or gas is produced in paying quantities as a result of such operations. No lease issued under this section shall expire because operations or production is suspended under any order, or with the consent, of the Secretary. No lease issued under this section covering lands on which there is a well capable of producing oil or gas in paying quantities shall expire because the lessee fails to produce the same unless the lessee is allowed a reasonable time, which shall be not less than sixty days after notice by registered or certified mail, within which to place such well in producing status or unless, after such status is established, production is discontinued on the leased premises without permission granted by the Secretary under the provisions of this chapter. | |||
§ 226(p)–(s)
(j)–(p) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (p)(4) | (4) Term | (4) Term | ||
| A permit to drill approved under this subsection shall be valid for a single, non-renewable 4-year period beginning on the date that the permit to drill is approved. | A permit to drill approved under this subsection shall be valid for a single, non-renewable 4-year period beginning on the date that the permit to drill is approved. | |||
| (q) | (q) Commingling of production | (q) Commingling of production | ||
| The Secretary of the Interior shall approve applications allowing for the commingling of production from 2 or more sources (including the area of an oil and gas lease, the area included in a drilling spacing unit, a unit participating area, a communitized area, or non-Federal property) before production reaches the point of royalty measurement regardless of ownership, the royalty rates, and the number or percentage of acres for each source if the applicant agrees to install measurement devices for each source, utilize an allocation method that achieves volume measurement uncertainty levels within plus or minus 2 percent during the production phase reported on a monthly basis, or utilize an approved periodic well testing methodology. Production from multiple oil and gas leases, drilling spacing units, communitized areas, or participating areas from a single wellbore shall be considered a single source. Nothing in this subsection shall prevent the Secretary of the Interior from continuing the current practice of exercising discretion to authorize higher percentage volume measurement uncertainty levels if appropriate technical and economic justifications have been provided. | The Secretary of the Interior shall approve applications allowing for the commingling of production from 2 or more sources (including the area of an oil and gas lease, the area included in a drilling spacing unit, a unit participating area, a communitized area, or non-Federal property) before production reaches the point of royalty measurement regardless of ownership, the royalty rates, and the number or percentage of acres for each source if the applicant agrees to install measurement devices for each source, utilize an allocation method that achieves volume measurement uncertainty levels within plus or minus 2 percent during the production phase reported on a monthly basis, or utilize an approved periodic well testing methodology. Production from multiple oil and gas leases, drilling spacing units, communitized areas, or participating areas from a single wellbore shall be considered a single source. Nothing in this subsection shall prevent the Secretary of the Interior from continuing the current practice of exercising discretion to authorize higher percentage volume measurement uncertainty levels if appropriate technical and economic justifications have been provided. | |||
| (r) | (r) [inserted: Effect of litigation.—] | |||
| (r)(1) | (1) [inserted: In general.—] | |||
| [inserted: A civil action relating to an environmental review under the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.), division A of subtitle III of title 54, United States Code (formerly known as the “National Historic Preservation Act”), or the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to a lease sale conducted under this section shall not—] | ||||
| (r)(1)(A) | (A) [inserted: ] | |||
| [inserted: affect the validity of a lease issued under the lease sale that is the subject of the civil action; or] | ||||
| (r)(1)(B) | (B) [inserted: ] | |||
| [inserted: except as provided in paragraph (3)(B), cause a delay in the timelines established under subsection (p)(2) for the consideration of an application for permit to drill with respect to a lease issued under the lease sale that is the subject of the civil action.] | ||||
| (r)(2) | (2) [inserted: Remand; processing of applications for permit to drill.—] | |||
| [inserted: If, in a civil action described in paragraph (1), the environmental review for a lease sale is found by the applicable court to violate the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.)—] | ||||
| (r)(2)(A) | (A) [inserted: ] | |||
| [inserted: notwithstanding chapter 5 or 7 of title 5, United States Code (commonly referred to as the “Administrative Procedure Act”), the applicable court shall not set aside the lease sale and vacate the leases issued pursuant to the sale but instead remand the matter to the Secretary of the Interior to resolve the violation; and] | ||||
| (r)(2)(B) | (B) [inserted: ] | |||
| [inserted: the Secretary of the Interior shall continue to process all applicable applications for permit to drill pursuant to subsection (p)(2).] | ||||
| (r)(3) | (3) [inserted: Notice.—] | |||
| (r)(3)(A) | (A) [inserted: In general.—] | |||
| [inserted: Not later than 60 days after the date on which a civil action described in paragraph (1) is filed, the Secretary of the Interior shall notify the holder of any lease issued under the lease sale that is the subject of the civil action of the filing of the civil action.] | ||||
| (r)(3)(B) | (B) [inserted: Timeline.—] | |||
| [inserted: Not later than 90 days after the date of receipt of a notice under subparagraph (A), the leaseholder may file with the Secretary of the Interior a request to pause the timeline under subsection (e)(1) with respect to the term of the lease during any period in which the civil action is pending.] | ||||
| (s) | (s) [inserted: Lease cancellation.—] | |||
| [inserted: A lease issued under this section shall be considered to be valid and not subject to cancellation by the Secretary of the Interior for any reason, except for—] | ||||
| (s)(1) | (1) [inserted: ] | |||
| [inserted: the express written agreement to the cancellation by the lessee; or] | ||||
| (s)(2) | (2) [inserted: ] | |||
| [inserted: a determination by the Secretary of the Interior that cancellation is appropriate in accordance with section 3108.30 of title 43, Code of Federal Regulations (as in effect on the date of enactment of this subsection), subject to the limitation that a lease may not be determined to be improperly issued under that section based on a finding by a Federal court that the environmental review for the lease sale pursuant to which the lease was issued was in violation of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.), division A of subtitle III of title 54, United States Code (formerly known as the “National Historic Preservation Act”), or the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).] | ||||